Scope of Work Temporary Facilities Berthing Trailer for Coast Guard Cutter KANAWHA
| I. | General |
| a. | This scope of work is to provide all material, labor, and equipment for the installation of temporary living facilities at Pine Bluff, AR NTE 12 months or as many months as per PR obligation. |
| b. | Location of Work: |
USCGC KANAWHA
4101 Port Road Pine Bluff, AR 71611-7627 POC: MKC Jared Landheer (504) 481-3829
| II. | Description of Work: |
| a. | Base Bid Items |
| i. | Provide cost to provide and install a prefabricated trailer or a modular complex to meet the following requirements: |
| 1. | Sleeping quarters for 6 personnel. Personnel can be assigned up to 2 members per one room. Sleeping trailers require blinds/shades on all windows for privacy, at least 2 exits with appropriate exit lighting/signage and 1 ABC type fire extinguishers. Sleeping quarters shall be able to be furnished with twin sized beds (6), mattresses (6) and lockers (6). Government will provide furniture and bedding. |
| 2. | Kitchen that includes at a minimum, sink, range, oven, hood exhaust, countertop, cabinets and refrigerator. Space should be capable of serving and seating 6 meals per meal time and shall meet Coast Guard Health and safety requirements of a dishwasher. |
| 3. | Provide attachments for install of 1 washer and 1 dryer. Government will provide washer and dryer. |
| 4. | A minimum of 2 toilets and 2 showers. |
| 5. | Provide exterior stairs to enter/exit facilities. |
| 6. | Connect trailers to existing water, sewer, and power to include any necessary site work. Contractor shall field verify all connections and make required connections. |
| ii. | In the event of a flood event, the Contractor will be responsible for moving or securing trailers. Contractor shall provide a minimum of 48 hrs notice to the Cutter POC and Contracting Officer. |
| iii. | Trailer location shall be in the parking lot south east of the facility Trailers must not exceed a 100 x 20 footprint within the parking area. |
| b. | Unit Price Items: |
| i. | Provide pricing of monthly lease of trailers. Anticipate lease term of one year but allow for greater or shorter term. |
| ii. | Provide pricing for installation and removal of trailers, to include hooking up of utilities (plumbing and electrical). |