DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

AVIATION TRAINING CENTER

MOBILE, ALABAMA 36608-8322

SPECIFICATIONS

FOR

SAM PN: 684280

REPAIR MECHANICAL & HVAC SYSTEMS COMPOSITE

BLDG (S18)

AT

AVIATION TRAINING CENTER

MOBILE, AL

JANUARY 31, 2018

Repai r _Mechani cal & HVAC Syst ems_Composi t e Bl dg ( S18) 684280

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 16. 00 20 SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES

01 33 00 SUBMI TTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 56 00 FLUI D APPLI ED COOL ROOF RESTORATI ON COATI NG SYSTEM

07 60 00 FLASHI NG AND SHEET METAL

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC

23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC

23 74 33. 00 40 PACKAGED, OUTDOOR, HEATI NG AND COOLI NG MAKEUP

AIR-CONDITIONERS

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

26 05 19. 00 10 I NSULATED WI RE AND CABLE

26 05 71. 00 40 LOW VOLTAGE OVERCURRENT PROTECTI VE DEVI CES

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1

Repair_Mechanical & HVAC Systems_Composite Bldg (S18) 684280

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

GENERAL ARCHITECTURAL SCOPE OF WORK:

1. Roofing contractor shall be onsite before and during installation of Rooftop (RT) Make‐up Air Unit (MAU). The roofer shall modify existing roof curb opening, install flashing and repair any damage due to installation.

Upon completion, roofer shall install roof coating material.

GENERAL MECHANICAL SCOPE OF WORK:

1. The contractor shall remove the existing RoofTop (RT) indirect fired Makeup Air Unit (MAU), ventilation blower, ductwork, wiring and controls.

Inspect and modify existing roof curbs to ensure it will accommodate the new air conditioned RT MAU. Provide and Install the new larger MAU.

2. The contractor shall Install new metal ductwork from the new MAU and connect to the existing supply duct. Modify existing Air Handling Unit (AHU)1 and AHU2 ductwork for Outside Air (OA) modulating damper.

3. The contractor shall install new electrical circuit sized to support the new air-conditioned MAU and new control wiring and sensors. Ensure the new air conditioning unit is bonded to a ground connection point.

4. The contractor shall install of new Direct Digital Control (DDC) building heating ventilation and air conditioning control system.

1.1.2 Location

The work is located at the building S18, Aviation Training Center, 8501 Tanner Williams Road, Mobile AL 36608. Point of Contact: Mr. Ron Confer 251 441-6815

1.2 CONTRACT DRAWINGS

The following drawings accompany this specification and are a part thereof.

Drawing No. S18684280 G001/M101/M102/M103/M601/M602/M603/E101/E102/E601 Sheets 1 through 10

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this Contract.

Before work is started, arrange with the Contracting Officer Representative a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

PART 2 PRODUCTS

EXECUTION

Not used.

-- End of Section -- SECTION 01 11 00 Page 1

Not used.PART 3

SECTION 01 14 00

WORK RESTRICTIONS

PART 1 GENERAL

1.1 CONTRACTOR ACCESS AND USE OF PREMISES

1.1.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.1.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.1.1.2 Identification Badges and Installation Access

Obtain access to the installation by obtaining passes from the Base Pass and Identification Office.

a. Multi-Day Passes: The Contractor's personnel will have to obtain passes, be subject to mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes.

1.1.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.1.2 Working Hours

Regular working hours must consist of an 8 1/2 hour period, between 7 a.m.

and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.1.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods

SECTION 01 14 00 Page 1 of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 14 00 Page 2

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

1. 2 SUPERVISION

1. 2. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.

1. 2. 2 Super i nt endent Qual i f i cat i ons

The pr oj ect super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

For r out i ne pr oj ect s wher e t he super i nt endent i s per mi t t ed t o al so ser ve as t he Qual i t y Cont r ol ( QC) Manager as est abl i shed i n Sect i on 01 45 00. 00 20 QUALI TY CONTROL, t he super i nt endent must have qual i f i cat i ons i n accor dance wi t h t hat sect i on.

1. 2. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o i nsur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

SECTI ON 01 30 00 Page 1

1. 3 PRECONSTRUCTION

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k. Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.

1. 4 ELECTRONI C MAI L ( E- MAI L) ADDRESS

Est abl i sh and mai nt ai n el ect r oni c mai l ( e- mai l ) capabi l i t y al ong wi t h t he capabi l i t y t o open var i ous el ect r oni c at t achment s as t ext f i l es, pdf f i l es, and ot her s i mi l ar f or mat s. Wi t hi n 10 days af t er cont r act awar d, pr ovi de t he Cont r act i ng Of f i cer a s i ngl e ( onl y one) e- mai l addr ess f or el ect r oni c communi cat i ons f r om t he Cont r act i ng Of f i cer r el at ed t o t hi s cont r act i ncl udi ng, but not l i mi t ed t o cont r act document s, i nvoi ce i nf or mat i on, r equest f or pr oposal s, and ot her cor r espondence. The Cont r act i ng Of f i cer may al so use emai l t o not i f y t he Cont r act or of base access condi t i ons when emer gency condi t i ons war r ant , such as hur r i canes or t er r or i st t hr eat s.

Mul t i pl e emai l addr esses ar e not al l owed.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 30 00 Page 2

SECTI ON 01 32 16. 00 20

SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Const r uct i on Schedul e; G

SD- 07 Cer t i f i cat es

Mont hl y Updat es

1. 2 ACCEPTANCE

Pr i or t o t he st ar t of wor k, pr epar e and submi t t o t he Cont r act i ng Of f i cer f or accept ance a const r uct i on schedul e i n t he f or m of a Net wor k Anal ysi s Schedul e ( NAS) .

