CGC_PATOKA_&_BARGE_ATTACHMENT_2_PRICING_SCHEDULE.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- USCGC PATOKA & BARGE Federal contract opportunity
- Solicitation number
- 70Z085-19-Q-P4501200
About this file
CGC PATOKA & BARGE ATTACHMENT 2: PRICING SCHEDULE
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CGC_PATOKA_&_BARGE_AMENDMENT_OF_SOLICITATION.pdf | ||
| CGC_PATOKA_&_BARGE__-_ATTACHMENT_6__USCG_Ombudsman_Notice.pdf | ||
| CGC_PATOKA_&_BARGE__SOLICITATION.DOCX | DOCX document | |
| CGC_PATOKA_&_BARGE_-_ATTACHMENT_5_PAST_PERFORMANCE.docx | DOCX document | |
| CGC_PATOKA_&_BARGE_ATTACHMENT_3_GOVERNMENT_PROPERTY_REPORT.doc | DOC document | |
| CGC_PATOKA_&_BARGE_-_ATTACHMENT_4__REQUEST_FOR_CLARIFICATION.docx | DOCX document | |
| CGC_PATOKA_&_BARGE_ATTACHMENT_1__WORK_SPECIFICATION.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment - 2 Schdule of Supplies /Services - Prices | |||||
| CGC PATOKA & BARGE DRYDOCK REPAIRS | |||||
| 70Z085-18-Q-P4501200 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect – Tender | JOB | 1 | ||
| D-002 | U/W Body, Preserve (100%) – Tender | JOB | 1 | ||
| D-003 | Voids (Non-Accessible), Leak Test –Tender | JOB | 1 | ||
| O-004 | Voids (Non-Accessible), Internal Surfaces, Preserve – Tender | JOB | 1 | ||
| D-005 | Tanks (MP Fuel Service), Clean & Inspect – Tender | JOB | 1 | ||
| D-006 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-007 | Propulsion Shaft Seals, Mechanical & Inflatable, Overhaul and Renew | JOB | 1 | ||
| O-008 | Propulsion Shafting, Straighten | JOB | 1 | ||
| D-009 | Propulsion Shaft Bearings (External), Renew | JO B | 1 | ||
| O-010 | Propeller, Minor Repairs and Reconditioning, Perform | JOB | 1 | ||
| D-011 | Propeller, Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-012 | Keel Coolers, Clean, Inspect and Hydro –Tender | JOB | 1 | ||
| D-013 | Rudder Assembly; Remove, Inspect and Reinstall | JOB | 1 | ||
| D-014 | Rudder(s), Preserve (“100%) | JOB | 1 | ||
| D-015 | Spuds, Overhaul – Tender | JOB | 1 | ||
| D-016 | Spud Wells, Preserve – Tender | JOB | 1 | ||
| D-017 | Decks – Exterior, Preserve (“Non-Skid Broadcast Grit” System) – Tender | JOB | 1 | ||
| D-018 | Hull Plating Freeboard, Preserve “100%” – Tender | JOB | 1 | ||
| D-019 | Cahtodic Protection / Magnesium Anodes, Renew – Tender | JOB | 1 | ||
| D-020 | Dry-dock – Tender | JOB | 1 | ||
| D-021 | Temporary Services, Provide –Tender | JOB | 1 | ||
| D-022 | Sea Trail Performance, Support, Provide | JOB | 1 | ||
| D-023 | Hull Plating (U/W Body), Inspect –Barge | JOB | 1 | ||
| D-024 | U/W Body, Preserve (100%) – Barge | JOB | 1 | ||
| D-025 | Tanks (MP Fuel Stowage & Overflow), Clean & Inspect – Barge | JOB | 1 | ||
| D-026 | Voids (Non-Accessible), Leak Test – Barge | JOB | 1 | ||
| O-027 | Voids (Non-Accessible), Internal Surfaces, Preserve – Barge | JOB | 1 | ||
| D-028 | Keel Coolers, Clean, Inspect and Hydro – Barge | JOB | 1 | ||
| D-029 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | JOB | 1 | ||
| D-030 | Hull Fittings (Mooring & Towing), Inspect & Test – Barge | JOB | 1 | ||
| D-031 | Spuds, Overhaul – Barge | JOB | 1 | ||
| D-032 | Spud Wells, Preserve – Barge | JOB | 1 | ||
| D-033 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | ||
| D-034 | Cathodic Protection / Magnesium Anodes, Renew – Barge | JOB | 1 | ||
| D-035 | Dry-dock – Barge | JOB | 1 | ||
| D-036 | Boat Davit Winch, Shrink Wrap | JOB | 1 | ||
| D-037 | Buoy & Cargo Handling Crane, Shrink Wrap | JOB | 1 | ||
| D-038 | Hull Plating (Side Scan), Ultrasonic Testing- Tender | JOB | 1 | ||
| D-039 | Vent Ducts (Laundry Exhaust), Commercial Cleaning | JOB | 1 | ||
| D-040 | Sewage Holding Tank(s), Clean & Inspect - Tender | JOB | 1 | ||
| D-041 | Hull Plating (Side Scan), Ultrasonic Testing – Barge | JOB | 1 | ||
| D-042 | Decks – Exterior, Preserve (“Non-Skid Broadcast Grit” System) – Barge | JOB | 1 | ||
| D-043 | Bilges, Preserve | JOB | 1 | ||
| D-044 | Locker Doors, Renew | JOB | 1 | ||
| D-045 | Lazarette, Preserve 100% | JOB | 1 | ||
| D-046 | Fuel, Piping, Renew | JOB | 1 | ||
| D-047 | Chill Water System Piping, Renew | JOB | 1 | ||
| D-048 | Anti-Ventilation Underwater Hull Strakes, Installation | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hours | 45 | ||
| D-00B | GFP Report | EA | NSP | ||
| O-00Z | Laydays | DAY | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
Sheet2
Sheet3
File details come from the government source that posted it.