AutoRecovery save of 70Z08023QPBPL0020_HH_Amendment 00002.pdf

PDF 194 KB Posted

Attached to
HERIBERTO HERNANDEZ DD FY24
Solicitation number
70Z08023QPBPL0020
Issued by

About this file

This amendment modifies a solicitation for inspection and preservation services aboard the USCGC Heriberto Hernandez. The Coast Guard seeks clarification on whether cleaning is required for certain fuel oil storage tanks listed for inspection in the performance work statement. The amendment provides confirmation that additional work beyond inspection would require separate authorization in the form of a certified class representative request and certified class representative approval. No other changes are made to the terms of the solicitation.

View the file

Other files

File Type Posted
DWG-154-WPC_436_301_1_-_C.pdf PDF
70Z08023QPBPL0020_HH_Amendment 00001 signed.pdf PDF
DWG 154-WPC_256_201_1_-_C.pdf PDF
HERIBERTO HERNANDEZ DD Combined Synopsis_Solicitation.pdf PDF
SOS_Blank.xlsx XLSX spreadsheet
Specification.pdf PDF
HHernandez_Foreseeable Cost.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4 REQUISITION/PURCHASE REQ NO. PROJECT NO. (If applicable) A00002 10/10/2023 N/A

6. ISSUED BY Code 7. ADMINISTERED BY (If other than item 6.) Code N/A Commanding Officer USCG Surface Forces Logistics Center 300 East Main Street Norfolk, VA 23510

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

70Z08023QPBPL0020

9B. DATED (SEE ITEM 11)

09/19/2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers ____ is extended __X__ is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER: (specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

USCGC HERIBERTO HERNANDEZ (WPC-1114) DD FY24

1. The purpose of this amendment is to answer vendors’ questions from the solicitation.

2. The questions are attached on page 2.

3. Other terms and conditions remain unchanged.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) Contracting Officer 15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)

PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (49 CFR) 53.243

70Z08023QPBPL0020

Amendment 00002

Question:

WI 2 Tanks and Voids, Inspect and Preserve

The Answer says: No. The tanks listed in the Note ( (Fuel Oil Storage 1 3-11-0-F, Fuel Oil Service 1P 3-17-2-F, Fuel Oil Service 1S 3-17-1-F, Fuel Oil Storage 2 3-23-0-F) are on the LIST to be gas freed, cleaned and inspected.

My question: Those tanks are in the LIST only for INSPECTION. That’s the reason I asked if the cleaning of those tanks is required, it should be a CR after inspection. Please, clarify.

Answer:

Correct. Tanks that require any work other then what is listed in Table 1, will require a CFR and CR before any additional work can be completed.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

2023-10-10T09:41:03-0400
GAVALIAN.ALISSA.GRETA.1299855070

File details come from the government source that posted it. Updated .