1. 3 SCHEDULE FORMAT

1. 3. 1 Schedul e Submi t t al s and Pr ocedur es

Submi t Net wor k Anal ysi s Schedul es ( NAS) and updat es i n har d copy and on el ect r oni c medi a t hat i s accept abl e t o t he Cont r act i ng Of f i cer . Submi t an el ect r oni c back- up of t he pr oj ect schedul e i n an i mpor t f or mat compat i bl e wi t h t he Gover nment ' s schedul i ng pr ogr am.

1. 4 SCHEDULE MONTHLY UPDATES

Updat e t he Const r uct i on Schedul e at mont hl y i nt er val s or when t he schedul e has been r evi sed. The updat ed schedul e must be kept cur r ent , r ef l ect i ng act ual act i v i t y pr ogr ess and pl an f or compl et i ng t he r emai ni ng wor k. Submi t copi es of pur chase or der s and conf i r mat i on of del i ver y dat es as di r ect ed by t he Cont r act i ng Of f i cer .

a. Nar r at i ve Repor t : Pr ovi de wi t h schedul e updat es. I dent i f y and j ust i f y ;

( 1) Pr ogr ess made i n each ar ea of t he pr oj ect

( 2) Cr i t i cal Pat h

( 3) Dat e/ t i me const r ai nt ( s) , ot her t han t hose r equi r ed by t he cont r act

( 4) Changes i n t he f ol l owi ng; added or del et ed act i v i t i es, or i gi nal and r emai ni ng dur at i ons f or act i v i t i es t hat have not st ar t ed, l ogi c, mi l est ones, pl anned sequence of oper at i ons, and cr i t i cal path

SECTI ON 01 32 16. 00 20 Page 1

( 5) St at us of Cont r act Compl et i on Dat e and i nt er i m mi l est ones;

( 6) Cur r ent and ant i c i pat ed del ays ( descr i be cause of del ay and cor r ect i ve act i ons( s) and mi t i gat i on measur es t o mi ni mi ze) ;

( 7) Descr i pt i on of cur r ent and f ut ur e schedul e pr obl em ar eas.

Each ent r y i n t he nar r at i ve r epor t must c i t e t he r espect i ve Act i v i t y I D and Act i v i t y Descr i pt i on, t he dat e and r eason f or t he change, and descr i pt i on of t he change.

1. 5 3- WEEK LOOK AHEAD SCHEDULE

Pr epar e and i ssue a 3- Week Look Ahead schedul e t o pr ovi de a mor e det ai l ed day- t o- day pl an of upcomi ng wor k i dent i f i ed on t he Const r uct i on Schedul e.

Addi t i onal l y, i ncl ude upcomi ng out ages, c l osur es, pr epar at or y meet i ngs, and i ni t i al meet i ngs. I dent i f y cr i t i cal pat h act i v i t i es on t he Thr ee- Week Look Ahead Schedul e. The det ai l wor k pl ans ar e t o be gant t char t t ype.

Act i v i t i es must not exceed 5 wor ki ng days i n dur at i on and have suf f i c i ent l evel of det ai l t o assi gn cr ews, t ool s and equi pment r equi r ed t o compl et e t he wor k. Del i ver one el ect r oni c f i l e of t he 3- Week Look Ahead Schedul e t o t he Cont r act i ng Of f i cer no l at er t han 8 a. m. each Monday, and r evi ew dur i ng t he weekl y CQC Coor di nat i on or Pr oduct i on Meet i ng.

1. 6 CORRESPONDENCE AND TEST REPORTS:

Al l cor r espondence ( e. g. , l et t er s, Request s f or I nf or mat i on ( RFI s) , e- mai l s, meet i ng mi nut e i t ems, Pr oduct i on and QC Dai l y Repor t s, mat er i al del i ver y t i cket s, phot ogr aphs) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed. Al l t est r epor t s ( e. g. , concr et e, soi l compact i on, wel d, pr essur e) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed.

1. 7 ADDI TI ONAL SCHEDULI NG REQUI REMENTS

Any r ef er ences t o addi t i onal schedul i ng r equi r ement s, i ncl udi ng syst ems t o be i nspect ed, t est ed and commi ssi oned, t hat ar e l ocat ed t hr oughout t he r emai nder of t he Cont r act Document s, ar e subj ect t o al l r equi r ement s of t hi s sect i on.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

SECTI ON 01 32 16. 00 20 Page 2

SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

PART 1 GENERAL

1. 1 DEFINITIONS

1. 1. 1 Submi t t al Descr i pt i ons ( SD)

Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.

Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al s whi ch ar e r equi r ed pr i or t o st ar t of const r uct i on ( wor k) .

Cer t i f i cat es of i nsur ance

Sur et y bonds

Submi t t al r egi st er

Schedul e of pr i ces or Ear ned Val ue Repor t

Heal t h and saf et y pl an

Wor k pl an

Envi r onment al pr ot ect i on pl an

SD- 02 Shop Dr awi ngs

SD- 03 Pr oduct Dat a

Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.

SD- 04 Sampl es

Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .

SD- 06 Test Repor t s

Repor t whi ch i nc l udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.

I nvest i gat i on r epor t s I nf r ar ed Sur vey.

SD- 07 Cer t i f i cat es

SECTI ON 01 33 00 Page 1

St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat t he pr oduct , syst em, or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .

SD- 08 Manuf act ur er ' s I nst r uct i ons

Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and ( MSDS) concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Document at i on of t he t est i ng and ver i f i cat i on act i ons t aken by manuf act ur er ' s r epr esent at i ve at t he j ob s i t e, i n t he v i c i ni t y of t he j ob s i t e, or on a sampl e t aken f r om t he j ob s i t e, on a por t i on of t he wor k, dur i ng or af t er i nst al l at i on, t o conf i r m compl i ance wi t h manuf act ur er ' s st andar ds or i nst r uct i ons.

