Attachment 3 - Quoters Proposed Delivery Schedule R1.doc

DOC document 84 KB Posted

Attached to
FRC MTU PARTS AND COMPONENT OVERHAULS
Solicitation number
70Z08027R17004B00
Issued by
Not on record

About this file

This is a Quoter's Proposed Delivery Schedule template for U.S. Coast Guard MTU parts and component overhauls under solicitation 70Z08027R17004B00. The document outlines 28 contract line items (CLINs) requiring inspection, overhaul, and testing of various engine components and parts, including four turbos (A1, A2, B1, B2), a cylinder head, two starters, a coolant pump, sea water pump, intercooler core, control lever, oil cooler, and an LOP 8-06 unit. Each component requires two phases of work: an initial open inspection with submission of an inspection report per specification P-233-2039 paragraph 3.1, followed by overhaul work including labor, mandatory parts, contingency parts, preventative maintenance, and shipping with submission of a final test report per specification P-233-2039 paragraph 3.2.

The delivery schedule requires quoters to fill in the number of days for completion of each task. Most inspection items are to be completed within a specified number of days of receipt of Government Furnished Property (GFP), while overhaul items are generally due within a specified number of days after Coast Guard review and approval. One exception is CLIN 0024 for oil cooler inspection, which specifies 5 calendar days as the delivery timeline. The document is a blank template where prospective contractors must propose their delivery schedules, with most timeline fields left blank for quoter completion. The related solicitation amendment, effective November 10, 2026, revised this attachment and extended the quote submission deadline to November 23, 2026, at 4:00 p.m. Eastern Time, requiring submission of a signed SF 30 amendment acknowledgment with proposals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

70Z08027R17004B00

QUOTER’S PROPOSED DELIVERY SCHEDULE

CLIN
DESCRIPTION
EST. QTY/UNIT
WITHIN DAYS AFTER DATE OF CONTRACT
0001 - 4001
For Approval, Test/Inspections Plan in accordance with specification P-233-2039
1
Within ___ days after contract award

0002 - 4002

Open, inspect "A1" Turbo, 2950-12-390-3739, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0003 - 4003
Overhauled “A1" Turbo, 2950-12-390-3739, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0004 - 4004
Open, inspect "A2" Turbo, 2950-12-390-3213, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0005 - 4005
Overhauled "A2: Turbo, 2950-12-390-3213. including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0006 - 4006
Open, inspect "B1" Turbo, 2950-12-390-3341, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0007 – 4007
Overhauled "B1" Turbo, 2950-12-390-3341, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0008 - 4008
Open, inspect "B2" Turbo, 2950-12-390-5601, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0009 – 4009
Overhauled "B2" Turbo, 2950-12-390-5601, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within __ days after Coast Guard Review/Approval

0010 - 4010
Open, Inspect Cylinder Head, 2815-12-401-6623, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0011 - 4011
Overhauled Cylinder Head, 2815-12-401-6623, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0012 - 4012
Open, Inspect Starter, 2920-12-385-6651, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0013 - 4013
Overhauled Starter, 2920-12-385-6651 including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0014 - 4014
Open, Inspect Starter, 2920-12-385-6663, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0015 - 4015
Overhauled Starter, 2920-12-385-6663, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0016 - 4016
Open, Inspect Coolant Pump, 2930-12-408-5714, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0017 - 4017
Overhauled Coolant Pump, 2930-12-408-5714, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0018 - 4018
Open, Inspect Sea Water Pump 4320-12-420-2316 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0019 - 4019
Overhauled Sea Water Pump, 4320-12-420-2316, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0020 - 4020
Open, Inspect Intercooler Core, 2930-12-408-5926, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0021 - 4021
Overhauled Intercooler Core, 2930-12-408-5926, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0022 - 4022
Open, Inspect Control Lever 3040-01-682-0455 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required
Within ___ days after Coast Guard Review/Approval
0023 – 4023
Overhauled, Control Lever 3040-01-682-0455, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required
Within ___ days after Coast Guard Review/Approval
0024 - 4024
Open, Inspect Oil Cooler, 2930-12-395-6730 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required
5 Calendar days
0025 - 4025
Overhauled Oil Cooler, 2930-12-395-6730, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required
Within ___ days of receipt of GFP.
0026 – 4026
Open, Inspect LOP 8-06 5895-12-395-9484 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Requested
Schedule within ___ Calendar days of final report approval
0027 - 4027
Overhaul LOP 8-06 5895-12-395-9484, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

within ___ days of receipt of order

0028 - 4028
Open, inspect "A1" Turbo, 2950-12-390-3739, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

within ___ days of receipt of order