23-0041 SOW.pdf
PDF 101 KB Posted
- Attached to
- AUDIO VISUAL CONFERENCE ROOM EQUIPMENT, SEC ST. PETE Federal contract opportunity
- Solicitation number
- 70Z02823Q3713041
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 23-0041 ELECTRONIC EQUIPMENT PICTURE.pdf | ||
| 23-0041 CAMERA PICTURE.pdf | ||
| 23-0041 Item Peculiar To One Manufacturer.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
U.S. Coast Guard Sector St. Petersburg
600 8th Ave SE
St. Petersburg, FL 33701
STATEMENT OF WORK FOR THE
INSTALL VIDEO CONFERENCING EQUIPMENT
AT
USCG SECTOR ST. PETERSBURG
IN TWO DIFFERENT LOCATIONS,
ST. PETERSBURG AND TAMPA
GENERAL REQUIREMENTS
PART 1 GENERAL
1. INTENT: The intent of this project is to replace the audio visual equipment in four different spaces at as defined in this scope of work, located at US Coast Guard Sector St.
Petersburg, 600 8th Ave SE, St. Petersburg, FL 33701 and 155 Columbia Drive, Tampa, FL, 33606.
2. SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel to perform the installation of all equipment at both
Sector St. Petersburg locations. No repairs outside of the Statement of Work criteria are authorized without permission from the contracting officer or their representative.
3. QUALIFICATIONS: Contractor shall provide personnel who have the knowledge, qualifications, and working experience to perform the functions outlined in the
Performance Requirements.
4. CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facility’s normal operations. Perform all on-site work between the hours of 8:00
AM and 4:00 PM, Monday through Friday (federal holidays excluded), unless otherwise approved by the Contracting Officer or Contracting officer’s representative.
5. GOVERNMENT FURNISHED MATERIALS: None
PART 2 PERFORMANCE STANDARDS
1. PERFORMANCE REQUIREMENTS:
1) Tampa Location:
a. Install small LogiTech conference camera, speakers, and mic in small
4th deck training room. All wires shall be routed through the wall and hidden.
b. Install large LogiTech conference camera, ceiling and mic speakers in large conference room.
c. Install 85” monitor screen for proper video conferencing capabilities.
The monitor is to be included in the proposal.
d. Provide training on use of equipment
2) St. Petersburg Location:
a. Install small LogiTech conference camera, speakers, and mic in
Captain’s office in front of conference table. All wires shall be route through the wall and hidden.
b. Install large LogiTech conference camera, ceiling, and mic speakers in command conference room. Desk mics should be on conference table and wires routed in ceiling to display laptop.
c. Install 85” monitor in conference room with hidden cables. The monitor is to be included in the proposal.
d. Provide training of all installed equipment
2. SITE VISIT: All site visits should be scheduled with the Project Officer.
LT Chelsea Carr
Email: Chelsea.w.carr@uscg.mil
(727) 502-8781
3. PERFORMANCE STANDARDS. Proper adherence to all OSHA and Industry safety procedures is required prior, during and after work being performed. The contractor shall be fully licensed and shall provide the project officer with the plan to route wires through ceiling. The contractor shall furnish all personnel with and require donning of required personal protective equipment (PPE). The contractor shall safeguard the public and
Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services.
4. LIABILITY OF DAMAGES. The contractor shall be liable for all damages to
Government equipment and property when such damage is due to fault or negligence of the contractor. The contractor shall be responsible for all damages or injury to persons that occur as a result of the contractor’s fault or negligence. The contractor shall take proper safety and health precautions to protect the work the workers, the public, and the property of others.
END OF SECTION
File details come from the government source that posted it. Updated .