BLANK_IGE_175_WLM_Thruster_Groom__Assessment_20181211.xlsx

XLSX spreadsheet 49 KB Posted

Attached to
WLM THRUSTER GROOM
Solicitation number
70Z085-19-Q-P4504500
Issued by

About this file

SOS/Section B

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SUMM

PRICING SUMMARY/PLANNED PERIODS OF PERFORMANCE Extended Price

BASE YEAR(26 August 2018 - 25 August 2019)$ - 0
OPTION YEAR ONE(26 August 2019 - 25 August 2020)$ - 0
OPTION YEAR TWO(26 August 2020 - 25 August 2021)$ - 0
OPTION YEAR THREE(26 August 2021 - 25 August 2022)$ - 0
OPTION YEAR FOUR(26 August 2022 - 25 August 2023)$ - 0
$ SET ASIDE FOR UNPLANNED SUPPORT (YR 1-2)$ - 0
$ SET ASIDE FOR UNPLANNED SUPPORT (YR 3-5)$ - 0
GRAND TOTAL PRICE BASE YEAR AND ALL OPTIONS$ - 0
DEFINITE EXPENSES$ - 0

IGE JUSTIFICATION

IGE was created with the following resources and suppositions:
1. Ship visits will be performed by 1 technician on site for three 10-hr days.
2. Travel costs used in tab "Travel & Per Diem Estimate" are reasonable estimates of cost for an IGE given that any company in CONUS could be awarded the contract and specific flight costs cannot be calculated.
3. Per diem rates are based on FY18 GSA allowances.
4. Labor rates used to estimate labor costs in tab "IGCE for Project" are fair-market value estimates for these specialties and industry.
5. Material and consumables are not anticipated unless a CFR is submitted requesting a change. Regardless, $13k is added to both the base and option year total cost estimates.
6. We must assume that overhead, profit margin, and G&A may add additional costs to the contract as indicated in tab "IGCE for Project."

SOSS BASE

SCHEDULE OF SUPPLIES & SERVICES
U.S. COAST GUARD IDIQ 175-FT BUOY TENDER (175 WLB)
CLINSpecification ParagraphDefinite/OptionalBASE YEARUnitQuantityPriceExtended Price
00013.1DFull System Groom and ValidationN/AN/A
0001AAHULL 1LOCATION 1JB1
0001ABHULL 2LOCATION 2JB1
0001ACHULL 3LOCATION 3JB1
0001ADHULL 4LOCATION 4JB1
0001AEHULL 5LOCATION 5JB1
0001AFHULL 6LOCATION 6JB1
0001AGHULL 7LOCATION 7JB1
Total$ - 0
00023.6DRemote Troubleshooting Support (Call Center)N/AN/A
0002AATechnical Representative Hourly Rate (Straight Time)HR150
0002ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
00033.5OOn-Site Troubleshooting Support (Unplanned)N/AN/A
0003AATechnical Representative Hourly Rate (Straight Time)HR150
0003ABTechnical Representative Hourly Rate (Overtime)HR10
0003ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
00043.2DCircuit Card ServicesN/AN/A
0004AATechnical Representative Hourly Rate (Straight Time)HR150
0004ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
00053.3OEngineering ServicesN/AN/A
0005AATechnical Representative Hourly Rate (Straight Time)HR100
0005ABTechnical Representative Hourly Rate (Overtime)HR10
0005ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
00063.7OAdditional PartsN/AN/A
0006AAParts and Materials NTENTE1
0006ABComposite Labor RateHR80
Total$ - 0
00073.4 & 4.5DTravel and Pier Diem Expenses to Vessel in Support of CLIN 0001N/AN/A
0007AAHULL 1LOCATION 1EA1
0007ABHULL 2LOCATION 2EA1
0007ACHULL 3LOCATION 3EA1
0007ADHULL 4LOCATION 4EA1
0007AEHULL 5LOCATION 5EA1
0007AFHULL 6LOCATION 6EA1
0007AGHULL 7LOCATION 7EA1
Total$ - 0

