Attachment C Pricing Spreadsheet - CLINS by Locations_UPDATED.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Forklifts, Pallet Jacks, and Pallet Stackers for USCIS
Solicitation number
70SBUR27R00000001
Issued by

About this file

This is a pricing spreadsheet for offerors responding to USCIS Request for Proposal 70SBUR27R00000001 for the leasing of material handling equipment. The spreadsheet outlines Contract Line-Item Numbers (CLINs) organized by a base period (FY27) and four option periods (FY28-FY31), with all pricing cells currently populated at $0.00 for vendor completion. The base period includes 14 CLINs covering lease and maintenance of equipment across four facility locations: one forklift for Corbin Production Facility in Kentucky (CLIN 0001); one electric reach truck or stand-up counterbalance forklift for CIF Warehouse in Frederick, Maryland (CLIN 0002); two ride-on electric pallet jacks for Lee's Summit Production Facility in Missouri (CLIN 0003); two ride-on electric pallet jacks for Kansas City Mission Center in Missouri (CLIN 0004); one electric pallet jack for Frederick, Maryland (CLIN 0005); two small battery-powered pallet jacks for Corbin, Kentucky (CLIN 0006); one electric pallet stacker for Lee's Summit (CLIN 0007); and one electric pallet stacker for Kansas City (CLIN 0008). Additional base-period CLINs include shipping costs to each facility (CLINs 0009-0012), optional relocation services (CLIN 0013), and training (CLIN 0014).

Each option period (CLINs 1001-1008, 2001-2008, 3001-3008, and 4001-4012) repeats the core leasing and maintenance requirements for 12-month periods. Option Period Four uniquely includes return shipping CLINs (4009-4012) for equipment removal from all four locations at contract completion. All lease and maintenance CLINs specify 12-month quantities, with most equipment deliveries required within 30 days of contract award and Kansas City equipment required within 60 days of government notification. Offerors must complete the unit prices for each CLIN to establish their total potential price across all contract periods.

View the file

Other files

File Type Posted
70SBUR27R00000001_Amendment 0001 Full.pdf PDF
Attachment C _Pricing Spreadsheet_20261021.xlsx XLSX spreadsheet
Updated RFP 70SBUR27R00000001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing SS for Offerors

