BaileyBarco_Answer.pdf

PDF 44 KB Posted

Attached to
DRYDOCK: USCGC BAILEY BARCO DD FY25
Solicitation number
70Z08025QPBPL0012
Issued by

About this file

This document is a Questions and Answers (Q&A) file related to the USCGC BAILEY BARCO dry dock maintenance contract. The specific Q&A addresses a technical drawing issue for Work Item 14 concerning the Stern Launch Door Inspection and Preservation. The contractor (KTR) noted that the originally provided drawing only listed part numbers (PNs) up to 54, while paragraph 3.2.7.1 referenced PNs 73 and 74. The government response directs the contractor to use drawing 154 WPC 169-201, Revision C, which will contain the complete referenced parts in paragraph 3.2.7.1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: Work Item 14 Stern Launch Door, Inspect and Preserve, para 3.2.7.1 identifies PNs 73 and 74 in DWG 154B WPC 169-201. The drawing provided to KTR only lists PNs up to 54. Will USG provide complete materials list or correct drawing?

Answer: The correct drawing to use is 154 WPC 169-201, Rev C. Paragraph 3.2.7.1 will have the parts referenced.