This is a Price Template for a design/build construction project to add a new facility to the Maloney Canine Training Center at the James J. Rowley Training Center in Laurel, Maryland. The template is organized into 17 line-item categories with space for contractors to input labor costs, materials costs, and explanations for each work element, with a grand total section summarizing all costs across categories.
The pricing template covers the full scope of construction work required for the approximately 2,479 square-foot addition, including: general requirements (design, permitting, survey, project management); earthworks and site preparation; concrete work; selective demolition; core and shell structure (block walls, metal roof, exterior openings); thermal and moisture protection (roof and wall insulation); interior walls with soundproofing and radiation shielding; interior flooring (terrazzo); electrical systems (400 amp service, lighting, diagnostic imaging systems, generator backup); plumbing (under-slab systems, medical fixtures, water heating, specialty interceptors); mechanical systems (rooftop units, HEPA filtration, BAS controls); communications and IT infrastructure (Cat 6 cabling, network equipment, security cameras); garage door and storage room equipment; fire suppression systems (sprinklers, detection, alarms); interior finishes (flooring, wall treatments, doors, stainless steel casework, restrooms); and special construction items (gutters, downspouts, concrete driveway pad). All line items currently display $0.00 placeholder values, indicating this is a blank template awaiting contractor pricing submission. The project is designated as a small business set-aside with a 410 calendar-day performance period from Notice to Proceed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 - Drawings.pdf | ||
| Attachment 2 - SOW.pdf | ||
| Attachment 4 - Pre bid RFI .xlsx | XLSX spreadsheet | |
| Attachment 1 - K9 Vet Clinic Addition A-M.pdf | ||
| RFP SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Template
| CONSTRUCT ADDITION | TOTAL PROJECT COST: | $0.00 | ||||
| GENERAL REQUIREMENTS | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Design (Architecture, Electrical, Mechanical) | N/A | N/A | $0.00 | |||
| Civil Engineering | N/A | N/A | $0.00 | |||
| MDE Permitting | N/A | N/A | $0.00 | |||
| Survey | N/A | N/A | $0.00 | |||
| Geotechnical | N/A | N/A | $0.00 | |||
| Mobilization | N/A | N/A | $0.00 | |||
| Demobilization | N/A | N/A | $0.00 | |||
| Project Management | N/A | N/A | $0.00 | |||
| GRAND TOTAL: | $0.00 | |||||
| EARTHWORKS | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Site clearing and earthwork (stripping 6" of topsoil, rough excavation, etc. | $0.00 | |||||
| Grading , utilites and storm water management | $0.00 | |||||
| Geothermal inspections | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| CONCRETE | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Install 6-inch heavy structural concrete slab | ||||||
| (Approximately 14 Cubic Yards) | $0.00 | |||||
| Permieter Frost Wall and Masonry ledge | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| SELECTIVE DEMOLITION | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Remove existing doors and windows | $0.00 | |||||
| Remove existing fence | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| CORE AND SHELL STRUCTURE | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Construct block style facility addition enclosed on 4 sides | ||||||
| (Approx 3,086 SqFt of exterior block wall) | $0.00 | |||||
| Construct addition's 4/12 pitch metal roof | ||||||
| (Approx 2,841 SqFt) | $0.00 | |||||
| Snow Guard for the exterior entrances | $0.00 | |||||
| Exterior Openings | $0.00 | |||||
| Site Utilities | $0.00 | |||||
| Install block skirting on exterior wall | ||||||
| (Approx 424 SqFt) | $0.00 |
| GRAND TOTAL: | $0.00 | |||||
| THERMAL AND MOISTURE PROTECTION | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Insulate addition's roof with closed cell foam | ||||||
| (Approx 3100 SqFt) | $0.00 | |||||
| Insulate CMU blocks with core fill insulation | ||||||
| (Approx 2544 SqFt of exterior block wall) | $0.00 | |||||
| Insulate remaining infrastructure with foamboard and batt insulation | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| Interior walls and soundproofing | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Framing and Drywall | $0.00 | |||||
