This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued on August 19, 2026, for Request/Purchase Requisition Number 34269PR260000041. The amendment modifies solicitation 70Z08426QDL94 0024 and is accompanied by a Questions and Answers document addressing vendor inquiries.
The amendment updates the negotiation description to clarify three key modifications: answer vendor questions, add specific dates to training activities, and extend the solicitation date. The accompanying Q&A document provides critical clarifications on scope and requirements. Performance is strictly limited to pier-side events on September 8th and 9th, 0800–1600 hours; no underway operations, night operations, or helicopter/boat insertions will occur. Training will consist of interior/deck activities including close-quarters battle with marking cartridges, CBRNE PPE training, and K9 operations while the vessel is moored. The 10-nautical-mile transit capability previously listed is no longer a mandatory technical requirement. Vendors should price CLIN 0001 "Vessel Rental" as a lump sum covering both training days. The vessel must be a passenger ferry with minimum certified capacity of 500 passengers (applicable to harbor-route certificate), though a single vessel meeting this capacity for both days is acceptable and preferred. A secured pier is required with public access restricted to the vessel and immediate pier area during training hours; exclusive facility use is not required. The contractor must provide restoration of the vessel to preferred operating condition at conclusion of training, while the Government will remove training gear and provide range/safety plans. Insurance requirements are deferred to the Contracting Officer per FAR 52.228-5, and demonstrated experience and qualifications of the vessel owner/crew will be accepted toward personnel-experience and past-performance evaluation factors. The unit will provide its own role players; no paying passengers are required onboard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pricing Sheet.xlsx | XLSX spreadsheet | |
| 70Z08426QDL940024-A0001.pdf | ||
| SOW SOW TRNG VESSELS FY26 Q4.pdf | ||
| 70Z08426QDL940024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT CONTROL NUMBER :
SUMMARY OF CHANGES :
70Z08426QDL940024A00002
Negotiation Description is changed from The purpose of this modification is to answer questions from vendor. to The purpose of this modification is to:
1. Answer questions from vendor.
2. Add Dates to training
3. Extend the Solicitation Date.
1. SOW §1 describes "day and night underway training exercises," and §3.4 requires night-operations capability, but §4.2 lists Underway Dates as "N/A" and §4.3 schedules pier-side support only, 0800–1600. For this order, is any underway or night operation required, or is performance limited to the two pier-side events listed in §4.3?
No. Performance is strictly limited to the pier-side events scheduled between 0800–1600 on September 8th and 9th.
2. SOW §3.1 requires at least one vessel "capable of transiting at least 10 nautical
-side only, is this transit capability still a mandatory technical requirement for award, or does it apply only if underway dates are later added?
No. Because this requirement is strictly pier-capability is no longer a mandatory technical requirement.
3. SOW §2 lists helicopter insertion/extraction, boat insertion/extraction, high-speed –9 pier-side events, or will training be limited to interior/deck activities (CQB with marking cartridges, CBRNE PPE, K9, marshalling) while moored?
No helicopter/boat insertions or high-speed maneuvering will occur. Training will be strictly limited to interior/deck activities (e.g., CQB with marking cartridges, CBRNE, K9) while moored.
4. For the marking-cartridge and precision-the range/safety plan and designate the "safe zones," and what standard governs vessel restoration/cleaning responsibility at the conclusion of training?
The Government will provide the range/safety plan and designate the safe zones. Regarding restoration, the Unit will remove all training gear and restoration of the vessel to its preferred operating condition will be the responsibility of the Contractor.
5. Would a smaller pax vessel be suitable if it met the size requirements for the open area required for helicopter training?
No. A minimum capacity of 500 passengers is still required per §3.1.
Furthermore, helicopter training is no longer part of this evolution.
Schedule and pricing
6.
revised to a daily unit?
lump sum covering both training days.
7. The SF1449 period of performance runs 9/8–9/10, but §4.3 lists events on 9/8 and and if so, should that availability be priced?
No. The vessel is only required on September 8th and 9th.
8. §4.3 calls for a "500 passenger capacity ferry vessel" while §3.1 states a 500–1,200 whether the capacity requirement applies to the vessel's harbor-given pier-side performance.
Yes.
passengers. This capacity requirement applies to the vessel's harbor-route
-side event.
9.
both days acceptable?
Yes. A single vessel meeting the minimum 500-passenger capacity for both days is fully acceptable and preferred.
Facility and security
10. For the secured pier requirement (§3.3): is restricting public access to the vessel and its immediate pier area during the 0800– the approximate number/type of government vehicles requiring secured parking, and whether any government equipment will remain aboard or on the pier overnight between training days.
Restricting public access from 0800-entire facility is not required. 02 Trucks and 01 Trailer. No government equipment will be left onboard overnight.
Administrative
10. Block 10 of the SF1449 indicates no set-lists 336611, Ship Building and Repairing, which appears inconsistent with a vessel charter service).
11. FAR 52.228-
minimum coverages and limits will the government require of the contractor?
to establish the minimum insurance coverages and limits appropriate for a pier-side charter under FAR 52.228-5.
12.
the prime contractor's vessel provider) be accepted toward the personnel-experience and past-performance evaluation factors?
Yes.
crew (as the prime contractor's vessel provider) will be accepted toward evaluation factors.
13. Does it have to be a ferry?
Yes, the training objectives require the vessel to be a passenger ferry type of vessel per the SOW.
14.
No
15.
Yes
16. Will the ferry need role players or have PAX onboard?
The Unit will provide its own role players. No PAX are required onboard.