Page_2_-_Amend.__0004.doc

DOC document 55 KB Posted

Attached to
Dockside Repairs of CGC Douglas Munro (WHEC 724)
Solicitation number
70Z08518RP4527300
Issued by

About this file

Pages 2-3 - Amendment 0004

View the file

Other files

File Type Posted
Page_2_-_Amend.__0005.doc DOC document
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R-3.pdf PDF
SF30-A0005.pdf PDF
SF30-A0004.pdf PDF
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R-2PDF.pdf PDF
Page_2_-_Amend.__0003.doc DOC document
SF30-A0003.pdf PDF
Page_2_-_Amend.__0002.docx DOCX document
SF30-A0002.pdf PDF
Attachment_3_-_Schedule_of_Items_-_Prices_(REVISED).doc DOC document
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R-1.pdf PDF
Page_2_-_Amendment_0002.doc DOC document
ATTACH._2-Continuation_of_Synopsis_Solicitation_(Rev.2).doc DOC document
Attachment_3_-_Schedule_of_Items_-_Prices.doc DOC document
SF30-A001.pdf PDF
ATTACHMENT_4_-_Request_for_Clarification_Form.doc DOC document
ATTACH._2-Continuation_of_Synopsis_Solicitation.doc DOC document
DOUGLAS_MUNRO_(WHEC_378W)_DS_FQ3_APW_18R0_(2).pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

SOLICITATION NO. 70Z08518RP4527300

DOCKSIDE REPAIRS OF CGC DOUGLAS MUNRO (WHEC 724)

AMENDMENT NO. 0004

The purpose of this amendment is as follows:

a.

The answer to the Request for Clarification below is as follows:

QUESTION NO. 27: Work Item D-14, Sewage System TLI Replacement, References; Contractor has received and reviewed the following references, DWG FRAM W 378-WHEC-6202-001 and Tech Pub 5527.

The above references require the following question:

Q: Work item 14 paragraph 3.3.6 calls for 120 volt transformer to be installed in new controllers to power solenoids. Coast Guard drawing Fram W 6202-001 does not show any transformers or solenoids. The drawing does show 120 volt power going into each controller from external sources, not a transformer. Please provide wiring schematic, detail on transformer size and input voltage and what solenoids are being powered.

ANSWER: The work in this specification item has been modified from the original design. No work will be accomplished on the forward sewage vacuum tank or on the aft sewage vacuum tank. Sheets 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15 & 28 of CG Dwg 378 FRAM W 6202-1 are not applicable. No materials or items listed in the materials section for this work shall be purchased or installed.

3.2.1 Forward vacuum sewage tank. Work on the forward vacuum sewage tank has been deleted. No work shall be performed on this tank.

3.2.2 Aft vacuum sewage tank. Work on the aft vacuum sewage tank has been deleted. No work shall be performed on this tank. 3.3.1 Vacuum sewage tank (forward). Work on the forward vacuum sewage tank has been deleted. No work shall be performed on this tank.

3.3.2 Vacuum sewage tank (aft). Work on the forward vacuum sewage tank has been deleted. No work shall be performed on this tank.

The following paragraph and requirement has been deleted from the spec :3.3.6 Provide and install new transformers in each of the new controllers to provide 110 vAC power to the solenoid coils.

b.

Due to the change in the specification for Work Item D-14, offerors are advised to utilize the attached revised specification during submission of proposal for this requirement during submission.

c.

The due date for submission of proposals is not extended by this amendment.

d.

All other terms and conditions cited on the solicitation remain unchanged.