M2273C01_BMW_Signed.pdf

PDF 484 KB Posted

Attached to
CONSTRUCT OVERFLOW PARKING LOT AND STORAGE AREA AT AIR STATION CORPUS CHRISTI, TX
Solicitation number
70Z08219BPACP0300
Issued by

About this file

DRAWINGS M2273C01 BMW

View the file

Other files

File Type Posted
ABSTRACT_OF_OFFERS_-_POSTED_12-20-2018.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
M2273G02.pdf PDF
M2273C02.pdf PDF
100PercentSpecifications.pdf PDF
M2273G01.pdf PDF
IFB_Solicitation_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M I

IL A

NG

G

NE

RI

NI EE UNIT

T

S U

C

VI

C O

SA

R D

M I

A

UG

SITE PLAN

GENERAL NOTES

SCALE:

PAVEMENT SECTION AT EDGES

N.T.S. SCALE:

ASPHALT PAVEMENT DETAIL

NEW

N.T.S.

SCALE:

STRIPING DETAIL

N.T.S.

AutoCAD SHX Text

1-1/2" SURFACE COURSE

AutoCAD SHX Text

1" BINDER COURSE

AutoCAD SHX Text

6" CRUSHED LIMESTONE BASE

AutoCAD SHX Text

COMPACTED SUBGRADE STABILZED

AutoCAD SHX Text

TACK COAT

AutoCAD SHX Text

TO 98%%% STD. PROCTOR

AutoCAD SHX Text

MATERIAL TYPE A GRADE 1

AutoCAD SHX Text

COMPACTED TO 95%%% MODIFIED PROCTOR

AutoCAD SHX Text

1-1/2"" SURFACE COURSE

AutoCAD SHX Text

CRUSHED LIMESTONE

AutoCAD SHX Text

6" BASE COURSE,

AutoCAD SHX Text

COMPACTED SUBGRADE (TYP.)

AutoCAD SHX Text

TACK COAT

AutoCAD SHX Text

TURN 3" DEEP, TYP.

AutoCAD SHX Text

AROUND ALL EDGES

AutoCAD SHX Text

FINISH GRADE

AutoCAD SHX Text

1" BINDER COURSE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

TECH. DIRECTOR

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

SHEET OF

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

PROJECT ENG.

AutoCAD SHX Text

APPROVING OFFICER

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

DISCIPLINE/SHT NO

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

BRANCH CHIEF

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

EDITED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

A/E PROJECT NO:

AutoCAD SHX Text

CAD FILE NAME:

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PLOT SCALE:

AutoCAD SHX Text

MARK

AutoCAD SHX Text

ISSUE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

DATE

AutoCAD SHX Text

U. S. COAST GUARD

AutoCAD SHX Text

CIVIL ENGINEERING UNIT

AutoCAD SHX Text

MIAMI

AutoCAD SHX Text

USCG. CEU MIAMI

AutoCAD SHX Text

15608 SW 117TH AVE

AutoCAD SHX Text

MIAMI, FLORIDA 33177

AutoCAD SHX Text

M2273C01.DWG

AutoCAD SHX Text

ES

AutoCAD SHX Text

ES

AutoCAD SHX Text

ES

AutoCAD SHX Text

BW

AutoCAD SHX Text

OVERFLOW PARKING LOT

AutoCAD SHX Text

CG AIR STATION CORPUS CHRISTI

AutoCAD SHX Text

CORPUS CHRISTI

AutoCAD SHX Text

TX

AutoCAD SHX Text

CIVIL

AutoCAD SHX Text

SITE PLAN/DETAILS

AutoCAD SHX Text 9705879

AutoCAD SHX Text M2273-D

AutoCAD SHX Text C-01

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PINSON DR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 1" = 30'-0"

