Statement of Work.pdf
PDF 529 KB Posted
- Solicitation number
- 70Z03526QKETC001
About this file
This is a Statement of Work (SOW) for annual inspection and testing of lifting equipment at USCG Base Ketchikan in Southeast Alaska. The contractor must inspect, functionally test, and certify 15 pieces of weight handling equipment including automotive lifts, bridge cranes, mobile cranes, mobile A-frames, and monorail hoists from various manufacturers such as Versymmetric, Assured/Shaw Box, Budgit, Harrington, Grove, and Coffing. All work must comply with manufacturer specifications and applicable OSHA regulations (29 CFR Parts 1910, 1915, 1926), as well as USACE Safety and Health Requirements Manual EM 385-1-1.
The contractor must provide all personnel, labor, materials, equipment, tools, supervision, and transportation, with the contract price being all-inclusive of travel, lodging, and per diem. Deliverables include physical certification tags (durable, waterproof material with load rating and inspection date) affixed to compliant equipment, individual inspection forms for each device, and a comprehensive deficiency report submitted within five business days documenting all equipment inspected, inspection methods used, identified deficiencies or code violations, and recommended corrective actions. The Grove RT770 mobile crane must be inspected by an OSHA-defined competent person. The base contract year runs from August 16, 2026, with all work and reporting completed within 45 calendar days; four additional one-year option periods follow the same 45-day completion timeline if exercised. Work hours are 0730–1700 AKST Monday–Thursday and 0730–1500 AKST Friday, excluding Federal holidays. The government furnishes facility access, equipment, and test weights; the contractor bears all other costs. Final acceptance requires 100% of equipment to be either certified compliant or thoroughly documented with deficiency reports.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Heights and recommnded access strategies.docx | DOCX document | |
| Changes.txt | TXT text file | |
| Provisions and Clauses.pdf | ||
| Crane and hoist Annuals Statement of Work (SOW).docx | DOCX document | |
| Ketchikan Wage Determination 88-0162.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
Inspection and Testing of Lifting Equipment
At USCG Base Ketchikan
1.0 GENERAL
1.1 Background: United States Coast Guard (USCG) Base Ketchikan operates a wide range of weight handling equipment (WHE) to support its operational missions. To ensure the safety of personnel and the continued functionality of this equipment, annual inspection, testing, and certification are required in accordance with federal regulations and manufacturer standards.
USCG Base Ketchikan is located on a remote island in Southeast Alaska.
1.2 Scope
The Contractor shall provide all personnel, labor, materials, equipment, tools, supervision, and transportation necessary to perform annual inspections, functional testing, and certification of the cranes, hoists, and lifting devices listed in Section 2.4. This contract requires the contractor to affix certification tags to compliant equipment and provide comprehensive reports detailing all findings. The contract price shall be all-inclusive of any travel, lodging, and per diem required to perform the work at USCG Base Ketchikan. This SOW does not include any repair or troubleshooting services for identified deficiencies.
1.3 Objective
The objective of this contract is to have a qualified contractor inspect and recertify all weight handling equipment listed herein and to provide detailed documentation of any deficiencies found during the inspection to support future corrective actions by the Government.
1.4 Compliance Documents
Manufacturer Specifications
29 CFR Part 1910 (General Industry Standards)
29 CFR 1910.179 (Overhead and Gantry Cranes)
29 CFR Part 1915 (Shipyard Employment)
29 CFR Part 1926 (Construction Standards)
EM 385-1-1 (USACE Safety and Health Requirements Manual)
2.0 SPECIFIC REQUIREMENTS/TASKS
2.1 Inspection and Testing: The Contractor must inspect and functionally test each piece of equipment listed in the table at Section 2.4 in accordance with the compliance documents listed in Section 1.4.
o 2.1.1 Mobile Crane Inspection: The Grove RT770 mobile crane (model CRR70K) shall be inspected by a "competent person" as defined by OSHA in 29 CFR 1926.32(f).
2.3 Certification and Reporting (Deliverables):
o 2.3.1 Physical Certification Tags: For each piece of equipment that passes inspection, the Contractor must affix a Certificate of Compliance tag in a clearly visible location. The tag must be made of durable, tear-resistant, and waterproof material (e.g., 10-15 mil poly-based plastic or vinyl) and must show the load rating, inspection date, and the inspector’s credentials.
o 2.3.2 Individual Inspection Forms: The Contractor must provide a completed and signed inspection form, which may be a standard commercial format, for each individual device inspected.
o 2.3.3 Final Deficiency Report: Within five (5) business days of completing the onsite inspection, the Contractor must submit a consolidated written report to the Points of Contact listed in Section 7.0. This report must include, at a minimum:
A list of all equipment inspected by make, model, serial number, and capacity.
A summary of devices tested, and the inspection methods used.
A detailed list of any identified deficiencies or code violations.
