Q&A.doc

DOC document 26 KB Posted

Attached to
Repair/Overhaul of H-65 Landing Gear
Solicitation number
70Z03818QB2000015
Issued by

About this file

Q&A 70Z03818QB2000015

View the file

Other files

File Type Posted
70Z03818QB2000015_-_SOW.docx DOCX document
70Z03818QB2000015_-_Requirements_amendment.xlsx XLSX spreadsheet
70Z03818QB2000015_-_Requirements.xlsx XLSX spreadsheet
Terms_and_Conditions_-_70Z03818QB2000015.docx DOCX document
70Z03818QB2000015_-_SOW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A – 70Z03818QB20000015

1. Can you please confirm the Firm Fixed Price shall include only systematic parts (we can provide a list of those in our reply to the Solicitation) and that parts replaced on attrition shall be quoted separately (i.e. not included in Firm Fixed Price)?

Answer: Section 5.2 of the Statement of Work (SOW) has been amended

2. Is it possible to incorporate the minor and major repair work scopes into the RFP, thus limiting the costs to the USCG?

Answer: We will not be splitting this between minor and major repairs. Now that the SOW has been amended, this should not be an issue.

3. Can you please confirm the expected ARM for Test, Repair or Overhaul?

Answer: The requested delivery date is 30 days. Please quote your desired lead time. Be sure to include the lead time on the Requirements’ Spreadsheet for all three (3) scenarios, 1 – repair, 2 – NFF, and 3 – overhaul

4. The P/N for the LH Piston Tube Assembly in the Requirements spreadsheet is incorrect, it should be 18991-000-02 according to the CMM/SOW.

Answer: Part number has been corrected. Please see the amended requirements page.