Attachment_3_Injector_Overhaul_SOW-_continued.pdf

PDF 124 KB Posted

Attached to
Overhaul of Fuel Pumps/Injectors
Solicitation number
70Z0801914004B00
Issued by

About this file

Injector SOW

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NAME INJECTOR ASSEMBLY,FUEL

STOCK NUMBER

PART NUMBER

USED ON

2910-99-891-9977

OD29707

110 WPB VESSELS

SHELF LIFE CD 0

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the

Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

OVERHAUL DESCRIPTION

ITEM NAME: INJECTOR ASSEMBLY, FUEL

STOCK NO.: 2910-99-891-9977

PART NUMBER: OD29707

USED ON: 110' WPB "A" AND "B" CLASS VESSELS

Assembly as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard

Contracting Officer.

PRELIMINARY INSPECTION REQUIREMENTS:

The Injector Assemblies shall be inspected in order to determine the extent of the required repairs. An estimate shall be provided to the Coast Guard

Contracting Officer, which shall include: New parts required with prices, labor rate, labor hours required and a total estimate for all required services including repair or replacement of packaging and packing. The serial number for each Pump, Fuel Metering and Distribution shall be included in the inspection report.

OVERHAUL REQUIREMENTS:

The Injector Assemblies shall be overhauled to a condition, which shall restore the operating and performance characteristics to the "original" design and technical specifications. Following completion of overhaul, the

Contractor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy of each certification shall be forwarded to the Coast Guard Contracting Officer.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government Representative.

Acceptance will be contingent upon the Representative's verification of no damage in transit, correctness and completeness of order and contractors’ conformance to preservation, packaging, packing, marking and bar-coding requirements.

FOR OFFICIAL USE ONLY

PERSERVATION:

Each Injector Assembly shall be preserved and packaged for protection against deterioration for a period of up to two years.

PACKAGING, PACKING AND MARKING FOR SHIPMENT:

Each Injector Assembly shall be packaged individually in a heavy cardboard box, which shall be capable of providing adequate protection during long term warehouse storage and multiple commercial shipments. The contents shall be packed to prevent movement.

WARRANTY:

A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for

90 days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

X

File details come from the government source that posted it.