70RSAT26R00000003 - General Pricing Template - 20251219.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- Mobile and Transportable Microreactor System
- Solicitation number
- 70RSAT26R00000003
About this file
This document is a General Pricing Template for a Mobile and Transportable Microreactor System solicitation (Solicitation Number: 70RSAT26R00000003) issued by the Department of Homeland Security Office of Procurement Operations. The pricing template details a five-milestone contract structure for microreactor development, with milestones including contract stand-up and preliminary design (5%), prototype completion and validation (15%), first-of-a-kind (FOAK) delivery and acceptance (35%), next-of-a-kind (NOAK) manufacturing and delivery of units 2-10 (40%), and secure operations and lifecycle support (5%). The contract is structured with multiple Contract Line Item Numbers (CLINs) that are fixed-price (FFP) and include optional elements with incentives, covering stages from initial system architecture and engineering through serial manufacturing, testing, and delivery of multiple reactor units.
The solicitation is a full and open competition for commercial products/services, with questions related to the opportunity due by 4:00 PM EST on December 30, 2025. The pricing template outlines detailed cost elements for each milestone, including system architecture, licensing strategy, safety basis development, prototype fabrication, performance testing, manufacturing, fuel procurement, transport certification, and ongoing operational support. Critical technical areas include engineering design, safety analyses, cyber security, regulatory compliance, and progressive manufacturing of prototype and subsequent reactor units, with an emphasis on lessons learned and continuous improvement across development stages.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Milestone | Percentage of Total | Cost (USD Millions) | Incentive | Primary Cost Drivers |
| Milestone 1 – Contract Stand-Up & Preliminary Design | 5% | Program startup, architecture definition, licensing roadmap, safety basis outline, IMS, risk register, prototype planning, cyber/security baselines | ||
| Milestone 2 – Prototype Completion & Validation | 15% | Prototype fabrication, testing, data generation, autonomous operations validation, safety model updates, mobility testing | ||
| Milestone 3 – FOAK Delivery, Testing, Acceptance | 35% | 5% | FOAK final design, PSAR development, FOAK manufacturing, QA/NQA-1, fuel, FAT, transport certification, FOAK delivery & commissioning | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | 40% | 5% | Serial manufacturing, NOAK QA, NOAK FAT, transport, delivery, lessons learned, cost curve reporting | |
| Milestone 5 - Secure Operations, Protection, and Lifecycle Support | 5% | |||
| Totals | 100% |
Milestone Breakdown
| Milestone | Cost Element | Cost Estimate | Description |
| Milestone 1 – Contract Stand-Up & Program Initiation | System architecture & initial engineering | Core design, SSC classification, materials selection | |
| Milestone 1 – Contract Stand-Up & Program Initiation | Licensing strategy & regulator engagement | Pre-app meetings, pathway planning, PSAR outline | |
| Milestone 1 – Contract Stand-Up & Program Initiation | Safety basis outline | Accident analysis framework, source term assumptions | |
| Milestone 1 – Contract Stand-Up & Program Initiation | IMS & risk register development | Schedule development & risk planning | |
| Milestone 1 – Contract Stand-Up & Program Initiation | Prototype scope & design readiness | Engineering to begin prototype build | |
| Milestone 1 – Contract Stand-Up & Program Initiation | Initial security and cyber baselines | Preliminary Zero Trust architecture, SECONOPS | |
| Milestone 2 – Prototype Completion & Validation | Prototype fabrication | Hardware, machining, QA, instrumentation | |
| Milestone 2 – Prototype Completion & Validation | Prototype criticality & performance tests | Thermal, electrical, control system tests | |
| Milestone 2 – Prototype Completion & Validation | Prototype safety basis updates | Accident analysis refinements | |
| Milestone 2 – Prototype Completion & Validation | Model validation against test data | Digital twin validation, neutronics, TH analysis | |
| Milestone 2 – Prototype Completion & Validation | Mobility testing | Shock, vibration, transport simulations | |
| Milestone 2 – Prototype Completion & Validation | Prototype lessons learned integration | FOAK risk reduction | |
