SOW - ADA door.docx
DOCX document 33 KB Posted
- Attached to
- Service ADA Door
- Solicitation number
- 70Z03926QCGA00022
About this file
This is a Statement of Work (SOW) for servicing an ADA-compliant automatic door operator at Leamy Hall, Coast Guard Academy, New London, Connecticut. The contractor must furnish all labor, materials, equipment, and transportation to remove the existing door operator and related components, dispose of removed materials in compliance with applicable regulations, and furnish and install a new heavy-duty automatic door operator rated for high-traffic commercial use. All work must be performed by Connecticut-licensed contractor personnel between 7:30 a.m. and 4:00 p.m., Monday through Friday, excluding federal holidays, with advance approval required for work outside these hours.
The scope includes installing mounting brackets, arms, hardware, and electrical connections; reusing existing components only if serviceable and compatible; reconnecting activation switches, push plates, sensors, and safety devices; and adjusting opening and closing speeds, hold-open times, and operating forces to meet ADA requirements and manufacturer specifications. The contractor must verify proper grounding and electrical code compliance, conduct multiple opening and closing cycle tests, confirm all control devices function properly, and demonstrate fully functional ADA-compliant door operation to the government representative before final acceptance. All work is subject to inspection and acceptance by the Contracting Officer or Technical Advisor (Jed Couture, (571) 607-3072). The government provides electricity (120vac @ 20 amps) and water at no cost; the contractor is responsible for all additional utilities and must clean the work area and remove all debris daily. Bidders are required to conduct a site visit to familiarize themselves with existing conditions before submitting proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z03926QCGA00022 Service ADA Door Questions and Answers.docx | DOCX document | |
| UPDATED VERSION OF_SOW - ADA door.docx | DOCX document | |
| UPDATED VERSION OF_Combined Synopsis Solicitation_ADA DOOR.docx | DOCX document | |
| Combined Synopsis Solicitation_ADA DOOR.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work United States Coast Guard Academy New London, Connecticut Service ADA Door at Leamy Hall
Part 1 – GENERAL
1.1 Project Description:
The contractor shall furnish all labor, material, equipment, and transportation, to service ADA door at Leamy Hall, Coast Guard Academy, New London, Connecticut.
1.2 Contractor Qualifications and Personnel Requirements:
The contractor and contractor personnel performing work under this contractor shall be licensed by the State of Connecticut. The contractor shall provide a primary point of contact to include a phone number and email address.
1.3 Technical Advisor:
All work performed by the contractor is subject to inspection and acceptance by the Contracting Officer or the Technical Advisor during and after the completion of each visit. Unsatisfactory work shall be corrected at no additional cost to the government. The Technical Advisor for site visits and technical support is Jed Couture who may be reached at (571) 607-3072 (office) or at Jed.A.Couture@uscg.mil. TA are not authorized to issue changes to the contractor or resolve contractual disputes.
Location of Work:
All work shall be performed at the Coast Guard Academy, 15 Mohegan Dr, New London, CT 06320.
1.4 Site Visit:
Bidders are required to visit the site to become familiar with existing conditions. Bidders shall contact the primary TA to schedule a site visit.
1.5 Hours of Work:
All work shall be performed between the hours of 7:30 a.m. and 4:00 p.m. local time, Monday through Friday excluding Federal Holidays. Should the contractor desire to work outside these hours, the contractor shall submit a request to the primary TA no less than 48 hours in advance.
1.6 Scheduling of Work:
The contractor shall schedule all work with the TA.
1.7 Contractor’s Use of Premises:
The contractor will be working within an operational Coast Guard military installation. The contractor shall perform and conduct all work to minimize interference with Coast Guard operations.
1.8 Parking:
The contractor is authorized parking during the performance of work. Overnight parking is not authorized. Parking arrangements shall be made through the TA.
1.9 Inspection and Acceptance of Work:
The contractor shall keep the TA fully informed of contract operations throughout the performance of work. The contractor shall notify the TA upon completion of work. The contractor and TA shall perform a joint final inspection and the contractor shall correct any noted deficiencies.
1.10 Government Furnished Utilities:
The government will furnish electricity (120vac @ 20 amps), and water from existing building services will be provided at no cost to the contractor. Additional hookups or temporary connections shall be the responsibility of the contractor and shall be removed by the contractor upon completion of work.
1.11 Storage Facilities:
The government will not provide storage facilities.
1.12 Site Clean Up:
Upon completion of daily work, the contractor shall remove and properly dispose of site debris and rubbish. Contractor equipment shall be removed from Coast Guard Academy premises unless otherwise authorized by the TA.
1.13 Disposal of Removed Materials:
All materials and equipment removed by the contractor shall become the property of the contractor and shall be disposed of offsite in accordance with all applicable federal, state and local laws and regulations. Under no circumstances shall materials be placed in government-owned or leased refuse containers.
1.14 Smoking:
The contractor shall strictly adhere to the Coast Guard Academy’s smoking policy which limits smoking to 4 designated locations. The TA will provide smoking area locations upon request.
Part 2 – SCOPE OF WORK
2.1 General:
The work associated with this contract includes servicing an interior ADA door located at Leamy Hall.
| o | Disconnect electrical power to the operator. |
| o | Remove existing ADA door operator, mounting hardware, control switches, sensors, and associated components as required. |
| o | Dispose of removed materials in accordance with applicable regulations. |
| o | Furnish and install a new heavy-duty automatic door operator rated for high-traffic commercial use. |
| o | Install all required mounting brackets, arms, hardware, and electrical connections. |
| o | Reuse existing components only if determined serviceable and compatible. |
| o | Install and/or reconnect activation switches, push plates, sensors, and safety devices. |
| o | Adjust opening and closing speeds, hold-open times, and operating forces to meet ADA requirements and manufacturer specifications. |
| o | Ensure door operation does not create safety hazards for occupants. |
| o | Provide all necessary electrical connections, wiring modifications, and low-voltage control wiring required for proper operation. |
| o | Verify proper grounding and compliance with applicable electrical codes. |
| o | Test operator through multiple opening and closing cycles. |
| o | Verify proper activation from all control devices. |
| o | Confirm smooth operation, full opening width, safety sensor function, and automatic closing operation. |
| o | Adjust settings as necessary to achieve reliable performance. |
| o | Clean work area and remove all debris. |
| o | Demonstrate fully functional ADA-compliant door operation to the Government representative. |
| o | Correct any deficiencies identified during final inspection prior to acceptance. |
File details come from the government source that posted it. Updated .