Fact or y t est r epor t s.

SD- 10 Oper at i on and Mai nt enance Dat a

Dat a t hat i s f ur ni shed by t he manuf act ur er .

Thi s dat a i s i nt ended t o be i ncor por at ed i n an mai nt enance manual .

SD- 11 Cl oseout Submi t t al s

Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.

1. 1. 2 Appr ovi ng Aut hor i t y

Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .

1. 1. 3 Work

As used i n t hi s sect i on, on- and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, except t hose SD- 01 Pr e- Const r uct i on Submi t t al s not ed above, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such construction.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al Regi st er

1. 3 SUBMI TTAL CLASSI FI CATI ON

Submi t t al s ar e c l assi f i ed as f ol l ows:

SECTI ON 01 33 00 Page 2

1. 4 VARIATIONS

Var i at i ons f r om cont r act r equi r ement s r equi r e Desi gner of Recor d ( DOR) and Cont r act i ng Of f i cer s appr oval pur suant t o cont r act Cl ause FAR 52. 236- 21 and wi l l be consi der ed wher e advant ageous t o Gover nment .

1. 4. 1 Consi der i ng Var i at i ons

Di scussi on wi t h Cont r act i ng Of f i cer pr i or t o submi ssi on, af t er consul t i ng wi t h t he DOR, wi l l hel p ensur e f unct i onal and qual i t y r equi r ement s ar e met and mi ni mi ze r ej ect i ons and r e- submi t t al s. When cont empl at i ng a var i at i on whi ch r esul t s i n l ower cost , consi der submi ssi on of t he var i at i on as a Val ue Engi neer i ng Change Pr oposal ( VECP) .

Speci f i cal l y poi nt out var i at i ons f r om cont r act r equi r ement s i n t r ansmi t t al l et t er s. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at no addi t i onal cost t o t he Government.

1. 4. 2 Pr oposi ng Var i at i ons

When pr oposi ng var i at i on, del i ver wr i t t en r equest t o t he Cont r act i ng Of f i cer , wi t h document at i on of t he nat ur e and f eat ur es of t he var i at i on and why t he var i at i on i s desi r abl e and benef i c i al t o Gover nment , i ncl udi ng t he DOR' s wr i t t en anal ysi s and appr oval . I f l ower cost i s a benef i t , al so i ncl ude an est i mat e of t he cost savi ngs. I n addi t i on t o document at i on r equi r ed f or var i at i on, i ncl ude t he submi t t al s r equi r ed f or t he i t em.

Cl ear l y mar k t he pr oposed var i at i on i n al l document at i on.

1. 4. 3 Revi ew Schedul e Ext ensi on

I n addi t i on t o nor mal submi t t al r evi ew per i od, a per i od of 10 wor ki ng days wi l l be al l owed f or consi der at i on by t he Gover nment of submi t t al s wi t h variations.

1. 5 GOVERNMENT APPROVI NG AUTHORI TY

When appr ovi ng aut hor i t y i s Cont r act i ng Of f i cer , t he Gover nment wi l l :

a. Not e dat e on whi ch submi t t al was r ecei ved f r om QC Manager .

b. Revi ew submi t t al s f or appr oval wi t hi n schedul i ng per i od speci f i ed and onl y f or conf or mance wi t h pr oj ect desi gn concept s and compl i ance wi t h cont r act document s.

c. I dent i f y r et ur ned submi t t al s wi t h one of t he act i ons def i ned i n par agr aph REVI EW NOTATI ONS and wi t h mar ki ngs appr opr i at e f or act i on indicated.

Upon compl et i on of r evi ew of submi t t al s r equi r i ng Gover nment appr oval , st amp and dat e submi t t al s.

1. 5. 1 Revi ew Not at i ons

Submi t t al s wi l l be r et ur ned t o t he Cont r act or wi t h t he f ol l owi ng not at i ons:

a. Submi t t al s mar ked " appr oved" or " accept ed" aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed.

SECTI ON 01 33 00 Page 3

b. Submi t t al s mar ked " appr oved as not ed" or " appr oved, except as not ed, r esubmi t t al not r equi r ed, " aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed pr ovi ded he t akes no except i on t o t he cor r ect i ons.

c. Submi t t al s mar ked " not appr oved" or " di sappr oved, " or " r evi se and r esubmi t , " i ndi cat e noncompl i ance wi t h t he cont r act r equi r ement s or desi gn concept , or t hat submi t t al i s i ncompl et e. Resubmi t wi t h appr opr i at e changes. No wor k shal l pr oceed f or t hi s i t em unt i l r esubmi t t al i s appr oved.

1. 6 DI SAPPROVED OR REJECTED SUBMI TTALS

Make cor r ect i ons r equi r ed by t he Cont r act i ng Of f i cer . I f t he Cont r act or consi der s any cor r ect i on or not at i on on t he r et ur ned submi t t al s t o const i t ut e a change t o t he cont r act dr awi ngs or speci f i cat i ons; not i ce as r equi r ed under t he FAR cl ause ent i t l ed CHANGES, i s t o be gi ven t o t he Cont r act i ng Of f i cer . Cont r act or i s r esponsi bl e f or t he di mensi ons and desi gn of connect i on det ai l s and const r uct i on of wor k. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at t he Cont r act or ' s expense.