| Milestone 2 – Prototype Completion & Validation | Security & cyber validation (prototype) | Prototype cyber testing, boundary analysis | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK design certification package | Finalized engineering package | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | PSAR development | Safety analyses, licensing materials | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK manufacturing & NQA-1 QA | Fabrication, inspections, supplier QA | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK fuel procurement & fabrication | HALEU supply chain integration | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK transport certification | Type B testing, modeling, regulatory interactions | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK factory acceptance testing (FAT) | Integrated system verification | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK delivery & installation | Transport, pad placement, integration | |
| Milestone 3 – FOAK Delivery, Testing, Acceptance | FOAK commissioning & ORR | Startup testing, operational readiness review | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | Serial manufacturing (Units 2–10) | Nine additional units, economies of scale | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | NOAK fuel | Fabrication for multiple units | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | NOAK QA and QC | Inspections, NQA-1 compliance | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | NOAK factory acceptance testing (FAT) | Verification of each reactor | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | NOAK transport & delivery | Heavy-lift logistics, security | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | NOAK lessons learned & production cost curve | Required by SOW Section 3E | |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | Cyber & physical security certification (NOAK) | Full system reviews for each unit | |
| Milestone 5 - Secure Operations, Protection, and Lifecycle Support | For Prototype Support | ||
| Milestone 5 - Secure Operations, Protection, and Lifecycle Support | For FOAK Support | ||
| Milestone 5 - Secure Operations, Protection, and Lifecycle Support | For NOAK Support |
Total
Section B CLIN Mapping
| Contract Line Item Number (CLIN) | CLIN Description | Contract Type | Amount |
| CLIN 0001 | Milestone 1 – Contract Stand-Up & Preliminary Design | FFP | $ TBD |
| CLIN 0002 | Milestone 2 – Prototype (Unit 0) Completion & Validation | FFP | $ TBD |
| CLIN 0003 | (Optional w/ Incentive) Milestone 3 – FOAK (Unit 1) Delivery, Testing, Acceptance | FFP | $ TBD |
| CLIN 0004 | (Optional w/ Incentive) | FFP | $ TBD |
| Milestone 4 – NOAK Manufacturing & Delivery (Units 2–10) | |||
| CLIN 0004a | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 2 | |||
| CLIN 0004a2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 2 | |||
| CLIN 0004b | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 3 | |||
| CLIN 0004b2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 3 | |||
| CLIN 0004c | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 4 | |||
| CLIN 0004c2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 4 | |||
| CLIN 0004d | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 5 | |||
| CLIN 0004d2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 5 | |||
| CLIN 0004e | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 6 | |||
| CLIN 0004e2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 6 | |||
| CLIN 0004f | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 7 | |||
| CLIN 0004f2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 7 | |||
| CLIN 0004g | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 8 | |||
| CLIN 0004g2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 8 | |||
| CLIN 0004h | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 9 | |||
| CLIN 0004h2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 9 | |||
| CLIN 0004i | (Optional w/ Incentive) | FFP | $ TBD |
| NOAK Unit 10 | |||
| CLIN 0004i2 | (Optional w/ Incentive) | FFP | $ TBD |
| 5% of NOAK Unit 10 | |||
| CLIN 0005 | (Optional) | FFP | $ TBD |
| Milestone - Secure Operations, Protection, and Lifecycle Support | |||
| CLIN 0005a | (Optional) | FFP | $ TBD |
| Milestone - Secure Operations, Protection, and Lifecycle Support for Prototype | |||
| CLIN 0005b | (Optional) | FFP | $ TBD |
| Milestone - Secure Operations, Protection, and Lifecycle Support for FOAK | |||
| CLIN 0005c | (Optional) | FFP | $ TBD |
| Milestone - Secure Operations, Protection, and Lifecycle Support for NOAK | |||
| TOTAL CONTRACT PRICE | $ TBD |
File details come from the government source that posted it. Updated .