SCHEDULE OF SUPPLIES & SERVICES - PRICES

View the file

Other files

File Type Posted
ATTACHMENT_2_-_SCHEDULE_OF_ITEM_(ALEX_HALEY)(REV._2).docx DOCX document
Page_2_-_Amend._0006.docx DOCX document
SF30-A0006.pdf PDF
Work_Item_O-I23_-_Tenting.pdf PDF
Work_Item_O-09_Flight_Deck.pdf PDF
Page_2_-_Amend._0005.docx DOCX document
ATTACHMENT_2_-_SCHEDULED_OF_ITEMS_(ALEX_HALEY)(REVISED).docx DOCX document
SF30-A0005.pdf PDF
Page_2_-_Amend._0004.docx DOCX document
SF30-A0004.pdf PDF
Page_2_-_Amend._0003.docx DOCX document
SF30-A0003.pdf PDF
Page_2_-_Amend._0002.docx DOCX document
SF30-A0002.pdf PDF
Page_2_-_Amend._0001.docx DOCX document
SF30-A0001.pdf PDF
ATTACHMENT_3_-_Request_for_Clarification_Form.doc DOC document
ATTACH._1_-Continuation_of_Synopsis_Solicitation_(Rev.).doc DOC document
Attachment_4_-_GOVERNMENT_PROPERTY_REPORT.doc DOC document
DOUGLAS_MUNRO_(WHEC_378W)_DS_RTO_19R0_(101118).pdf PDF
ALEX_HALEY_(WMEC_282)_DS_RTO_19R0.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 70Z08519RP4503600 Request for Proposal Dockside Repairs of CGC DOUGLAS MUNRO (WHEC 724) & CGC ALEX

HALEY (WMEC 39)

ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES - PRICES

B.1 – CGC DOUGLAS MUNRO (WHEC 724)

CLIN 0001 – DEFINITE ITEMS - These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

Work Item No.
Description
Quantity
Unit
Unit Price
Amount
D-01
Tanks (Aviation Fuel Service), Clean & Inspect
1
JOB
$
$
D-02
Tanks (Aviation Fuel Stowage & Overflow), Clean & Inspect
1
JOB
$
$
D-03
Tanks (MP Fuel Stowage & Overflow), Clean & Inspect
1
JOB
$
$
D-04
Main Diesel Engine (MDE) Exhaust Piping, Commercial Cleaning
1
JOB
$
$
D-05
Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial clean
1
JOB
$
$
D-06
Boiler Exhaust Stack Uptakes, Commercial Clean
1
JOB
$
$
D-07
Circuit Breakers (60 Hz) Inspect & Test
1
JOB
$
$
D-08
Breakers (Degaussing), Inspect & Clean
1
JOB
$
$
D-09
Tachometers, Calibrate
1
JOB
$
$
D-10
Evaporator, (General) Overhaul
1
JOB
$
$
D-11
Potable Water Pneumatic Tank(s), Clean & Inspect
1
JOB
$
$
D-12
Hot Water Accumulator Tanks, Clean & Inspect
1
JOB
$
$
D-13
Steering Gear (General), Overhaul
1
JOB
$
$
D-14
Oily Water Separator, Overhaul
1
JOB
$
$
D-15
Temporary Services Provide, Cutter
1
JOB
$
$
D-16
Fuel Oil Manifold, Overhaul
1
JOB
$
$
D-17
Chilled Water System, Flush
1
JOB
$
$
D-18
Chilled Water System Insulation, Renew
1
JOB
$
$
D-19
Fan Plenum Preservation
1
JOB
$
$
D-20
Fan Room 01-97-1-Q Preservation
1
JOB
$
$
D-21
Fan Room 01-97-2-Q Preservation
1
JOB
$
$
D-22
Deck Preservation
1
JOB
$
$
D-23
Deck Covering (Polymeric), Renew
1
JOB
$
$
D-24
Electric Matting, Renew
1
JOB
$
$
D-25
Gas Turbine Exhaust System, Internal Inspection
1
JOB
$
$
D-26
Gas Turbine Exhaust Piping, repairs
1
JOB
$
$
D-27
Single Point Davit (GEN), Level 2 Inspect & Test
1
JOB
$
$
TOTAL AMOUNT OF DEFINITE ITEMS
$

CLIN 0002 – OPTIONAL ITEMS - Optional items may be awarded if inspection reports reveal the necessity for activation, or if funds are made available, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 20 May 2019, the Contractor shall have the right to refuse to accept the award of such Optional Items.