I f changes ar e necessar y t o submi t t al s, make such r evi s i ons and submi ssi on of t he submi t t al s i n accor dance wi t h t he pr ocedur es above. No i t em of wor k r equi r i ng a submi t t al change i s t o be accompl i shed unt i l t he changed submi t t al s ar e appr oved.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

SECTI ON 01 33 00 Page 4

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 4 PAGES

Repair_Mechanical & HVAC Systems_Composite Bldg (S18)

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GConstruction Schedule

SD-07 Certificates 1.4Monthly Updates

01 33 00 SD-01 Preconstruction Submittals Submittal Register

01 78 00 SD-03 Product Data Warranty Management Plan

1.4.1Warranty Tags SD-08 Manufacturer’s Instructions Instructions

01 78 23 SD-10 Operation and Maintenance Data

GO&M Database

3.1.1 GTraining Plan

07 56 00 SD-03 Product Data 2.1Protective coating

Top Coat SD-04 Samples

1.4.3Sample warranty SD-07 Certificates

1.4.1Qualification of Manufacturer 1.4.2Qualification of Applicator

SD-08 Manufacturer’s Instructions

2.1PROTECTIVE COATING

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 4 PAGES

07 56 00 1.5Warranty 07 60 00 SD-02 Shop Drawings

3.1.3 GFlashing at roof penetrations

SD-11 Closeout Submittals Quality Control Plan

23 09 23.13 20 SD-02 Shop Drawings GControl System Drawings Title

Sheet GList of I/O Points GControl System Components List GControl System Schematics GHVAC Equipment Electrical

Ladder Diagrams GComponent Wiring Diagrams GTerminal Strip Diagrams GBACnet Communication

Architecture Schematic SD-03 Product Data

2.1.2 GDirect Digital Controllers

SD-11 Closeout Submittals

3.5.1 GTraining Documentation

23 74 33.00 40 SD-02 Shop Drawings

Packaged Unit 2.1.1.1Compressor 2.1.1.2Cooling Coil 2.1.1.5Controls

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 4 PAGES

23 74 33.00 40 2.1.1.4Casing 2.1.1.7Condenser 3.1Installation Drawings

SD-03 Product Data Part 2Equipment and Performance

Data 3.2.1Air-Conditioning Systems 2.1.1.1Compressor 2.1.1.2Cooling Coil 2.1.1.3Fans 2.1.1.5Controls 2.1.1.4Casing 2.1.1.6Filters 2.1.1.7Condenser 2.2.1Vibration Isolation

SD-07 Certificates 1.3List of Product Installations 1.4Manufacturer's Warranty

Coil Coating Warranty SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

26 05 00.00 40 SD-01 Preconstruction Submittals 2.1Material, Equipment, and Fixture

Lists

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 4 PAGES

26 05 00.00 40 SD-03 Product Data 2.1.6Circuit Breakers

SD-07 Certificates 1.4Certification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 19.00 10 SD-03 Product Data 3.1Installation Instructions

SD-06 Test Reports Tests, Inspections, and Verifications

26 05 71.00 40 SD-03 Product Data

2.2 GCircuit Breakers

SD-07 Certificates Circuit Tests

SD-08 Manufacturer’s Instructions 3.1Protective Devices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SECTI ON 01 42 00

SOURCES FOR REFERENCE PUBLI CATI ONS

PART 1 GENERAL

1. 1 REFERENCES

Var i ous publ i cat i ons ar e r ef er enced i n ot her sect i ons of t he speci f i cat i ons t o est abl i sh r equi r ement s f or t he wor k. These r ef er ences ar e i dent i f i ed i n each sect i on by document number , dat e and t i t l e. The document number used i n t he c i t at i on i s t he number assi gned by t he st andar ds pr oduci ng or gani zat i on ( e. g. ASTM B564 St andar d Speci f i cat i on f or Ni ckel Al l oy For gi ngs) . However , when t he st andar ds pr oduci ng or gani zat i on has not assi gned a number t o a document , an i dent i f y i ng number has been assi gned f or r ef er ence pur poses.

1. 2 ORDERI NG I NFORMATI ON

The addr esses of t he st andar ds publ i shi ng or gani zat i ons whose document s ar e r ef er enced i n ot her sect i ons of t hese speci f i cat i ons ar e l i s t ed bel ow, and i f t he sour ce of t he publ i cat i ons i s di f f er ent f r om t he addr ess of t he sponsor i ng or gani zat i on, t hat i nf or mat i on i s al so pr ovi ded.

AI R MOVEMENT AND CONTROL ASSOCI ATI ON I NTERNATI ONAL ( AMCA)

30 West Uni ver si t y Dr i ve Ar l i ngt on Hei ght s, I L 60004- 1893 Ph: 847- 394- 0150 Fax: 847- 253- 0088 E- mai l : amca@amca. or g I nt er net : http://www.amca.org

AI R- CONDI TI ONI NG, HEATI NG AND REFRI GERATI ON I NSTI TUTE ( AHRI )

2111 Wi l son Bl vd, Sui t e 500 Ar l i ngt on, VA 22201 Ph: 703- 524- 8800 Fax: 703- 562- 1942 Internet: http://www.ahrinet.org

AMERI CAN BEARI NG MANUFACTURERS ASSOCI ATI ON ( ABMA)

2025 M St r eet , NW, Sui t e 800 Washi ngt on, DC 20036 Ph: 202- 367- 1155 E- mai l : i nf o@amer i canbear i ngs. or g I nt er net : http://www.americanbearings.org

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

1791 Tul l i e Ci r c l e, NE At l ant a, GA 30329 Ph: 800- 527- 4723 or 404- 636- 8400 Fax: 404- 321- 5478 E- mai l : ashr ae@ashr ae. or g I nt er net : http://www.ashrae.org

SECTI ON 01 42 00 Page 1

ASTM I NTERNATI ONAL ( ASTM)

100 Bar r Har bor Dr i ve, P. O. Box C700 West Conshohocken, PA 19428- 2959 Ph: 877- 909- 2786 I nt er net : http://www.astm.org

