This is a Scope of Work document for a repair contract with the United States Coast Guard Industrial Production Detachment located at Cape May, New Jersey.
The contractor shall replace approximately 22 one-inch bolts at the base of the turntable boom foundation on a BMC Broderson 18 Ton Mobile Crane (Model IC-250-3E, Serial Number 69849250). One bolt has broken and the manufacturer recommends replacing all bolts, torquing them to specification, and performing a load test upon completion. Work must be performed Monday through Friday between 0700 and 1430 hours. The period of performance shall not exceed 30 working days after contract award or as negotiated with the Contracting Officer and Quality Assurance Evaluator (QAE). The contractor shall provide all labor, materials, and equipment necessary to complete the work. Troy VanCleave serves as the QAE Representative and Point of Contact; site visits are strongly encouraged between November 16-20, 2026, and should be arranged by calling (609) 898-6984.
The contractor must comply with federal safety regulations (29 CFR 1910, 1925, and 1926), obtain all necessary permits and licenses, provide written safety and environmental management programs for review prior to work commencement, clean up daily, submit a detailed employee list five days before starting work, and ensure all vehicles display the contractor's name and maintain valid inspection stickers. Hazardous materials disposal is the contractor's responsibility. The contractor must notify the Base Safety Officer of any activities that could cause fire or explosion and notify the Environmental Protection Specialist of activities that could violate environmental regulations. Upon completion, the contractor shall contact the QAE Representative to arrange final inspection and acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment IV- FAR Clauses and Deviations Services.pdf | ||
| SF-18 RFQ Crane Repair.pdf | ||
| Attachement II- Wage rates.pdf | ||
| Attachment III-DOL SCA Poster.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, and equipment, as required to replace approximately 22 one inch bolts at the base of the turntable boom foundation on a BMC Broderson 18 Ton Mobile Crane. Model: IC-250-3E. Serial Number 69849250 located at USCG Industrial Production Detachment, 1 Munro Ave, Cape May, NJ 08204.
2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall perform repairs between the hours of 0700 and 1430 Monday – Friday..
3. SCOPE OF WORK: The contractor shall replace current discrepancies listed within the General Requirements. Machinery History: One of the 22 bolts had broken on the turntable located at the base of the main boom. Manufacturer recommends replacing the one broken bolt in addition to the remaining turntable bolts, torque bolts to specification and load test once completed.
4. SITE VISIT: All bidders are strongly encouraged to visit the site to field verify any/all conditions before submitting bids. Interested parties shall make arrangements for a site visit with Mr. Troy VanCleave @ (609) 898-6984. Recommend site visit period between 16 November and 20 November 2026.
5. DESIGNATED CONTRACTING OFFICER'S QUALITY ASSURANCE
EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer's QAE representative and Point of Contact for this project is Troy VanCleave. Inquiries concerning any phase of the specification before or after award shall be made to Troy VanCleave.
6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification, or related documents.
7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer's QAE representative of his intended start date. The work shall be done in accordance with the specification. The period of performance for this contract must not exceed 30 working days after contract award or as negotiated with Contracting Officer and
QAE.
8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.
9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.
10. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.
11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.
12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the station's regular hours, he may submit his request in writing to the Contracting Officer's QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.
13. UPON COMPLETION OF WORK: Contact the Contracting Officer QAE Representative to arrange for inspection/acceptance of work.
14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee's full name, date and place of birth, current address and last four (4) of SSN. The Security Officer will be given a copy of the employee list and a pass will be issued for entry. Each contractor provided vehicle or towed trailer shall show the contractor's name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.
15. SAFETY REQUIREMENTS:
I. Responsibilities:
a. All contractors working shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series), 29 CFR 1925 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.
b. Written notification must be provided to the Base Safety Officer, in their capacity as
Base Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion.
2. Rights:
a. Every employee has the right to a safe and healthy work place. The contractor has the responsibility and right to stop unsafe work. QAE's and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.
16. ENVIRONMENTAL PROTECTION REQUIREMENTS:
a. All contractors working shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Any relevant contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist prior to starting work and must be in accordance with the Unit Environmental Guide.
b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a violation. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment. Any relevant copies of the following must be provided prior to starting work in affected areas: Material Safety Data Sheets, permits, and notices of intent.
c. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.
| 2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon |
| 5. DESIGNATED CONTRACTING OFFICER'S QUALITY ASSURANCE |
| 14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The |
| 15. SAFETY REQUIREMENTS: |
| 16. ENVIRONMENTAL PROTECTION REQUIREMENTS: |