Attachment 3 - Quoters Proposed Delivery Schedule.doc

DOC document 105 KB Posted

Attached to
FRC MTU PARTS AND COMPONENT OVERHAULS
Solicitation number
70Z08027R17004B00
Issued by
Not on record

About this file

This is a Quoter's Proposed Delivery Schedule template for turbocharger and engine component overhaul services under solicitation 70Z08027R17004B00. The document outlines delivery timelines that quoters must complete for various Coast Guard vessel engine components, with specific performance requirements referenced to specification P-233-2039. The work involves opening and inspecting components, submitting inspection reports, performing overhauls including labor and parts replacement, and submitting final test reports, with deliverables spanning four contract line items (CLINs) numbered 0001 through 4027 for multiple line options.

The schedule requires quoters to propose completion timeframes for discrete tasks, including approval of test and inspection plans within a specified number of days after contract award; inspection and overhaul work for eight turbochargers (models A1, A2, B1, and B2), a cylinder head, two starters, a coolant pump, sea water pump, intercooler core, control lever, oil cooler, and a low-oil pressure pump. Each inspection phase requires submission within a stated number of days of government-furnished property (GFP) receipt, while overhaul completion must occur within a specified timeframe following Coast Guard review and approval. The template contains blank fields for quoters to insert their proposed delivery days, with one example showing a five-calendar-day timeline for Coast Guard review of the oil cooler inspection report. This delivery schedule serves as a binding pricing and performance document once accepted with an award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

70Z08027R17004B00

QUOTER’S PROPOSED DELIVERY SCHEDULE

CLIN
DESCRIPTION
EST. QTY/UNIT
WITHIN DAYS AFTER DATE OF CONTRACT
0001
For Approval, Test/Inspections Plan in accordance with specification P-233-2039
1
Within ___ days after contract award

0002 - 4002

Open, inspect "A1" Turbo, 2950-12-390-3739, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0003 - 4003
Overhauled “A1" Turbo, 2950-12-390-3739, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0004 - 4004
Open, inspect "A2" Turbo, 2950-12-390-3213, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0005 - 4005
Overhauled "A2: Turbo, 2950-12-390-3213. including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0006 - 4006
Open, inspect "B1" Turbo, 2950-12-390-3341, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0007 – 4007
Overhauled "B1" Turbo, 2950-12-390-3341, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0008 - 4008
Open, inspect "B2" Turbo, 2950-12-390-5601, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0009 – 4009
Overhauled "B2" Turbo, 2950-12-390-5601, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within __ days after Coast Guard Review/Approval

0010 - 4010
Open, Inspect Cylinder Head, 2815-12-401-6623, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0011 - 4011
Overhauled Cylinder Head, 2815-12-401-6623, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0012 - 4012
Open, Inspect Starter, 2920-12-385-6651, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0013 - 4013
Overhauled Starter, 2920-12-385-6651 including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0014 - 4014
Open, Inspect Starter, 2920-12-385-6663, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0015 - 4015
Overhauled Starter, 2920-12-385-6663, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0016 - 4016
Open, Inspect Coolant Pump, 2930-12-408-5714, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0017 - 4017
Overhauled Coolant Pump, 2930-12-408-5714, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0018 - 4018
Open, Inspect Sea Water Pump 4320-12-420-2316 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0019 - 4019
Overhauled Sea Water Pump, 4320-12-420-2316, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0020 - 4020
Open, Inspect Intercooler Core, 2930-12-408-5926, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days of receipt of GFP.

0021 - 4021
Overhauled Intercooler Core, 2930-12-408-5926, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

Within ___ days after Coast Guard Review/Approval

0022 - 4022
Open, Inspect Control Lever 3040-01-682-0455 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required
Within ___ days after Coast Guard Review/Approval
0023 – 4023
Overhauled, Control Lever 3040-01-682-0455, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required
Within ___ days after Coast Guard Review/Approval
CG Review
Open, Inspect Oil Cooler, 2930-12-395-6730 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required
5 Calendar days
0024 - 4024
Overhauled Oil Cooler, 2930-12-395-6730, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required
Within ___ days of receipt of GFP.
0025 – 4025
Open, Inspect LOP 8-06 5895-12-395-9484 & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Requested
Schedule within ___ Calendar days of final report approval
0026 - 4026
Overhaul LOP 8-06 5895-12-395-9484, including labor, mandatory parts, average cost of contingency parts, PPM, shipping & submit Final Test Report per Para. 3.2 & its subparagraphs of specification. P-233-2039
As Required

within ___ days of receipt of order

0027 - 4027
Open, inspect "A1" Turbo, 2950-12-390-3739, & submit an Inspection Report per Para. 3.1 & its subparagraphs of specification. P-233-2039
As Required

within ___ days of receipt of order