Work Item No.
Description
Quantity
Unit
Unit Price
Amount
O-28
Anchor Windlass, Bearing Flush
1
JOB
$
$
O-29
Anchor Windlass, Overhaul
1
JOB
$
$
TOTAL AMOUNT OF OPTIONAL ITEMS
$
TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS OF CGC DOUGLAS MUNRO
$

CLIN – 0003 – COMPOSITE LABOR HOUR RATE

The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (17) entitled “COMPOSITE LABOR HOUR RATE.”

Labor Hour Rate
Estimated Hours
Extended Amount

Composite Labor Hour Rate- Provide the all inclusive mark-up/loading rate for materials and subcontractors: ___%. This rate will be incorporated into the contract and used on change requests.

$________/HR

1,731 hours

*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.

TOTAL EVALUATED AMOUNT FOR CGC DOUGLAS MUNRO $________________

B.2 – CGC ALEX HALEY (WMEC 39)

CLIN 0004 – DEFINITE ITEMS - These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

Work Item No.
Description
Quantity
Unit
Unit Price
Amount
D-01
Tanks (MP Fuel Stowage & Overflow), Clean & Inspect
1
JOB
$
$
D-02
Tanks (MP Fuel Service) Clean & Inspect
1
JOB
$
$
D-03
Grey Water Holding Tank(s), Clean & Inspect
1
JOB
$
$
D-04
Sewage Holding Tank(s), Clean & Inspect
1
JOB
$
$
D-05
Tanks (Dirty Oil) Celan & Inspect
1
JOB
$
$
D-06
Tanks (Aviation Fuel Storage & Overflow) Clean & Inspect
1
JOB
$
$
D-07
Deck, Helicopter Hanger, Preserve
1
JOB
$
$
D-08
Decks Exterior Preserve
1
JOB
$
$
D-09
Decks, Helicopter Operting areas, Preserve
1
JOB
$
$
D-10
Circuit Breakers (60Hz), Inspect & Test
1
JOB
$
$
D-11
Circuit Breakers (40 Hz), Inspect & Test
1
JOB
$
$
D-12
MDE Exhaust Stacks, Commercial Clean
1
JOB
$
$
D-13
Fire Pump, Overhaul
1
JOB
$
$
D-14
Warping Capstan (GEN) Level 2, Inspect & Test
1
JOB
$
$
D-15
Tank Vent Penetration, Renew
1
JOB
$
$
D-16
Life Raft Modification
1
JOB
$
$
D-17
Steam & Condensate Return Shore Tie, Renew
1
JOB
$
$
D-18
Vacuum Sewage System, Hydroject, Cleaning
1
JOB
$
$
D-19
Anchor Windlass, Service & Repair
1
JOB
$
$
D-20
Steering System, Groom
1
JOB
$
$
D-21
Temporary Services, Provide - Cutter
1
JOB
$
$
TOTAL AMOUNT OF DEFINITE ITEMS
$

CLIN 0005 – OPTIONAL ITEM - Optional items may be awarded if inspection reports reveal the necessity for activation, or if funds are made available, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 16 July 2019, the Contractor shall have the right to refuse to accept the award of such Optional Items.

Work Item No.
Description
Quantity
Unit
Unit Price
Amount
O-22
Hangar Deck Plate, Renew
1
JOB
$
$
TOTAL AMOUNT OF OPTIONAL ITEMS
$
TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS – CGC ALEX HALEY
$

CLIN – 0006 – COMPOSITE LABOR HOUR RATE

The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (17) entitled “COMPOSITE LABOR HOUR RATE.”

Labor Hour Rate
Estimated Hours
Extended Amount

Composite Labor Hour Rate- Provide the all inclusive mark-up/loading rate for materials and subcontractors: ___%. This rate will be incorporated into the contract and used on change requests.

$________/HR

1,801 hours

*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required

TOTAL AMOUNT OF CGC ALEX HALEY $___________________

TOTAL AMOUNT OF CGC DOUGLAS MUNRO $___________________

TOTAL EVALUATED AMOUNT OF B.1 & B.2 $___________________