175-WLM_541_1_1_-_H.pdf
PDF 1 MB Posted
- Attached to
- USCGC Harry Claiborne fuel tank cleaning service
- Solicitation number
- 70Z08425QDL930004
About this file
This is a detailed fuel oil system diagram set showing technical specifications and layout plans for a ship's fuel system. The drawings include a material schedule, system design requirements, major equipment table, instrument list, relief valve list, and flow data specifications on the first page. Subsequent pages show detailed mechanical drawings of the service system, transfer system, and overall fuel oil system layout including pipe routing, valve locations, tank positions, and equipment placement across multiple decks (HB 920, HB 930, HB 940).
The diagrams contain specific technical details like pipe sizes, flow rates, pressure specifications, and equipment designations that would be relevant for maintenance, repairs or modifications to the vessel's fuel system. Key components shown include fuel oil pumps, storage tanks, service tanks, transfer lines, relief valves, and associated instrumentation. The drawings appear to be part of a larger technical documentation package referenced as drawing number HB13140175-WLM-541-001 and include notes indicating these specifications apply to hull 553 and other vessels.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
175-WLM_541_1_1_-_H
| 175-WLM_541_1_2_-_H |
| 175-WLM_541_1_3_-_H |
| 175-WLM_541_1_4_-_H |
| 175-WLM_541_1_5_-_H |
File details come from the government source that posted it. Updated .