| Acoustic Soundproofing | $0.00 | |||||
| Medical Finishing and panels | $0.00 | |||||
| Radiation Sielding | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| Interior flooring | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Terrazzo Flooring | $0.00 | $0.00 | $0.00 | |||
| $0.00 | ||||||
| $0.00 | ||||||
| $0.00 | ||||||
| GRAND TOTAL: | $0.00 | |||||
| ELECTRICAL | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Install heavy duty 400 amp 120/208 V , 3 phrase | $0.00 | |||||
| Above ceiling wiring | $0.00 | |||||
| Surgical field and exam room LED Lighting | $0.00 | |||||
| Diagnostic Imaging & Low-Voltage IT Systems | $0.00 | |||||
| Automatic Generator Backup & Life-Safety Systems | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| PLUMBLING | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Under Slab trenching and drainage | $0.00 | |||||
| Fixture and Medical Trim | $0.00 | |||||
| Water heating and pressure pumps | $0.00 | |||||
| Speicality interceptors and gas lines | $0.00 | |||||
| permitting and rough in | total costs | $0.00 | ||||
| GRAND TOTAL: | $0.00 | |||||
| MECHANICAL | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Rooftop Units (RTUs) & Variable Air Volume (VAV) Boxes | $0.00 | |||||
| Pathogen Isolation ductwork and HEPA filtration | $0.00 | |||||
| Dedicated IT closet cooling dump and backup mini-split | $0.00 | |||||
| High-Capacity Exhaust Fans & Odor Mitigation | $0.00 | |||||
| Buidling Automation System (BAS) and Digital Controls | $0.00 |
| GRAND TOTAL: | $0.00 | ||||
| COMMUNICATIONS AND BLUE LINE | |||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT |
| Structural Cat 6 (what additional grade A,E,+) | $0.00 | ||||
| Network switch, Power over Ethernet (PoE) and server rack hardware | $0.00 | ||||
| Enterprise IP Camera and Network video recorder | $0.00 | ||||
| Workstation Termination, Patching, and Certification testing | $0.00 |
| GRAND TOTAL: | $0.00 | ||||
| GARAGE DOOR FOR STORAGE ROOM | |||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | TOTAL |
| Install powered 10 foo+A72:E75t tall by 12-foot-wide garage |
door centered on wall facing new concrete driveway
| (1 total) | $0.00 | |
| Install wall mounted garage door opener |
beside entry door on interior side of addition
| (1 total) | $0.00 | ||
| Install Stell Bollards | $0.00 | ||
| Install LED Floodlight centrally above garage |
door on exterior side of addition with automatic sensors
| (1 total) | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| FIRE SUPPRESSION | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Install wet pipe sprinkler heads and piping | ||||||
| $0.00 | ||||||
| Install pull station | ||||||
| (1 total) | $0.00 | |||||
| Install detection devices | ||||||
| (2 total) | $0.00 | |||||
| Install strobe sensor horn device | ||||||
| (1 total) | $0.00 | |||||
| Route fire alarm devices to fire panel in existing room | $0.00 | |||||
| Paint sprinkler system with red oxide paint | $0.00 | |||||
| Install identification/labelling for | ||||||
| sprinkler pipes, fittings, and accessories | $0.00 | |||||
| Hydro-statically test sprinkler system | $0.00 | |||||
| Flush whole sprinkler system after testing | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| Interior fit out and finishes | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Resinous Epoxy or Polyaspartic Quartz Flooring | $0.00 | |||||
| Commercial Sheet Vinyl | $0.00 | |||||
| High-Moisture & High-Abuse Zones walls | $0.00 | |||||
| Exam Rooms & Treatment Areas walls | $0.00 | |||||
| Admin Areas walls | $0.00 | |||||
| Acoustic Ceiling Tiles (ACT) with a high Noise Reduction Coefficient | $0.00 | |||||
| Door and door frames options to include priceing for the x-ray doors | $0.00 | |||||
| Full 304/316 stainless stell casework, intergrated sinks and preminum quartz surfaces and countertops | $0.00 | |||||
| Restroom fixtures for a unisex restroom | total lumpsum with ADA | |||||
| GRAND TOTAL: | $0.00 | |||||
| SPECIAL CONSTRUCTION | ||||||
| LINE ITEM | LABOR | EXPLANATION | MATERIALS | EXPLANATION | AMOUNT | |
| Install 6-inch gutters with guards around entire addition | ||||||
| (Approximately 150 Linear Feet) | $0.00 | |||||
| Install 4-inch x 5-inch downspouts with cleanouts at ground level | ||||||
| (4 total) | $0.00 | |||||
| Concrete pad (driveway) for storage | $0.00 | |||||
| GRAND TOTAL: | $0.00 | |||||
| TOTAL | $0.00 |