Page_2_-_Amend.__0005.doc

DOC document 54 KB Posted

Attached to
Dockside Repairs of CGC Douglas Munro (WHEC 724)
Solicitation number
70Z08518RP4527300
Issued by

About this file

Page 2 of SF 30 - Amend. 0005

View the file

Other files

File Type Posted
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R-3.pdf PDF
SF30-A0005.pdf PDF
Page_2_-_Amend.__0004.doc DOC document
SF30-A0004.pdf PDF
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R-2PDF.pdf PDF
Page_2_-_Amend.__0003.doc DOC document
SF30-A0003.pdf PDF
Page_2_-_Amend.__0002.docx DOCX document
SF30-A0002.pdf PDF
Attachment_3_-_Schedule_of_Items_-_Prices_(REVISED).doc DOC document
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R-1.pdf PDF
Page_2_-_Amendment_0002.doc DOC document
ATTACH._2-Continuation_of_Synopsis_Solicitation_(Rev.2).doc DOC document
Attachment_3_-_Schedule_of_Items_-_Prices.doc DOC document
SF30-A001.pdf PDF
ATTACHMENT_4_-_Request_for_Clarification_Form.doc DOC document
ATTACH._2-Continuation_of_Synopsis_Solicitation.doc DOC document
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R0_(2).pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

SOLICITATION NO. 70Z08518RP4527300

DOCKSIDE REPAIRS OF CGC DOUGLAS MUNRO (WHEC 724)

AMENDMENT NO. 0005

The purpose of this amendment is as follows:

a.

The answer to the Request for Clarification below is as follows:

QUESTION NO. 28: Work Item D-14, Sewage System TLI Replacement, Amendment 0004; The amendment states that No materials or items listed in the materials section for this work shall be purchased or installed.

Going through the revision, material items 8-11 (cables/resistors) are still required per drawing and specification. Specifically paragraphs 3.2.3.2, 3.2.4.2, 3.2.5.2 mention the cables.

Do you know if there will be a revised material list or should we bid off the stated required cable lengths per drawing?

ANSWER: Based on the above question, the specification and the associated drawing for the work item resulted in the revision of the specification and the associated drawing. Offerors are advised to utilize the attached revised specification during submission of proposal for this requirement. Offerors are to utilize revised specification entitled “USCGC DOUGLAS MUNRO (WHEC 724) Specifications for Dockside Repairs FY 18, Rev. 3 dated 01 February 2018”. Due to security, offeror is to request, via e-mail, a copy of the revised drawing to Valerie.s.riverachase@uscg.mil. Revised drawing will not be posted in www.fbo.gov.

b.

The due date for submission of proposals is not extended by this amendment.

c.

All other terms and conditions cited on the solicitation remain unchanged.