ELECTRONI C I NDUSTRI ES ALLI ANCE ( EI A)

EI A has become par t of t he ELECTRONI C COMPONENTS I NDUSTRY

ASSOCI ATI ON ( ECI A)

I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)

445 and 501 Hoes Lane Pi scat away, NJ 08854- 4141 Ph: 732- 981- 0060 or 800- 701- 4333 Fax: 732- 562- 9667 E- mai l : onl i nesuppor t @i eee. or g I nt er net : http://www.ieee.org

NATI ONAL ELECTRI CAL MANUFACTURERS ASSOCI ATI ON ( NEMA)

1300 Nor t h 17t h St r eet , Sui t e 900 Ar l i ngt on, VA 22209 Ph: 703- 841- 3200 I nt er net : http://www.nema.org/

NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)

1 Bat t er ymar ch Par k Qui ncy, MA 02169- 7471 Ph: 617- 770- 3000 Fax: 617- 770- 0700 I nt er net : http://www.nfpa.org

SHEET METAL AND AI R CONDI TI ONI NG CONTRACTORS' NATI ONAL ASSOCI ATI ON

(SMACNA)

4201 Laf ayet t e Cent er Dr i ve Chant i l l y , VA 20151- 1219 Ph: 703- 803- 2980 Fax: 703- 803- 3732 I nt er net : http://www.smacna.org

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

CRD- C DOCUMENTS avai l abl e on I nt er net :

http://www.wbdg.org/ccb/browse_cat.php?c=68 Or der Ot her Document s f r om:

USACE Publ i cat i ons Depot At t n: CEHEC- I M- PD 2803 52nd Avenue Hyat t svi l l e, MD 20781- 1102 Ph: 301- 394- 0081 Fax: 301- 394- 0084 E- mai l : pubs- ar my@usace. ar my. mi l I nt er net : http://www.publications.usace.army.mil/ or http://www.hnc.usace.army.mil/Missions/Engineering/TECHINFO.aspx

UNDERWRI TERS LABORATORI ES ( UL)

2600 N. W. Lake Road Camas, WA 98607- 8542 Ph: 877- 854- 3577 E- mai l : CEC. us@us. ul . com

SECTI ON 01 42 00 Page 2

I nt er net : http://www.ul.com/ UL Di r ect or i es avai l abl e t hr ough I HS at http://www.ihs.com

PART 2 PRODUCTS

Not used

PART 3 EXECUTI ON

Not used

SECTI ON 01 42 00 Page 3

SECTION 01 78 00

CLOSEOUT SUBMITTALS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E1971 (2005; R 2011) Stewardship for the Cleaning of Commercial and Institutional Buildings

1.2 DEFINITIONS

1.2.1 As-Built Drawings

As-built drawings are developed and maintained by the Contractor and depict actual conditions, including deviations from the Contract Documents.

Maintain the as-build's throughout construction as red-lined hard copies on site and red-lined PDF files. These files serve as the basis for the creation of the record drawings.

1.2.2 Record Drawings

The record drawings are the final compilation of actual conditions reflected in the as-built drawings.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.:

SD-03 Product Data

Warranty Management Plan Warranty Tags

SD-08 Manufacturer's Instructions

Posted Instructions

1.4 WARRANTY MANAGEMENT

1.4.1 Warranty Tags

At the time of installation, tag each warranted item with a durable, oil and water resistant tag approved by the Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also, submit tworecord copies of the warranty tags showing the layout and

SECTION 01 78 00 Page 1 desi gn. The dat e of accept ance and t he QC si gnat ur e must r emai n bl ank unt i l t he pr oj ect i s accept ed f or benef i c i al occupancy. Show t he f ol l owi ng i nf or mat i on on t he t ag.

Type of pr oduct / mat er i al

Model number

Ser i al number

Cont r act number

War r ant y per i od f r om/ t o

I nspect or ' s s i gnat ur e

Const r uct i on Cont r act or

Address

Tel ephone number

War r ant y cont act

Address

Tel ephone number

War r ant y r esponse t i me pr i or i t y code

WARNI NG - PROJECT PERSONNEL TO PERFORM ONLY OPERATI ONAL MAI NTENANCE DURI NG THE

WARRANTY PERI OD.

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 OPERATI ON AND MAI NTENANCE MANUALS

Pr ovi de pr oj ect oper at i on and mai nt enance manual s as speci f i ed i n Sect i on

01 78 23 OPERATI ON AND MAI NTENANCE MANUALS DATA.

3. 2 CLEANUP

Pr ovi de f i nal c l eani ng i n accor dance wi t h ASTM E1971 and submi t t wo copi es of t he l i s t i ng of compl et ed f i nal c l ean- up i t ems. Leave pr emi ses " br oom clean." Cl ean i nt er i or and ext er i or gl ass sur f aces exposed t o v i ew; r emove t empor ar y l abel s, st ai ns and f or ei gn subst ances; pol i sh t r anspar ent and gl ossy sur f aces; vacuum car pet ed and sof t sur f aces. Cl ean equi pment and f i x t ur es t o a sani t ar y condi t i on. Repl ace f i l t er s of oper at i ng equi pment .

Cl ean debr i s f r om r oof s, gut t er s, downspout s and dr ai nage syst ems. Sweep

SECTI ON 01 78 00 Page 2 paved ar eas and r ake c l ean l andscaped ar eas. Remove wast e and sur pl us mat er i al s, r ubbi sh and const r uct i on f aci l i t i es f r om t he s i t e.

