Dolphin FY-20 DS Questions & Answers.pdf
PDF 125 KB Posted
- Attached to
- Dockside Repair of USCGC Dolphin
- Solicitation number
- 70Z08020QP4525000
About this file
This document contains questions and answers regarding a solicitation for dockside repair of the USCGC Dolphin. The solicitation seeks cleaning and inspection of grey water, sewage, and other holding tanks, as well as maintenance of MDE W-5 equipment. Repairs to watertight closures are also required. The Coast Guard will observe repair tasks but not perform contract work. Chemical waste must be removed by the contractor, while water and sewage can be pumped to shore connections when tests indicate no hazards remain. Separate restroom facilities for crew need not be provided. Doors will arrive unpainted for the Coast Guard to paint. Moving an HVAC control panel is possible if unbolted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08020QP4525000 A00004.pdf | ||
| Dolphin FY-20 DS Questions & Answers (2).pdf | ||
| 70Z08020QP4525000 A00003.pdf | ||
| 70Z08020QP4525000 A00002 signed.pdf | ||
| DOLPHIN FY20 DS Repairs – Price Schedule Rev 1.xls | XLS spreadsheet | |
| 70Z08020QP4525000 A00001 Signed.pdf | ||
| Dolphin FY-20 Dockside Combined Synopsis.pdf | ||
| DOLPHIN FY20 DS Repairs – Price Schedule.xls | XLS spreadsheet | |
| Solicitation Dolphin SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CUTTER & HULL Number: ___USCGC Dolphin (WPB-87354)
RFQ Number: 70Z080-20-Q-4525000
SOLICITATION SECTION: PARA NO.
DEFINITE/OPTIONAL ITEM NO. Work Item 002 PARA NO. 3.3
TITLE:
Grey Water Holding Tank; Clean and Inspect
1. QUESTION: When grey water is disrupted can Ship’s Force use the BEQ on base vs. KTR provided shower facility?
ANSWER: No shower facilities will be required but a Porta Potty will be needed during any water disruption.
DEFINITE/OPTIONAL ITEM NO. Work Item 002 PARA NO. 3.8.3
Grey Water Holding Tank; Clean and Inspect
2. QUESTION: Will tanks be pumped to KTR provided tank or shore CHT/Grey Water connection?
ANSWER: Any chemical used in the cleaning of the tank or piping must be pumped out or removed to contractor supplied tanks for disposal by contractor. By the time the referenced paragraph gets done all hazardous waste should have been removed and tests should be done with just water. If only water or grey water are present then tanks can then be pumped to shore tie connection.
DEFINITE/OPTIONAL ITEM NO. Work Item 003 PARA NO. 3.6.3
Sewage Holding Tank; Clean and Inspect
3. QUESTION: Please advise if male and female personnel are onboard for provision of shore side temporary restroom and shower facilities.
ANSWER: Separate facilities won’t be necessary and showers won’t be necessary as answered in question 001.
DEFINITE/OPTIONAL ITEM NO. Work Item 003 PARA NO. 3.6.3
Sewage Holding Tank; Clean and Inspect
4. QUESTION: Will tanks be pumped to KTR provided tank or shore CHT/Grey Water connection?
ANSWER: Any chemical used in the cleaning of the tank or piping must be pumped out or removed to contractor supplied tanks for disposal by contractor. By the time the referenced paragraph gets done all hazardous waste should have been removed and tests should be done with just water. If only water, grey water, or sewage are present then tanks can then be pumped to shore tie connection.
DEFINITE/OPTIONAL ITEM NO. Work Item 001 PARA NO. 3.1.2
MDE W-5 Maintenance
5. QUESTION: Will Ship’s Force assist the Tech Rep with the required installation and repairs?
ANSWER: This paragraph sums up the CG’s role during this work item.
3.1.6 Training. Allow Coast Guard personnel to observe all diagnostic and repair tasks; advise ship’s force on proper operation and maintenance of the equipment in the normal course of performing disassembly, reassembly, and repairs. Coast Guard personnel may be allowed to perform minor tasks, at the discretion of the Contractor, if those tasks will assist in training and in no way compromise schedule. Coast Guard personnel will NOT be utilized to complete contract obligations; the Contractor shall supply adequate labor to complete the contract within the performance period without Coast Guard supplied labor.
DEFINITE/OPTIONAL ITEM NO. Work Item 001 PARA NO. 3.2.1
MDE W-5 Maintenance
6. QUESTION: Will the Engine Condition Pre-Check underway period take place on the first day of the availability and how long is the underway period anticipated to last?
ANSWER: The precheck is typically done the first day but that would be up to the contractor’s schedule.
Likewise the duration would be up to the sub conducting the work.
DEFINITE/OPTIONAL ITEM NO. Work Item 008 PARA NO. 1.2
Watertight Closure; renew
7. QUESTION: Do GFM door panels come preserved or must they be preserved by the KTR upon receipt?
ANSWER: Doors will arrive unpainted. Ship’s force will paint.
DEFINITE/OPTIONAL ITEM NO. Work Item 008 PARA NO. 3.1.4
Watertight Closure; renew
8. QUESTION: Can the HVAC control panel be unbolted from its foundation and suspended with a beam clamp from the overhead when replacing WTD1-15-0?
ANSWER: Moving the controller isn’t typically needed however if required it has about 8 inches of possible play if unbolted.