TOTAL PRICE BASE YEAR Total $ - 0

SOSS OPT1

SCHEDULE OF SUPPLIES & SERVICES
U.S. COAST GUARD IDIQ 175-FT BUOY TENDER (175 WLB)
CLINSpecification ParagraphDefinite/OptionalOPTION YEAR ONEUnitQuantityPriceExtended Price
10013.1DFull System Groom and ValidationN/AN/A
1001AAHULL 8LOCATION 8JB1
1001ABHULL 9LOCATION 9JB1
1001ACHULL 10LOCATION 10JB1
1001ADHULL 11LOCATION 11JB1
1001AEHULL 12LOCATION 12JB1
1001AFHULL 13LOCATION 13JB1
1001AGHULL 14LOCATION 14JB1
Total$ - 0
10023.6DRemote Troubleshooting Support (Call Center)N/AN/A
1002AATechnical Representative Hourly Rate (Straight Time)HR150
1002ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10033.5OOn-Site Troubleshooting Support (Unplanned)N/AN/A
1003AATechnical Representative Hourly Rate (Straight Time)HR150
1003ABTechnical Representative Hourly Rate (Overtime)HR10
1003ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10043.2DCircuit Card ServicesN/AN/A
1004AATechnical Representative Hourly Rate (Straight Time)HR150
1004ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10053.3OEngineering ServicesN/AN/A
1005AATechnical Representative Hourly Rate (Straight Time)HR100
1005ABTechnical Representative Hourly Rate (Overtime)HR10
1005ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10063.7OAdditional PartsN/AN/A
1006AAParts and Materials NTENTE1
1006ABComposite Labor RateHR80
Total$ - 0
10073.4 & 4.5DTravel and Pier Diem Expenses to Vessel in Support of CLIN 0001N/AN/A
1007AAHULL 8LOCATION 8EA1
1007ABHULL 9LOCATION 9EA1
1007ACHULL 10LOCATION 10EA1
1007ADHULL 11LOCATION 11EA1
1007AEHULL 12LOCATION 12EA1
1007AFHULL 13LOCATION 13EA1
1007AGHULL 14LOCATION 14EA1
Total$ - 0

TOTAL PRICE OPTION YEAR ONE Total $ - 0

SOSS OPT2

SCHEDULE OF SUPPLIES & SERVICES
U.S. COAST GUARD IDIQ 175-FT BUOY TENDER (175 WLB)
CLINSpecification ParagraphDefinite/OptionalOPTION YEAR TWOUnitQuantityPriceExtended Price
10013.1DFull System Groom and ValidationN/AN/A
1001AAHULL 1LOCATION 1JB1
1001ABHULL 2LOCATION 2JB1
1001ACHULL 3LOCATION 3JB1
1001ADHULL 4LOCATION 4JB1
Total$ - 0
10023.6DRemote Troubleshooting Support (Call Center)N/AN/A
1002AATechnical Representative Hourly Rate (Straight Time)HR150
1002ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10033.5OOn-Site Troubleshooting Support (Unplanned)N/AN/A
1003AATechnical Representative Hourly Rate (Straight Time)HR150
1003ABTechnical Representative Hourly Rate (Overtime)HR10
1003ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10043.2DCircuit Card ServicesN/AN/A
1004AATechnical Representative Hourly Rate (Straight Time)HR150
1004ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10053.3OEngineering ServicesN/AN/A
1005AATechnical Representative Hourly Rate (Straight Time)HR100
1005ABTechnical Representative Hourly Rate (Overtime)HR10
1005ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10063.7OAdditional PartsN/AN/A
1006AAParts and Materials NTENTE1
1006ABComposite Labor RateHR80
Total$ - 0
10073.4 & 4.5DTravel and Pier Diem Expenses to Vessel in Support of CLIN 0001N/AN/A
1007AAHULL 1LOCATION 1EA1
1007ABHULL 2LOCATION 2EA1
1007ACHULL 3LOCATION 3EA1
1007ADHULL 4LOCATION 4EA1
Total$ - 0

TOTAL PRICE OPTION YEAR ONE Total $ - 0

SOSS OPT3

SCHEDULE OF SUPPLIES & SERVICES
U.S. COAST GUARD IDIQ 175-FT BUOY TENDER (175 WLB)
CLINSpecification ParagraphDefinite/OptionalOPTION YEAR THREEUnitQuantityPriceExtended Price
10013.1DFull System Groom and ValidationN/AN/A
1001AAHULL 1LOCATION 1JB1
1001ABHULL 2LOCATION 2JB1
1001ACHULL 3LOCATION 3JB1
1001ADHULL 4LOCATION 4JB1
Total$ - 0
10023.6DRemote Troubleshooting Support (Call Center)N/AN/A
1002AATechnical Representative Hourly Rate (Straight Time)HR150
1002ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10033.5OOn-Site Troubleshooting Support (Unplanned)N/AN/A
1003AATechnical Representative Hourly Rate (Straight Time)HR150
1003ABTechnical Representative Hourly Rate (Overtime)HR10
1003ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10043.2DCircuit Card ServicesN/AN/A
1004AATechnical Representative Hourly Rate (Straight Time)HR150
1004ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10053.3OEngineering ServicesN/AN/A
1005AATechnical Representative Hourly Rate (Straight Time)HR100
1005ABTechnical Representative Hourly Rate (Overtime)HR10
1005ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10063.7OAdditional PartsN/AN/A
1006AAParts and Materials NTENTE1
1006ABComposite Labor RateHR80
Total$ - 0
10073.4 & 4.5DTravel and Pier Diem Expenses to Vessel in Support of CLIN 0001N/AN/A
1007AAHULL 1LOCATION 1EA1
1007ABHULL 2LOCATION 2EA1
1007ACHULL 3LOCATION 3EA1
1007ADHULL 4LOCATION 4EA1
Total$ - 0