AutoCAD SHX Text

1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND DIMENSIONS PRIOR TO START OF WORK. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM THE WORK IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL REGULATIONS. 3. CONTRACTOR SHALL LOCATE ALL BURIED CONTRACTOR SHALL LOCATE ALL BURIED UTILITIES BEFORE ANY EXCAVATION COMMENCES. 4. CONTRACTOR SHALL CONTACT AND COMPLY WITH CONTRACTOR SHALL CONTACT AND COMPLY WITH TEXAS ONE CALL PROGRAM TELEPHONE CONTACT (1-800-344-8377) TO VERIFY THAT THE WORK AND IT'S OPERATIONS SHALL NOT DISTURB ANY BURIED UTILITIES. 5. CONTRACTOR SHALL RELOCATE ANY UTILITIES CONTRACTOR SHALL RELOCATE ANY UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 6. CONTRACTOR SHALL REMOVE ALL RUBBISH AND CONTRACTOR SHALL REMOVE ALL RUBBISH AND DEBRIS FROM THE PROJECT SITE DAILY; DO NOT ALLOW ACCUMULATIONS ON SITE. 7. CONTRACTOR SHALL MATCH EXISTING ELEVATIONS. CONTRACTOR SHALL MATCH EXISTING ELEVATIONS. TAKE SPOT ELEVATIONS OF EXISTING GRADES PRIOR TO DEMOLITION AND SUBMIT TO CONTRACTING OFFICER. WHEN NEW PAVING IS COMPLETE, CONTRACTOR SHALL PROVIDE NEW ELEVATION READINGS AND SUBMIT THEM TO THE CONTRACTING OFFICER. ENSURE NEW SURFACES DRAIN WITHOUT PONDING. 8. PAVEMENT GRADE SHALL BE KEPT TO A MINIMUM PAVEMENT GRADE SHALL BE KEPT TO A MINIMUM BUT ADEQUATE ENOUGH TO ENSURE THAT STORM WATER WILL SHED FLOW IN A FAST AND EFFICIENT MANNER. MAXIMUM CROSS SLOPE SHALL BE LIMITED TO 2 PERCENT. 9. CONTRACTOR SHALL PREPARE A WORK PHASING CONTRACTOR SHALL PREPARE A WORK PHASING PLAN, FOR APPROVAL BY THE CONTRACTING OFFICER, COVERING DEMOLITION AND NEW CONSTRUCTION, AS INDICATED AND SPECIFIED. 10. CONTRACTOR SHALL COORDINATE WITH THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER REPRESENTATIVE THE LOCATION OF MATERIAL STORAGE, STOCKPILES, AND EQUIPMENT STORAGE. 11. PAVEMENT MARKINGS SHALL BE IN ACCORDANCE PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH TEXAS DOT STANDARDS. 12. LINES SHALL BE 4-INCH WIDE, COLOR WHITE.LINES SHALL BE 4-INCH WIDE, COLOR WHITE.

AutoCAD SHX Text

NEW ASPHALT PARIING AREA (0.94 ACRES)

AutoCAD SHX Text

NEW 8'-0" CHAINLINK FENCE WITH 1'-0" BARBED WIRE. SEE SHEET C-02

AutoCAD SHX Text

NEW 8'-0" CHAINLINK FENCE WITH 1'-0" BARBED WIRE. SEE SHEET C-02

AutoCAD SHX Text

PEDESTRIAN GATE SEE ENLARGED SITE PLAN ON SHEET C-02

AutoCAD SHX Text

VEHICLE ACCESS GATE SEE ENLARGED SITE PLAN ON SHEET C-02

AutoCAD SHX Text

4" WIDE WHITE PAINTED STRIPES 3'-0" O.C. @ 45°

AutoCAD SHX Text

4" WIDE WHITE PAINTED STRIPES (TYP)

Sheets and Views
CEUM-D
2018-09-13T10:10:53-0400
SAN.ENRIQUE.1240452053
2018-09-13T10:17:11-0400
WOWTSCHUK.BOHDON.MICHEAL.1368812257
2018-10-05T09:44:06-0400
LESINSKI.MICHAEL.J.1072270424
2018-10-05T09:44:41-0400
LESINSKI.MICHAEL.J.1072270424

File details come from the government source that posted it.