70SBUR27R00000001
Attachment C: Pricing Spreadsheet
Leasing of forklifts for CPF, OIT, KCMC and LPF for Office of Intake and Document Production (OIDP)
VENDOR NAME:
BASE PERIOD FY27
CLINDescriptionUnit PriceQuantityBASE PERIOD
0001Lease and maintenance for one (1) forklift for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period 30 days after contract award12$0.00
0002Lease and maintenance for one (1) Electric Reach Truck or Stand-Up Counterbalance Forklift for CIF Warehouse, Frederick, MD, in accordance with the SOW, for a 12-month period 30 days after contract award12$0.00
0003Ride-on Electric Pallet Jack/End Rider (x2) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period 30 days after contract award12$0.00
0004Ride-on Electric Pallet Jack/End Rider (x2) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period 60 days after government notification12$0.00
0005Electric Pallet Jack/End-rider (x1) for CIF Warehouse Frederick, MD in accordance with the SOW, for a 12-month period 30 days after contract award12$0.00
0006Small Battery Powered Pallet Jacks (x2) for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period 30 days after contract award12$0.00
0007Electric Pallet Stacker (walkie) (x1) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period 30 days after contract award12$0.00
0008Electric Pallet Stacker (walkie) (x1) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period 60 days after government notification12$0.00
0009Shipping Corbin, KY 30 days after contract award1$0.00
0010Shipping Frederick, MD 30 days after contract award1$0.00
0011Shipping Lee's Summit, MO 30 days after contract award1$0.00
0012Shipping Kansas City, MO 60 days after government notification1$0.00
0013Optional CLIN: Relocating Equipment to a different site1$0.00
0014Training of Forklifts, Pallet Stacker, and End Riders1$0.00
BASE PERIOD TOTAL$0.00
OPTION PERIOD ONE FY28
CLINDescriptionUnit PriceQuantityOPTION ONE
1001Lease and maintenance for one (1) forklift for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
1002Lease and maintenance for one (1) Electric Reach Truck or Stand-Up Counterbalance Forklift for CIF Warehouse, Frederick, MD, in accordance with the SOW, for a 12-month period12$0.00
1003Ride-on Electric Pallet Jack/End Rider (x2) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
1004Ride-on Electric Pallet Jack/End Rider (x2) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
1005Electric Pallet Jack/End-rider (x1) for CIF Warehouse Frederick, MD in accordance with the SOW, for a 12-month period12$0.00
1006Small Battery Powered Pallet Jacks (x2) for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
1007Electric Pallet Stacker (walkie) (x1) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
1008Electric Pallet Stacker (walkie) (x1) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
OPTION PERIOD ONE TOTAL$0.00
OPTION PERIOD TWO FY29
CLINDescriptionUnit PriceQuantityOPTION TWO
2001Lease and maintenance for one (1) forklift for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
2002Lease and maintenance for one (1) Electric Reach Truck or Stand-Up Counterbalance Forklift for CIF Warehouse, Frederick, MD, in accordance with the SOW, for a 12-month period12$0.00
2003Ride-on Electric Pallet Jack/End Rider (x2) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
2004Ride-on Electric Pallet Jack/End Rider (x2) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
2005Electric Pallet Jack/End-rider (x1) for CIF Warehouse Frederick, MD in accordance with the SOW, for a 12-month period12$0.00
2006Small Battery Powered Pallet Jacks (x2) for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
2007Electric Pallet Stacker (walkie) (x1) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
2008Electric Pallet Stacker (walkie) (x1) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
OPTION PERIOD TWO TOTAL$0.00
OPTION PERIOD THREE FY30
CLINDescriptionUnit PriceQuantityOPTION THREE
3001Lease and maintenance for one (1) forklift for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
3002Lease and maintenance for one (1) Electric Reach Truck or Stand-Up Counterbalance Forklift for CIF Warehouse, Frederick, MD, in accordance with the SOW, for a 12-month period12$0.00
3003Ride-on Electric Pallet Jack/End Rider (x2) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
3004Ride-on Electric Pallet Jack/End Rider (x2) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
3005Electric Pallet Jack/End-rider (x1) for CIF Warehouse Frederick, MD in accordance with the SOW, for a 12-month period12$0.00
3006Small Battery Powered Pallet Jacks (x2) for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
3007Electric Pallet Stacker (walkie) (x1) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
3008Electric Pallet Stacker (walkie) (x1) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
OPTION PERIOD THREE TOTAL$0.00
OPTION PERIOD FOUR FY31
CLINDescriptionUnit PriceQuantityOPTION FOUR
4001Lease and maintenance for one (1) forklift for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
4002Lease and maintenance for one (1) Electric Reach Truck or Stand-Up Counterbalance Forklift for CIF Warehouse, Frederick, MD, in accordance with the SOW, for a 12-month period12$0.00
4003Ride-on Electric Pallet Jack/End Rider (x2) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
4004Ride-on Electric Pallet Jack/End Rider (x2) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
4005Electric Pallet Jack/End-rider (x1) for CIF Warehouse Frederick, MD in accordance with the SOW, for a 12-month period12$0.00
4006Small Battery Powered Pallet Jacks (x2) for Corbin Production Facility, Corbin, KY in accordance with the SOW, for a 12-month period12$0.00
4007Electric Pallet Stacker (walkie) (x1) for Lee's Summit Production Facility, Lee's Summit, MO in accordance with the SOW, for a 12-month period12$0.00
4008Electric Pallet Stacker (walkie) (x1) for Kansas City Mission Center Facility, Kansas City, MO in accordance with the SOW, for a 12-month period12$0.00
4009Return Shipping Corbin, KY1$0.00
4010Return Shipping Frederick, MD1$0.00
4011Return Shipping Lee's Summit, MO1$0.00
4012Return Shipping Kansas City, MO1$0.00
OPTION PERIOD FOUR TOTAL$0.00

Total Potential Price ALL PERIODS $0.00

File details come from the government source that posted it. Updated .