TOTAL PRICE OPTION YEAR ONE Total $ - 0

SOSS OPT4

SCHEDULE OF SUPPLIES & SERVICES
U.S. COAST GUARD IDIQ 175-FT BUOY TENDER (175 WLB)
CLINSpecification ParagraphDefinite/OptionalOPTION YEAR FOURUnitQuantityPriceExtended Price
10013.1DFull System Groom and ValidationN/AN/A
1001AAHULL 1LOCATION 1JB1
1001ABHULL 2LOCATION 2JB1
1001ACHULL 3LOCATION 3JB1
1001ADHULL 4LOCATION 4JB1
Total$ - 0
10023.6DRemote Troubleshooting Support (Call Center)N/AN/A
1002AATechnical Representative Hourly Rate (Straight Time)HR150
1002ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10033.5OOn-Site Troubleshooting Support (Unplanned)N/AN/A
1003AATechnical Representative Hourly Rate (Straight Time)HR150
1003ABTechnical Representative Hourly Rate (Overtime)HR10
1003ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10043.2DCircuit Card ServicesN/AN/A
1004AATechnical Representative Hourly Rate (Straight Time)HR150
1004ABTechnical Representative Hourly Rate (Overtime)HR10
Total$ - 0
10053.3OEngineering ServicesN/AN/A
1005AATechnical Representative Hourly Rate (Straight Time)HR100
1005ABTechnical Representative Hourly Rate (Overtime)HR10
1005ACTravel and Pier Diem Expenses to Vessel (1 Tech Rep to Travel to and from Cutter)EA10
Total$ - 0
10063.7OAdditional PartsN/AN/A
1006AAParts and Materials NTENTE1
1006ABComposite Labor RateHR80
Total$ - 0
10073.4 & 4.5DTravel and Pier Diem Expenses to Vessel in Support of CLIN 0001N/AN/A
1007AAHULL 1LOCATION 1EA1
1007ABHULL 2LOCATION 2EA1
1007ACHULL 3LOCATION 3EA1
1007ADHULL 4LOCATION 4EA1
Total$ - 0

TOTAL PRICE OPTION YEAR ONE Total $ - 0

Travel & Per Diem Estimate

CutterHull NumberHomeportPer Diem + Max Lodging (Based on FY18 GSA Schedule)Rountrip Flight (Est)Weekly MiniVan Rental (Est)Trip Cost (Not Including Overhead, G&A, and Profit) - Planned Groom/Unplanned TripTrip Cost (Including Overhead, G&A, and Profit) - Planned Groom/Unplanned Trip
ABBIE BURGESSWLM-553ROCKLAND, ME$170$688$797$3,325$5,154
ANTHONY PETITWLM-558KETCHIKAN, AK$339$766$360$2,793$4,329
BARBARA MABRITYWLM-559MOBILE, AL$157$715$404$2,240$3,473
FRANK DREWWLM-557PORTSMOUTH, VA$144$709$355$2,146$3,326
GEORGE COBBWLM-564SAN PEDRO, CA$237$617$270$2,248$3,484
HARRY CLAIBORNEWLM-561GALVESTON, TX$185$648$404$2,257$3,498
HENRY BLAKEWLM-563EVERETT, WA$199$611$300$2,158$3,345
IDA LEWISWLM-551NEWPORT, RI$271$619$460$2,542$3,940
JAMES RANKINWLM-555BALTIMORE, MD$238$595$345$2,304$3,571
JOSHUA APPLEBYWLM-556ST PETERSBURG, FL$208$593$308$2,175$3,371
KATHERINE WALKERWLM-552BAYONNE, NJ$205$679$415$2,359$3,657
MARCUS HANNAWLM-554SOUTH PORTLAND, ME$168$688$391$2,233$3,462
MARIA BRAYWLM-562MAYPORT, FL$144$663$307$2,052$3,180
WILLIAM TATEWLM-560PHILADELPHIA, PA$266$657$504$2,609$4,044

AVG $209 $661 $401 $2,389 $3,702

IGCE for Project

IGE for 175 WLB Thruster System Groom and Assessement (In Support of MPCMS Recap Efforts)
IGE Totals
# of visitsLabor & MatlTravel & Per DiemTOTAL
Base Yr (7 cutters)7
OY1 (5 cutters)7
Per cutter Labor & MatlPer cutter Travel & Per Diem
LaborTravel & Per Diem
Material
MultipliersOverheadOverhead
Overhead25.00%G&AG&A
G&A15.00%ProfitProfit
Profit15.00%
Labor Rates
CategorySTOT
Project Manager
Electronics Technician
Electronics Engineer
Avg Trip Expenses
Per Diem
Flight (roundtrip)
Minivan Rental (week)
Ship Visit
Personnel:One (1 Technician) On-Site, Project Manager at Office
Duration:Assuming 3 days on site, 10-hr days (24 ST hrs, 6 OT hrs) for on-site reps
LaborPer DiemAirfareMisc ExpensesMinivan
Project Manager$0.00$0.00$0.00$0.00
Technician$0.00$0.00$0.00

TOTAL $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Additional Costs Per Visit
Misc Materials, Parts & Consumables
TOTAL$0.00$0.00
Additional Costs / One Time Start-up
Misc Materials, Parts & Consumables$0.00
TOTAL$0.00$0.00

File details come from the government source that posted it.