Schedule of Prices.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
USCGC ALERT Drydock Repairs FY2026
Solicitation number
70Z08026QMECP0003
Issued by

About this file

This document is a Schedule of Prices for the USCGC ALERT (WMEC-210B) Drydock Availability in FY2026, with solicitation number 70Z08026QMECP0003. The comprehensive pricing schedule details 38 distinct line items for marine vessel maintenance and repair services, including hull plating preservation, underwater testing, propulsion system inspections, shaft alignments, component renewals, and optional work items. The drydock availability is scheduled from February 16th to April 26th, 2026, and is being conducted by the US Coast Guard.

The pricing schedule includes definite and optional work items, with sections for over and above/growth work that allow for potential contract modifications. Specific services range from ultrasonic testing and shaft inspections to propeller system servicing and structural renewals. The document provides a detailed breakdown of potential repair and maintenance activities, with placeholders for unit prices, quantities, and extended pricing. Two contract specialists, Matthew Stansberry and Chelsea Clark from the Department of Homeland Security US Coast Guard, are designated points of contact for this solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC ALERT (WMEC-210B) DRYDOCK AVAILABILITY FY2026
70Z08026QMECP0003
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating, U/W Body, Ultrasonic TestingJOB1$ - 0
D-002U/W Body, Preserve, 100 percentJOB1$ - 0
D-003Hull Plating Freeboard, Preserve, PartialJOB1$ - 0
D-004Appendages (U/W), Preserve (Internal) and Leak TestJOB1$ - 0
D-005Propulsion Shaft Fairwaters And Rope Guards, InspectJOB1$ - 0
D-006Voids (Non-Accessible), Preserve (Internal) and Leak TestJOB1$ - 0
D-007Propulsion Shafting, Strain Gauge Alignment, Drydock, CheckJOB1$ - 0
D-008Propulsion Shafting; Remove, Inspect, and ReinstallJOB1$ - 0
D-009Propulsion Intermediate Shafts; Remove, Inspect, and ReinstallJOB1$ - 0
O-010Propulsion Shaft Coating, Renew (Optional)JOB1$ - 0
O-011Propulsion Shafting, Straighten (Optional)JOB2$ - 0
D-012Propeller Shaft Sleeves, RenewJOB1$ - 0
O-013Propulsion Shafting, Optical or Laser Alignment Check (Optional)JOB1$ - 0
D-014Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or RenewJOB1$ - 0
D-015Propulsion Shaft Bearings, External, RenewJOB1$ - 0
O-016Stern Tube Interior Surfaces, Preserve, 100 Percent (Optional)JOB1$ - 0
D-017Controllable Pitch Propellers, Clean and InspectJOB1$ - 0
D-018Controllable Pitch Propeller (CPP) System, Inspect and ServiceJOB1$ - 0
D-019Fathometer Transducer, RenewJOB1$ - 0
D-020Doppler Speed Log Transducer, Clean and InspectJOB1$ - 0
D-021Sea Valves and Waster Pieces, Overhaul Or RenewJOB1$ - 0
D-022Sea Strainers, Duplex, All Sizes, OverhaulJOB1$ - 0
D-023Rudder Assembly, Remove, Inspect And ReinstallJOB1$ - 0
D-024Superstructure, Preserve, PartialJOB1$ - 0
D-025Cathodic Protection, Zinc Anodes, Renew,JOB1$ - 0
D-026DrydockJOB1$ - 0
D-027Temporary Services, Provide - CutterJOB1$ - 0
D-028Main Reduction Gear (MRG) Ancillary components, RenewJOB1$ - 0
D-029Amory Bilge, PreserveJOB1$ - 0
D-03002 Deck Plating, RenewJOB1$ - 0
D-031Port Air Conditioning Raw Water Piping, RenewalJOB1$ - 0
D-032Reefer Raw Water Piping, RenewJOB1$ - 0
D-033Starboard Boat Deck Bulkhead Plating, RenewalJOB1$ - 0
D-034Main Drainage Piping, RenewJOB1$ - 0
D-035Hull and Structural Plating, RenewJOB1$ - 0
O-036Controllable Pitch Propeller (CPP) Hub, Renew (Optional)JOB2$ - 0
O-037Controllable Pitch Propeller (CPP) Hub, Inspect (Optional)JOB2$ - 0
D-038Accessible Void(s), Preserve, PartialJOB1$ - 0
O-00AComposite Labor RateHour1$ - 0
D-00BGFP Report$ - 0
D-00CTravel and Perdiem$ - 0
O-00ZLaydays$ - 0
Total Price of Definite Items$ - 0
Total Price of Option Items$ - 0
Total Price of Definite and Optional Items$ - 0
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour4,204$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$162,152.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00

(5/14/2025)_x000D_ Draft-1 - Page &P of &N

File details come from the government source that posted it. Updated .