SECTI ON 01 78 00 Page 3

SECTI ON 01 78 23

OPERATI ON AND MAI NTENANCE DATA

PART 1 GENERAL

1. 1 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 10 Oper at i on and Mai nt enance Dat a

O&M Dat abase ; G

Tr ai ni ng Pl an ; G

SD- 11 Cl oseout Submi t t al s

1. 2 OPERATI ON AND MAI NTENANCE DATA

Submi t Oper at i on and Mai nt enance ( O&M) Dat a f or t he pr ovi ded equi pment , pr oduct , or syst em, def i ni ng t he i mpor t ance of syst em i nt er act i ons, t r oubl eshoot i ng, and l ong- t er m pr event i ve oper at i on and mai nt enance.

Compi l e, pr epar e, and aggr egat e O&M dat a t o i ncl ude cl ar i f y i ng and updat i ng t he or i gi nal sequences of oper at i on t o as- bui l t condi t i ons. Or gani ze and pr esent i nf or mat i on i n suf f i c i ent det ai l t o c l ear l y expl ai n O&M r equi r ement s at t he syst em, equi pment , component , and subassembl y l evel .

I ncl ude an i ndex pr ecedi ng each submi t t al . Submi t i n accor dance wi t h t hi s sect i on and Sect i on 01 33 00 SUBMI TTAL PROCEDURES.

1. 2. 1 Package Qual i t y

Document s must be f ul l y l egi bl e. Oper at i on and Mai nt enance dat a must be consi st ent wi t h t he manuf act ur er ' s st andar d br ochur es, schemat i cs, pr i nt ed i nst r uct i ons, gener al oper at i ng pr ocedur es, and saf et y pr ecaut i ons.

1. 2. 2 Package Cont ent

Pr ovi de dat a package cont ent i n accor dance wi t h par agr aph SCHEDULE OF OPERATI ON AND MAI NTENANCE DATA PACKAGES. Compl y wi t h t he dat a package r equi r ement s speci f i ed i n t he i ndi v i dual t echni cal sect i ons, i ncl udi ng t he cont ent of t he packages and addr essi ng each pr oduct , component , and syst em desi gnat ed f or dat a package submi ssi on.

1. 3 TYPES OF I NFORMATI ON REQUI RED I N O&M DATA PACKAGES

The f ol l owi ng ar e a det ai l ed descr i pt i on of t he dat a package i t ems l i s t ed i n par agr aph SCHEDULE OF OPERATI ON AND MAI NTENANCE DATA PACKAGES.

1. 3. 1 Oper at i ng I nst r uct i ons

Pr ovi de speci f i c i nst r uct i ons, pr ocedur es, and i l l ust r at i ons f or t he f ol l owi ng phases of oper at i on f or t he i nst al l ed model and f eat ur es of each

SECTI ON 01 78 23 Page 1 system:

1. 3. 1. 1 Oper at or Pr est ar t

Pr ovi de pr ocedur es r equi r ed t o i nst al l , set up, and pr epar e each syst em f or use.

1. 3. 1. 2 St ar t up, Shut down, and Post - Shut down Pr ocedur es

Pr ovi de nar r at i ve descr i pt i on f or St ar t up, Shut down and Post - shut down oper at i ng pr ocedur es i ncl udi ng t he cont r ol sequence f or each pr ocedur e.

1. 3. 1. 3 Nor mal Oper at i ons

Pr ovi de Cont r ol Di agr ams wi t h dat a t o expl ai n oper at i on and cont r ol of syst ems and speci f i c equi pment . Pr ovi de nar r at i ve descr i pt i on of Nor mal Oper at i ng Pr ocedur es.

1. 3. 1. 4 Emer gency Oper at i ons

Pr ovi de Emer gency Pr ocedur es f or equi pment mal f unct i ons t o per mi t a shor t per i od of cont i nued oper at i on or t o shut down t he equi pment t o pr event f ur t her damage t o syst ems and equi pment . Pr ovi de Emer gency Shut down I nst r uct i ons f or f i r e, expl osi on, spi l l s , or ot her f or eseeabl e cont i ngenci es. Pr ovi de gui dance and pr ocedur es f or emer gency oper at i on of ut i l i t y syst ems i ncl udi ng r equi r ed val ve posi t i ons, val ve l ocat i ons and zones or por t i ons of syst ems cont r ol l ed.

1. 3. 1. 5 Oper at or Ser vi ce Requi r ement s

Pr ovi de i nst r uct i ons f or ser vi ces t o be per f or med by t he oper at or such as l ubr i cat i on, adj ust ment , i nspect i on, and r ecor di ng gauge r eadi ngs.

1. 3. 1. 6 Envi r onment al Condi t i ons

Pr ovi de a l i s t of Envi r onment al Condi t i ons ( t emper at ur e, humi di t y, and ot her r el evant dat a) t hat ar e best sui t ed f or t he oper at i on of each pr oduct , component or syst em. Descr i be condi t i ons under whi ch t he i t em equi pment shoul d not be al l owed t o r un.

1. 3. 1. 7 Oper at i ng Log

Pr ovi de f or ms, sampl e l ogs, and i nst r uct i ons f or mai nt ai ni ng necessar y oper at i ng r ecor ds.

1. 3. 1. 8 Addi t i onal Requi r ement s f or HVAC Cont r ol Syst ems

Pr ovi de Dat a Package 5 and t he f ol l owi ng f or cont r ol syst ems:

a. Nar r at i ve descr i pt i on on how t o per f or m and appl y f unct i ons, f eat ur es, modes, and ot her oper at i ons, i ncl udi ng unoccupi ed oper at i on, seasonal changeover , manual oper at i on, and al ar ms. I ncl ude det ai l ed t echni cal manual f or pr ogr ammi ng and cust omi zi ng cont r ol l oops and al gor i t hms.

b. Ful l as- bui l t sequence of oper at i ons.

c. Copi es of checkout t est s and cal i br at i ons per f or med by t he Cont r act or .

