1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 09FEB18 21-18-858***020
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER, USCG
Surface Forces Logistics Center – Contract & Procurement Division 1301 Clay Street, Suite 807N Oakland, CA 94612
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
70Z08518RP4502000
X 9B. DATE (SEE ITEM 11)
23 JAN 2018
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: Solicitation No. 70Z08518RP4502000, USCGC STRATTON (WMSL 752) Dockside Repairs FY18 FQ3
See Continuation Pages
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
Solicitation No. 70Z08518RP4502000 CGC STRATTON (WMSL 752) Dockside Repairs FY18 FQ3 Amendment No. 0001
The purpose of this amendment is as follows:
1. To address the following clarification questions
D-14, Table 3,4,5 & 6 (Flex Hose Assemblies, Renew) Q: The pressure rating and fitting types have not been provided for the hoses. Can the USCG please provide?
A: Table 3 (see attached) is for bidding purposes only & PE will provide more up to date estimated information for Size, Length, and design pressure to assist. PE recommends a ship check for estimation in Accordance with 3.1.4 Note “A verification ship check by the contractor prior to bidding is recommended to determine accuracy of Tables. Information listed was provided by contractor from previous availability” and assist with 3.1.7.
D-02, Para 3.3.2 (General Welding, Provide) Q: Does paragraph 3.3.2 have the same exemption of “Interferences” as paragraph 3.3.1?
A: Interference exemption in 3.3.1 will be carried over to 3.3.2, providing no additional cost to the Government, and to be handled in accordance with Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000)
D-07, Para 3.8.1 (Water Mist Fire Extinguishing System, Inspect and Test) Q: As allowed in general specification 8635 for Grey and Sewage Water, can the contractor discharge the Water Mist Tank Water (Soapy Water) to pier riser?
A: There is no riser or shore connection for the Water Mist Tank. Generally in the past contractors Have pumped the contents to the weather deck or/and the pier utilizing a pneumatic pump..
D-14, Table 3 (Flex Hose Assemblies, Renew) Q: Table 3 has several hoses without Length or Size, contractor recommends for bidding purposes that these omits to be subject to CFR and or CG to provide Length and Size for Table 3 omits.
A: Table 3 (see attached) is for bidding purposes only & PE will provide more up to date estimated information for Size, Length, and design pressure to assist. PE recommends a ship check for estimation in Accordance with 3.1.4 Note “A verification ship check by the contractor prior to bidding is recommended to determine accuracy of Tables. Information listed was provided by contractor from previous availability” and assist with 3.1.7.
D-20, Table 3.6 (H60R Helicopter Securing Fittings, Install) Q: Are the existing fittings welded to any vertical, longitudinal and or transitional structural stiffening?
A: In accordance with Drawing 750-WMSL-588-504 Rev. B Sheet 2 & 6 breakdown of 15C QTY 04Starboard interior Hanger is set on longitudinal stiffeners. QTY 04 Port interior Hanger 15F is set off longitudinal stiffeners with a Flat bar ASTM A131 Grade AH36 ½” x 6”x ~32-36” for stiffening. Reference picture attached below
The solicitation closing date is NOT extended due to this amendment. Receipt of proposals are still due no later than 23FEB18 @ 1400 Pacific time.
| SF 30 (0001) |
| Page 2 - 0001 |