MACKINAW_(WLBB_240)_DD_FY19_SECTION_B.xls
XLS spreadsheet 36 KB Posted
- Attached to
- DRYDOCK REPAIRS FOR THE USCGC MACKINAW
- Solicitation number
- 70Z08519-Q-P4505400
About this file
SECTION B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_002_MACKINAW_DD.docx | DOCX document | |
| QUESTION_ANSWERS_MACK_DD_22FEB19.docx | DOCX document | |
| Mackinaw_DD_2018_Scope_of_Supply_rev4_(002).pdf | ||
| REVISED_MACKINAW_DD_SECTION_B.xls | XLS spreadsheet | |
| Amendment_001_MACKINAW_DD.docx | DOCX document | |
| CGC_MCAKINAW_DDFY19_-_PAST_PERFORMANCE.doc | DOC document | |
| CGC_MACKINAW_70Z085-19-Q-P4505400.pdf | ||
| CGC_MACKINAW_DDFY19_-_DHS_Form_700-23_DHS_Subcontracting_Plan_Review_Checklist.pdf | ||
| CGC_MACKINAW_DDFY19_-_OMBUDSMAN.doc | DOC document | |
| CGC_MACKINAW_DDFY19_-_Attachment_-Request_for_Clarification.doc | DOC document | |
| MACKINAW_DD_FY19_SPECIFICATIONS.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC MACKINAW (WLBB-240) DRYDOCK AVAILABILITY FY2019 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | ||
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | ||
| D-003 | U/W Body, Preserve (100%) | JOB | 1 | ||
| D-004 | U/W Body, Preserve (Partial - Condition A) | JOB | 1 | ||
| D-005 | Appendages (U/W), Leak Test | JOB | 1 | ||
| D-006 | Appendages (U/W) - Internal, Preserve | JOB | 1 | ||
| D-007 | Chain Locker(s), Clean and Inspect | JOB | 1 | ||
| D-008 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | ||
| D-009 | Tanks (Mp Fuel Service), Clean And Inspect | JOB | 1 | ||
| D-010 | Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect | JOB | 1 | ||
| D-011 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | ||
| D-012 | Tanks (Lube Oil), Clean and Inspect | JOB | 1 | ||
| D-013 | Tanks (Ballast), Clean and Inspect | JOB | 1 | ||
| D-014 | Voids (Accessible), Clean and Inspect | JOB | 1 | ||
| D-015 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | ||
| D-016 | Propellers, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-017 | Box Coolers, Clean, Inspect, and Test | JOB | 1 | ||
| D-018 | Fathometer Transducer, General Maintenance | JOB | 1 | ||
| D-019 | Underwater (Speed) Log Transducer(s), Service and Inspect | JOB | 1 | ||
| D-020 | Sea Valves and Waster Pieces, Overhaul or Renew | JOB | 1 | ||
| D-021 | Fixed CO2 Cylinders, Weight & Test | JOB | 1 | ||
| D-022 | Galley APC System, Test, Service, Renew Fuse-Able Link | JOB | 1 | ||
| D-023 | Bow Thruster Unit, Inspect | JOB | 1 | ||
| D-024 | Bow Thruster Unit AC Motor, Clean and Inspect | JOB | 1 | ||
| D-025 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | ||
| D-026 | Sewage Vacuum Pumps, Overhaul | JOB | 1 | ||
| D-027 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | ||
| D-028 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | ||
| D-029 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | ||
| D-030 | Impressed Current Cathodic Protection System, Inspect and Maintain | JOB | 1 | ||
| D-031 | Impressed Current Cathodic Protection System Anodes, Renew | JOB | 1 | ||
| D-032 | Impressed Current Cathodic Protection System Reference Cells, Renew | JOB | 1 | ||
| D-033 | Impressed Current Cathodic Protection System Dielectric Shield, Repair | JOB | 1 | ||
| D-034 | Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew | JOB | 1 | ||
| D-035 | Drydock | JOB | 1 | ||
| D-036 | Temporary Services, Provide (For Azipod Tech Rep) | JOB | 1 | ||
| D-037 | Temporary Services, Provide - Tender | JOB | 1 | ||
| D-038 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| D-039 | Azipod Propulsion System Planned Drydock Maintenance (Azipod Removed), Support | JOB | 1 | ||
| D-040 | Sewage Holding Tank, Repair | JOB | 1 | ||
| D-041 | Provide Access to Various Compartments for Ship’s Structure and Machinery Evaluation Board (SSMEB) Inspection | JOB | 1 | ||
| D-042 | Vent Ducts (Engine And Motor Room All), Commercial Cleaning | JOB | 1 | ||
| D-043 | Vent Ducts (Galley and Pantry Room All), Commercial Cleaning | JOB | 1 | ||
| D-044 | Vent Ducts (Laundry Exhaust), Commercial Cleaning | JOB | 1 | ||
| D-045 | Vent Ducts (All Other), Commercial Cleaning | JOB | 1 | ||
| D-046 | Tanks (Grey Water Holding), Preserve “Partial” | JOB | 1 | ||
| D-047 | Tanks (Ballast), Preserve “Partial” | JOB | 1 | ||
| D-048 | Chain Locker, Preserve 100% | JOB | 1 | ||
| D-049 | Tanks (Dirty Oil and Waste), Preserve “Partial” | JOB | 1 | ||
| D-050 | Tanks (Potable Water), Preserve “Partial” | JOB | 1 | ||
| D-051 | Hull And Structural Plating (General) - Cracked Steel Welds, Repairs | JOB | 1 | ||
| D-052 | Hull And Structural Plating (General) - Degraded Weld (Steel), Repair | JOB | 1 | ||
| D-053 | Voids (Accessible, Weather Deck Exposed), Inspect | JOB | 1 | ||
| D-054 | Potable Water Pneumatic Tank(s), Clean and Inspect | JOB | 1 | ||
| D-055 | Tanks (Sewage Holding), Preserve “100%” | JOB | 1 | ||
| D-056 | Installation of Reverse Osmosis Water System | JOB | 1 | ||
| D-057 | Fuel Oil Coalescer Isolation Valves, Renew | JOB | 1 | ||
| D-058 | Air Conditioning System Piping Insulation, Renew | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 2730 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(9/12/2018) Draft-6 - Page &P of &N
File details come from the government source that posted it.