This is a Statement of Work (SOW) for fuel tank repairs at USCG Station Emerald Isle located at 11101 Terrell Horne III Way, Emerald Isle, NC 28594. The contractor shall provide all labor, materials, equipment, and services necessary to complete fuel tank repairs without fault, including replacement and installation of three replacement alarm boxes for 918 clock gauges (UL listed, 90 decibel with push button test), one clock gauge with alarm featuring a vertical drop tube float with maximum measurement of 12 feet, two OPW 3" x 1.5" test boots with air stems, one 4" x 2" cast iron double-tapped bushing, two Type K At-A-Glance leak gauges for 60" depth with 2" NPT opening (Kruger-Sentry), and one Type K At-A-Glance leak gauge for 43" depth with 2" NPT opening (Kruger-Sentry). Work must commence no later than 14 days after notice to proceed and be completed within 28 working days of contract award. The contract is being evaluated on a Lowest Price Technically Acceptable basis with award as a Firm-Fixed Price contract. Quotes must be submitted by July 31, 2026 at Noon EST to Tyrone.L.Mason@uscg.mil with a mandatory site visit scheduled for July 27, 2026. Questions must be submitted in writing by July 29, 2026 at Noon EST. The designated Contracting Officer's QA Evaluator is MK1 Edward Taylor at (252) 468-8172. All contractors must comply with OSHA safety regulations (29 CFR 1910 and 1926), EPA environmental regulations (40 CFR), provide employee identification lists five days prior to work commencement, maintain vehicles in good repair with visible contractor identification, and ensure daily cleanup with all debris removed offsite or into a contractor-provided container.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A with images.pdf | ||
| 70Z08126QELIZ0012_0_US.pdf | ||
| clauses and provisions.pdf | ||
| wage determinations.pdf | ||
| Station Emerald Isle - SOW FUEL TANK REPAIRS.docx | DOCX document | |
| STA EI Fuel Tanks.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK: USCG STATION EMERALD ISLE FUEL TANK REPAIRS
PR# 30270PR260000012
CEU Work Order:
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment required to complete without fault unit’s fuel tank repairs as per the Scope of Work in Section 3 at USCG Station Emerald Isle 11101 Terrell Horne III Way Emerald Isle, NC 28594.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance, the company shall commence work no later than 14 days after notice to proceed and work diligently to complete the entire work and have areas ready for use by 28 working days after contract has been awarded. Deviations from this timeline due to materials must be documented in the estimate.
3. SCOPE OF WORK:
3.1: Replacement and Installation
- 03 REPLACEMENT ALARM BOX FOR 918 CLOCK GAUGE, UL LISTED
90 DECIBEL, PUSH BUTTON TEST
3.2: Replacement and Installation
- 01 CLOCK GAUGE W/ALARM WITH VERTICAL DROP TUBE FLOAT
MAX MEASUREMENT 12 FEET
3.3: Replacement and Installation
- 02 OPW 3" X 1.5" TEST BOOT WITH AIR STEM
3.4: Replacement and Installation
- 01 BUSHING 4"X2" CAST IRON DOUBLE TAPPED
3.5: Replacement and Installation
- 02 TYPE K AT-A-GLANCE LEAK GAUGE FOR 60" DEPTH W/2"
NPT OPENING (KRUGER-SENTRY)
3.6: Replacement and Installation
- 01 TYPE K AT-A-GLANCE LEAK GAUGE FOR 43" DEPTH W/2"
NPT OPENING (KRUGER-SENTRY)
3.7: General Conditions
- Work performed in accordance with local and federal standards.
- All areas remain clean and free of debris upon completion.
- All equipment to be stored onsite will be left in designated area agreed upon by the contractor performing work and contracting officer’s QAE.
4. SITE VISIT: All bidders shall visit the site to verify any/all quantities before submitting bids. Interested parties shall arrange for a site visit with MK1, Edward Taylor (252) 468-8172.
5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MK1, Edward Taylor (252) 468-8172. Inquiries concerning any phase of the specification before or after award shall be made to the QAE.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any misunderstanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.
7. AFTER AWARD OF THE CONTRACT: The company must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.
8. ORAL MODIFICATION: No oral statement of any person, other than the contracting officer, shall in any manner or degree modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory for the Contracting Officer.
10. PERMITS: No permitting is required for this project.
11. CLEAN UP: All trash and debris shall be removed off site daily or into a container/dumpster provided by the contractor and emptied/removed once job is complete. The job site shall be left in a clean and neat manner daily.
12. WORK OUTSIDE REGULAR HOURS: If the company desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours (0800-1600), he/she must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The company shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and driver’s license number. CG Station Emerald Isle Command Duty Officer (CDO) will be given a copy of the employee list. Each company technician provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
1. Responsibilities:
a. All contractors working on USCG Station Emerald Isle shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Company written safety programs shall be reviewed by MK1 Edward Taylor (252) 468-8172 prior to starting work.
b. Written notification must be provided to MK1 Edward Taylor, in his capacity as Fire Marshal, of any activity that could potentially cause fire or explosion or that change or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification so long as the outsource review sheet is signed by MK1 Edward Taylor.
c. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.
2. Rights:
a. Every employee working on USCG Station Emerald Isle has the right to a safe and healthy workplace. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working on USCG Station Emerald Isle shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by Mr. Todd Ogle, prior to starting work and must be in accordance with the Unit Environmental Guide.
b. Written notification must be provided to Mr. Todd Ogle of any activity that could potentially cause a permit violation on USCG Station Emerald Isle. Some examples of qualifying activities are any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.
c. Copies of the following must be provided to Mr. Todd Ogle prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.