This is Amendment A00001 to a Coast Guard solicitation for tank and bilge cleaning services on USCG vessels. The amendment addresses three clarifying questions and answers regarding operational procedures for the contract work to be performed at the U.S. Coast Guard Yard, 2401 Hawkins Point Road, Baltimore, MD 21226.

The amendment clarifies three key operational requirements: (1) the Coast Guard will not provide a frac tank for offloading, and vessels must be offloaded directly to vacuum trucks in a continuous cycle; (2) the Contractor is responsible for containing and disposing of all water removed during barnacle cleaning off-site, as water cannot enter drains or the water system surrounding the CG Yard; and (3) historical bilge water samples from previous vessel services did not contain PCBs. These clarifications establish contractor responsibilities for waste management and set expectations regarding environmental contamination concerns for the bidding period.

View the file

Other files

File Type Posted
A00002 Page 1.pdf PDF
A00002 Page 2.docx DOCX document
A00001 Page 1.pdf PDF
Price Schedule.xlsx XLSX spreadsheet
YARD SPCC Plan_Update_FINAL_2020_Final-Complete_pdf.pdf PDF
USCG_YARD_SWPPP_April2024_20SW.pdf PDF
SOW - Tank and Bilge.docx DOCX document
SFLC-Std-Spec-0000-(2022).pdf PDF
EMS MANUAL _ 2024 _ FINAL_8.16.24.docx DOCX document
Tank Bilge Solicitation - Final.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

70Z04026Q62103Y00 Amendment A00001

14a. This amendment is issued to respond to the following questions received:

QUESTION: Will the Coast Guard be providing a frac tank to offload on a schedule timeframe or will ship have to be offloaded directly to vac truck in a continuous cycle?

ANSWER: The CG Yard will not provide a frac tank to offload.

QUESTION: When removing barnacles from the dry dock, water reclaim is mandatory. I would like to know who will be responsible for reclaiming and transporting the water offsite, or if it will be filtered through the dry dock system and then pumped back into the bay?

ANSWER: The Contractor is required to contain and dispose of any water off site. Water cannot enter drains or the water system surrounding the CG Yard.

QUESTION: In the past, were PCB’s present in the bilge water?

ANSWER: No, PCBs were not present.

(END OF AMENDMENT A00001)