Attachment_2_Fuel_Pump_Overhaul_SOW.pdf
PDF 120 KB Posted
- Attached to
- Overhaul of Fuel Pumps/Injectors
- Solicitation number
- 70Z0801914004B00
About this file
Fuel Pump SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_3_Injector_Overhaul_SOW-_continued.pdf | ||
| ATTACHMENT_4_PACKAGING_SP-PPM-001.pdf | ||
| Attachment_1_-_CLINS_Pricing_-_70Z08019Q14004B00.xlsx | XLSX spreadsheet | |
| RFQ_70Z08019Q14004B00_-_Fuel_Pumps_and_Injectors.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOR OFFICIAL USE ONLY
PUMP OVERHAUL DESCRIPTION
ITEM NAME PUMP,FUEL,METERINGAND DISTRIBUTING
STOCK NUMBER
PART NUMBER
USED ON
2910-99-735-6301 SHELF LIFE CD
OD30539
110' WPB "A" AND "B" CLASS VESSELS
Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.
OVERHAUL REQUIREMENTS:
OVERHAUL DESCRIPTION
ITEM NAME: PUMP, FUEL, METERING AND DISTRIBUTION
STOCK NO.: 2910-99-735-6301
PART NUMBER: OD30539
USED ON: 110' WPB "A" AND "B" CLASS VESSELS
Assembly as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard
Contracting Officer.
PRELIMINARY INSPECTION REQUIREMENTS:
The Pump, Fuel Metering and Distribution shall be inspected in order to determine the extent of the required repairs. An estimate shall be provided to the Coast Guard Contracting Officer, which shall include: New parts required with prices, labor rate, labor hours required and a total estimate for all required services including repair or replacement of packaging and packing. The serial number for each Pump, Fuel Metering and Distribution shall be included in the inspection report.
OVERHAUL REQUIREMENTS:
The Pump, Fuel Metering and Distribution shall be overhauled to a condition, which shall restore the operating and performance characteristics to the
"original" design and technical specifications. Following completion of overhaul, the Contractor shall perform standard production tests and inspections to assure maximum design performance. The Contractor shall provide certifications of successful standard production tests and inspections. One certification shall be placed in the box with each unit and a copy of each certification shall be forwarded to the Coast Guard
Contracting Officer.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government Representative.
Acceptance will be contingent upon the Representative's verification of no damage in transit, correctness and completeness of order and contractors’
FOR OFFICIAL USE ONLY
conformance to preservation, packaging, packing, marking and bar-coding requirements.
PERSERVATION:
Each PUMP, FUEL, METERING AND DISTRIBUTION shall be preserved and packaged for protection against deterioration for a period of up to two years.
PACKAGING, PACKING AND MARKING FOR SHIPMENT:
Each PUMP, FUEL, METERING AND DISTRIBUTION shall be packaged individually in a wooden box, which shall be capable of providing adequate protection during long term warehouse storage and multiple commercial shipments. The contents shall be packed to prevent movement.
WARRANTY:
A. Standard Manufacturer's Warranty
B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION. Contractor must guarantee item against defects that lead to failure for 90 days after installation for a period of up to two (2) years after delivery to Coast
Guard.
GOVERNMENT ACCEPTANCE:
Acceptance will be made at destination by a Government representative.
Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.