Attachment 3 - Quoters Proposed Delivery Schedule.doc
DOC document 105 KB Posted
- Attached to
- FRC MTU PARTS AND COMPONENT OVERHAULS
- Solicitation number
- 70Z08027R17004B00
- Issued by
- Not on record
About this file
This is a Quoter's Proposed Delivery Schedule template for turbocharger and engine component overhaul services under solicitation 70Z08027R17004B00. The document outlines delivery timelines that quoters must complete for various Coast Guard vessel engine components, with specific performance requirements referenced to specification P-233-2039. The work involves opening and inspecting components, submitting inspection reports, performing overhauls including labor and parts replacement, and submitting final test reports, with deliverables spanning four contract line items (CLINs) numbered 0001 through 4027 for multiple line options.
The schedule requires quoters to propose completion timeframes for discrete tasks, including approval of test and inspection plans within a specified number of days after contract award; inspection and overhaul work for eight turbochargers (models A1, A2, B1, and B2), a cylinder head, two starters, a coolant pump, sea water pump, intercooler core, control lever, oil cooler, and a low-oil pressure pump. Each inspection phase requires submission within a stated number of days of government-furnished property (GFP) receipt, while overhaul completion must occur within a specified timeframe following Coast Guard review and approval. The template contains blank fields for quoters to insert their proposed delivery days, with one example showing a five-calendar-day timeline for Coast Guard review of the oil cooler inspection report. This delivery schedule serves as a binding pricing and performance document once accepted with an award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FRC MTU Solicitation RFO Part 15.109 Final.pdf | ||
| Attachment 1 - Schedule of Supplies.xlsx | XLSX spreadsheet | |
| Attachment 2- FRC MTU MDE Component Overhaul and Parts SOW P-233-2039_rev 3 (5-7-26).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3
70Z08027R17004B00
QUOTER’S PROPOSED DELIVERY SCHEDULE
| CLIN |
| DESCRIPTION |
| EST. QTY/UNIT |
| WITHIN DAYS AFTER DATE OF CONTRACT |
| 0001 |
| For Approval, Test/Inspections Plan in accordance with specification P-233-2039 |
| 1 |
| Within ___ days after contract award |
0002 - 4002
| Open, inspect "A1" Turbo, 2950-12-390-3739, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0003 - 4003 |
| Overhauled “A1" Turbo, 2950-12-390-3739, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0004 - 4004 |
| Open, inspect "A2" Turbo, 2950-12-390-3213, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0005 - 4005 |
| Overhauled "A2: Turbo, 2950-12-390-3213. including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0006 - 4006 |
| Open, inspect "B1" Turbo, 2950-12-390-3341, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0007 – 4007 |
| Overhauled "B1" Turbo, 2950-12-390-3341, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0008 - 4008 |
| Open, inspect "B2" Turbo, 2950-12-390-5601, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0009 – 4009 |
| Overhauled "B2" Turbo, 2950-12-390-5601, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within __ days after Coast Guard Review/Approval
| 0010 - 4010 |
| Open, Inspect Cylinder Head, 2815-12-401-6623, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0011 - 4011 |
| Overhauled Cylinder Head, 2815-12-401-6623, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0012 - 4012 |
| Open, Inspect Starter, 2920-12-385-6651, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0013 - 4013 |
| Overhauled Starter, 2920-12-385-6651 including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0014 - 4014 |
| Open, Inspect Starter, 2920-12-385-6663, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0015 - 4015 |
| Overhauled Starter, 2920-12-385-6663, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0016 - 4016 |
| Open, Inspect Coolant Pump, 2930-12-408-5714, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0017 - 4017 |
| Overhauled Coolant Pump, 2930-12-408-5714, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0018 - 4018 |
| Open, Inspect Sea Water Pump 4320-12-420-2316 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0019 - 4019 |
| Overhauled Sea Water Pump, 4320-12-420-2316, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0020 - 4020 |
| Open, Inspect Intercooler Core, 2930-12-408-5926, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days of receipt of GFP.
| 0021 - 4021 |
| Overhauled Intercooler Core, 2930-12-408-5926, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
Within ___ days after Coast Guard Review/Approval
| 0022 - 4022 |
| Open, Inspect Control Lever 3040-01-682-0455 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
| Within ___ days after Coast Guard Review/Approval |
| 0023 – 4023 |
| Overhauled, Control Lever 3040-01-682-0455, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
| Within ___ days after Coast Guard Review/Approval |
| CG Review |
| Open, Inspect Oil Cooler, 2930-12-395-6730 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
| 5 Calendar days |
| 0024 - 4024 |
| Overhauled Oil Cooler, 2930-12-395-6730, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
| Within ___ days of receipt of GFP. |
| 0025 – 4025 |
| Open, Inspect LOP 8-06 5895-12-395-9484 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Requested |
| Schedule within ___ Calendar days of final report approval |
| 0026 - 4026 |
| Overhaul LOP 8-06 5895-12-395-9484, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039 |
| As Required |
within ___ days of receipt of order
| 0027 - 4027 |
| Open, inspect "A1" Turbo, 2950-12-390-3739, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039 |
| As Required |
within ___ days of receipt of order
File details come from the government source that posted it. Updated .