SECTI ON 01 78 23 Page 2

1. 3. 2 Appendices

Pr ovi de i nf or mat i on r equi r ed bel ow and i nf or mat i on not speci f i ed i n t he pr ecedi ng par agr aphs but per t i nent t o t he mai nt enance or oper at i on of t he pr oduct or equi pment . I ncl ude t he f ol l owi ng:

1. 3. 2. 1 Per sonnel Tr ai ni ng Requi r ement s

Pr ovi de i nf or mat i on avai l abl e f r om t he manuf act ur er s t hat i s needed f or use i n t r ai ni ng desi gnat ed per sonnel t o pr oper l y oper at e and mai nt ai n t he equi pment and syst ems.

1. 3. 2. 2 Fi el d Test Repor t s

Pr ovi de a copy of Fi el d Test Repor t s ( SD- 06) submi t t al s document ed wi t h t he r equi r ed appr oval .

1. 3. 2. 3 Cont r act or I nf or mat i on

Pr ovi de a l i s t t hat i ncl udes t he name, addr ess, and t el ephone number of t he Gener al Cont r act or and each Subcont r act or who i nst al l ed t he pr oduct or equi pment , or syst em. For each i t em, al so pr ovi de t he name addr ess and t el ephone number of t he manuf act ur er ' s r epr esent at i ve and ser vi ce or gani zat i on t hat can pr ovi de r epl acement s most conveni ent t o t he pr oj ect s i t e. Pr ovi de t he name, addr ess, and t el ephone number of t he pr oduct , equi pment , and syst em manuf act ur er s.

1. 4 SCHEDULE OF OPERATI ON AND MAI NTENANCE DATA PACKAGES

Pr ovi de t he O&M dat a packages speci f i ed i n i ndi v i dual t echni cal sect i ons.

The i nf or mat i on r equi r ed i n each t ype of dat a package f ol l ows:

1. 4. 1 Dat a Package 1

a. Saf et y pr ecaut i ons and hazar ds

b. Cl eani ng r ecommendat i ons

c. Mai nt enance and r epai r pr ocedur es

d. War r ant y i nf or mat i on

e. Ext ended war r ant y i nf or mat i on f . Cont r act or i nf or mat i on

g. Spar e par t s and suppl y l i s t

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 TRAINING

Pr i or t o accept ance of t he f aci l i t y by t he Cont r act i ng Of f i cer f or Benef i c i al Occupancy, pr ovi de compr ehensi ve t r ai ni ng f or t he syst ems and equi pment speci f i ed i n t he t echni cal speci f i cat i ons. Addr ess aspect s of

SECTI ON 01 78 23 Page 3 t he Oper at i on and Mai nt enance Manual submi t t ed i n accor dance wi t h Sect i on 01 78 00 CLOSEOUT SUBMI TTALS. Tr ai ni ng must i ncl ude cl assr oom or f i el d l ect ur es based on t he syst em oper at i ng r equi r ement s. The l ocat i on of c l assr oom t r ai ni ng r equi r es appr oval by t he Cont r act i ng Of f i cer .

3. 1. 1 Tr ai ni ng Pl an

Submi t a wr i t t en t r ai ni ng pl an t o t he Cont r act i ng Of f i cer f or appr oval at l east 60 cal endar days pr i or t o t he schedul ed t r ai ni ng. Tr ai ni ng pl an must be appr oved by t he Qual i t y Cont r ol Manager ( QC) pr i or t o f or war di ng t o t he Cont r act i ng Of f i cer . I ncl ude wi t hi n t he pl an t he f ol l owi ng el ement s:

a. Equi pment i ncl uded i n t r ai ni ng

b. I nt ended audi ence

c. Locat i on of t r ai ni ng

d. Dat es of t r ai ni ng

e. Obj ect i ves f . Out l i ne of t he i nf or mat i on t o be pr esent ed and subj ect s cover ed i ncl udi ng descr i pt i on

g. St ar t and f i ni sh t i mes and dur at i on of t r ai ni ng on each subj ect

h. Met hods ( e. g. c l assr oom l ect ur e, v i deo, s i t e wal k- t hr ough, act ual oper at i onal demonst r at i ons, wr i t t en handout s) i . I nst r uct or names and i nst r uct or qual i f i cat i ons f or each subj ect j . Li st of t ext s and ot her mat er i al s t o be f ur ni shed by t he Cont r act or t hat ar e r equi r ed t o suppor t t r ai ni ng

k. Descr i pt i on of pr oposed sof t war e t o be used f or v i deo r ecor di ng of t r ai ni ng sessi ons.

3. 1. 2 Tr ai ni ng Cont ent

The cor e of t hi s t r ai ni ng must be based on manuf act ur er ' s r ecommendat i ons and t he oper at i on and mai nt enance i nf or mat i on. The QC i s r esponsi bl e f or over seei ng and appr ovi ng t he cont ent and adequacy of t he t r ai ni ng. Spend 95 per cent of t he i nst r uct i on t i me dur i ng t he pr esent at i on on t he OPERATI ON AND MAI NTENANCE DATA. I ncl ude t he f ol l owi ng f or each syst em t r ai ni ng presentation:

a. St ar t - up, nor mal oper at i on, shut down, unoccupi ed oper at i on, seasonal changeover , manual oper at i on, cont r ol s set - up and pr ogr ammi ng, t r oubl eshoot i ng, and al ar ms.

b. Rel evant heal t h and saf et y i ssues.

c. Di scussi on of how t he f eat ur e or syst em i s envi r onment al l y r esponsi ve.

Advi se adj ust ment s and opt i mi z i ng met hods f or ener gy conser vat i on.

d. Desi gn i nt ent .

e. Use of O&M Manual Fi l es.