Recommended corrective actions for each deficiency.
o 2.3.4 Report Format: All written reports must be submitted electronically in a Microsoft Office-compatible format (e.g., .docx, .xlsx, or .pdf).
2.4 Equipment List:
Description Make Model Serial Number ID Number
Automotive Lift (10k)
Versymmetric CL10V3 190700000267686 No. 2 Post
Bridge Crane Assured/Shaw Box
73L20027D14 23670/01H01707 Buoy Shed
Bridge Crane Budgit 309827-32 C-205-1 M-5
Mobile A-Frame Harrington/Bear Claw
CF4-0757 E072063 A-Frame
Mobile Crane Grove CRR70K
(RT770)
237311
Monorail Hoist Budgit BEH0310 330621 Boat Shed
Monorail Hoist Coffing JLC2016BLCX JM3160PU C-1
Monorail Hoist Coffing EC-1009-5 EC-1C-401-VL E-1
Monorail Hoist Budgit 309827-29 H-224-1 M-2
Monorail Hoist Coffing/Yale EC-2012-1-10 471 M-3
Monorail Hoist Coffing EC-2016-1 EC-1C-412-XLD M-4
Monorail Hoist Coffing EC-1016-3 EC1-A-417-KZD M-6
Monorail Hoist Coffing ECT-4006 EC1G6396 M-7
Note: The Government may add or remove equipment from this list during the option periods via a bilateral contract modification.
2.5 Handling of Critical Deficiencies: If a critical deficiency is found that prevents the safe completion of testing on a piece of equipment, the Contractor must immediately stop working on that item, notify the Technical Point of Contact (POC), and document the reason for the work stoppage in the final report. The Contractor's responsibility is strictly to inspect and report; no troubleshooting or repair action is authorized under this SOW.
2.6 Qualified Personnel: All services must be performed by qualified and certified personnel who meet all applicable OSHA requirements and are trained and experienced in the inspection of lifting equipment. The Contractor shall be prepared to provide proof of qualifications upon request by the Government.
2.7 Cleanup: The Contractor must remove and dispose of all debris, if any, resulting from its inspection and testing activities, leaving the worksite clean.
3.0 PERSONNEL AND CONDUCT
3.1 Employee Conduct
The Contractor’s personnel must comply with all applicable USCG Base Ketchikan regulations, policies, and procedures, including those concerning safety, security, and environmental protection. Personnel must present a professional appearance at all times. The wearing of DHS or USCG insignia on clothing or equipment is prohibited. No weapons are permitted on site.
3.2 Removal of Personnel
The Government may, at the sole discretion of the Contracting Officer, direct the Contractor to remove any employee from the worksite for reasons of misconduct or security violations. Such removal does not relieve the Contractor of its responsibility to continue performance of the required services.
4.0 OTHER APPLICABLE CONDITIONS
4.1 Period of Performance: The contract will consist of a Base Year and four (4) subsequent one-year Option Periods.
o Base Year: Performance must commence on or before August 16, 2026. All work in the Base Year, including the submission of all reports, must be completed within 45 calendar days from the performance start date.
o Option Periods: If and only after exercised, the work for each option period must be completed within 45 calendar days during that period, at a time to be mutually agreed upon by the Contractor and the Technical POC but no later than 16 August.
4.2 Place of Performance: All work shall be performed at:
USCG Base Ketchikan 1300 Stedman Street Ketchikan, AK 99901
4.3 Hours of Operation: The Contractor’s employees must perform all work between the hours of 0730 and 1700 AKST, Monday through Thursday, and 0730 and 1500 AKST on Friday, excluding Federal holidays.
5.0 GOVERNMENT-FURNISHED RESOURCES
The Government will provide the following:
o Access to the facility and all equipment listed in Section 2.4.
o The use of Government-owned test weights and associated rigging.
6.0 CONTRACTOR-FURNISHED RESOURCES
The Contractor shall furnish all facilities, materials, tools, labor, supervision, and transportation necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
7.0 INSPECTION AND ACCEPTANCE
7.1 Inspection: The Technical POC will monitor all work to ensure compliance with the terms of this SOW.
7.2 Acceptance: Final acceptance for the period of performance shall be granted by the Contracting Officer or designated Technical POC. Acceptance will occur only after verification that 100% of the equipment on the list has either been certified as compliant with an affixed tag, or, if non-compliant, is documented with a thorough deficiency report and recommended corrective actions as required by Section 2.3.
8.0 POINTS OF CONTACT
Contracting Officer:
o Name: Benjamin R. Reedy, CWO, USCG o Email: Benjamin.R.Reedy@uscg.mil
Technical Point of Contact (TPOC) / Contracting Officer’s Representative (COR):
o Name: Russell Dever, CWO, USCG o Email: Russell.M.Dever@uscg.mil o Phone: (907) 228-6408