SECTI ON 01 78 23 Page 4 f . Revi ew of cont r ol dr awi ngs and schemat i cs.

g. I nt er act i ons wi t h ot her syst ems.

h. Speci al mai nt enance and r epl acement sour ces.

i . Tenant i nt er act i on i ssues.

3. 1. 3 Tr ai ni ng Out l i ne

Pr ovi de t he Oper at i on and Mai nt enance Manual Fi l es ( Bookmar ked PDF) and a wr i t t en cour se out l i ne l i s t i ng t he maj or and mi nor t opi cs t o be di scussed by t he i nst r uct or on each day of t he cour se t o each t r ai nee i n t he cour se.

Pr ovi de t he cour se out l i ne 14 cal endar days pr i or t o t he t r ai ni ng.

SECTI ON 01 78 23 Page 5

SECTION 07 56 00

FLUID APPLIED COOL ROOF RESTORATION COATING SYSTEM

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D2697 (2003; R 2008) Volume Nonvolatile Matter in Clear or Pigmented Coatings

ASTM D56 (2005; R 2010) Flash Point by Tag Closed Cup Tester

ASTM D93 (2013) Flash-Point by Pensky-Martens Closed Cup Tester

1.2 DESCRIPTION OF ROOF SYSTEM

The roofing system shall consist of sprayed in-place waterproof elastomeric protective coating.

1.2.1 Design Requirements

1.2.1.1 Fire and Wind Uplift

Ratings from other independent laboratories may be substituted provided that the tests, requirements and ratings are documented to be equivalent, to the satisfaction of the Contracting Officer.

1.2.2 Performance Requirements

The installed roof system shall be watertight; free of defects; suitable for the climatic and service conditions of the installation; and shall provide for positive drainage of the roof area.

1.3 SUBMITTALS

Government approval is required for submittals. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Protective coating

Top Coat

Submit literature including material description, physical properties, recommended storage conditions, Material Safety Data Sheets, and shelf life expiration date.

SECTION 07 56 00 Page 1

Pr ovi de manuf act ur er ' s cer t i f i cat i on t hat mat er i al s ar e manuf act ur ed i n t he Uni t ed St at es cont i ngent t o NAFTA and conf or m t o r equi r ement s speci f i ed her ei n, ar e chemi cal l y and physi cal l y compat i bl e wi t h each ot her , and ar e sui t abl e f or i ncl usi on wi t hi n t he t ot al r oof syst em speci f i ed her ei n

SD- 04 Sampl es

Sampl e war r ant y

SD- 07 Cer t i f i cat es

Qual i f i cat i on of Manuf act ur er

Qual i f i cat i on of Appl i cat or

SD- 08 Manuf act ur er ' s I nst r uct i ons

PROTECTI VE COATI NG

Roof coat i ng

Submi t manuf act ur er ' s compl et e appl i cat i on i nst r uct i ons and det ai l s , and t o i ncl ude st or age, handl i ng, and war ni ngs or pr ecaut i ons on f l ammabi l i t y and t oxi c i t y.

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Dai l y Log

SD- 11 Cl oseout Submi t t al s

Warranty

1. 4 QUALI TY ASSURANCE

1. 4. 1 Qual i f i cat i on of Manuf act ur er

Pr oduct s manuf act ur er shal l have a mi ni mum of 10 year s exper i ence i n t he manuf act ur e of cool r oof coat i ng pr oduct s.

1. 4. 1. 1 Manuf act ur er ' s Techni cal Repr esent at i ve

Manuf act ur er ' s t echni cal r epr esent at i ve shal l have a mi ni mum of 10 year s exper i ence wi t h r oof syst ems pr oduct s and i nst al l at i ons and be t hor oughl y f ami l i ar wi t h t he pr oduct s t o be i nst al l ed, i nst al l at i on r equi r ement s and pr act i ces, qual i t y cont r ol of t he i nst al l at i on, and wi t h any speci al consi der at i ons i n t he geogr aphi cal ar ea and cl i mat e wher e const r uct i on wi l l t ake pl ace. The r epr esent at i ve shal l be avai l abl e t o per f or m f i el d i nspect i ons and at t end meet i ngs as speci f i ed.

1. 4. 2 Qual i f i cat i on of Appl i cat or

The r oof syst em appl i cat or shal l have pr i or manuf act ur er t r ai ni ng i n t he appl i cat i on of coat i ng mat er i al s. Appl i cat or shal l be cer t i f i ed and appr oved by t he manuf act ur er , i n wr i t i ng, t o appl y t he speci f i ed mat er i al s and pr ovi de t he speci f i ed manuf act ur er war r ant y.

SECTI ON 07 56 00 Page 2

1.4.3 Sample Warranty

Submit sample warranty for the complete roof system meeting the specified warranty requirements. Sample warranty shall be submitted and approved by the Contracting Officer prior to commencement of roof work.

1.5 WARRANTY

Provide roof system material and workmanship warranties meeting specified requirements. Revision or amendment to standard manufacturer warranty shall be provided as required to comply with the specified requirements.

1.5.1 Roof System Manufacturer Warranty

Furnish a single-source roof system manufacturer's XX-year no dollar limit materials and installation workmanship warranty, for a watertight roof system construction.

1.5.2 Roofing System Installer Warranty

The roof system installer shall warrant for a period of not less than two years that the roof system, as installed, is free from defects in installation workmanship, to include coating applications, flashing, accessories, attachments, and sheet metal installation. The warranty shall run directly to the Government. Correction of defective workmanship and replacement of damaged or affected materials shall be the responsibility of the roof system installer. All costs associated with the repair or replacement work shall be the responsibility of the installer.

1.5.3 Continuance of Warranty

Repair or replacement work that becomes necessary within the warranty period shall be approved, as required, and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the…