- INSTALLATION OF VIDEO SURVEILLANCE SYSTEM (VSS) AT FAIRBANKS FEDERAL BUILDING, FAIRBANKS, AK 99701
- Solicitation number
- 70RFPW23QWA000003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70RFPW23QWA000003 0006.pdf | ||
| 70RFPW23QWA000003 0004.pdf | ||
| 70RFPW23QWA000003 Amendment 0003 4.3.23.pdf | ||
| 1a Final Inspection Document Amendment 0003 (1).xlsx | XLSX spreadsheet | |
| 70RFPW23QWA000003 Amendment 0002.pdf | ||
| 70RFPW23QWA000003 - Amendment 0001.pdf | ||
| 2. 70RFPW23QWA000003 SF 1449.pdf | ||
| Tab V.4 Synopsis.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
70RFPW23QWA000003
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Auburn WA 98001 Attn: Maria Santiago
OPO/FPS/WEST CCG/R10
400 15th Street SW Ofc of Procurement Operations - FPS U.S. Dept. of Homeland Security DHS/FPS/West CCG/Region 10
Auburn WA 98001 400 15th Street SW
70RFPW
Federal Protective Service Acq. Division Office of Procurement Operations U.S. Dept. of Homeland Security
FPS WEST CCG (70RFPW)
04/14/20230005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/01/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
REQ# 192123R10VSSP0021
FPS CO: Jennifer Moore, 253-876-6828, jennifer.j.moore@fps.dhs.gov
FPS CS: Maria Santiago, 253-876-6840, Maria.Santiago@fps.dhs.gov
Install of Video Surveillance System (VSS) at Fairbanks Federal Building, 101 12th Avenue, Fairbanks, AK 99701
A. The purpose of this amendment is to:
1. Update Price Schedule Contract Line Item (CLIN) 0001, 0002, and 0003 description to
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jennifer Moore
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 253-876-6828 jennifer.j.moore@fps.dhs.gov
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70RFPW23QWA000003/0005
match Section B.4.31 of the revised SOW, dated
April 7, 2023. Revised SOW, dated April 7, 2023, was provided through Amendment 0004.
2. CLIN 0001, Optional Item 0001, and CLIN 0002, Optional Items 2, are updated to read as follows:
CLIN 0001:
Optional Item 1: Purchase and install a switch and two exterior PTZ on the annex facility. There is existing fiber. Contractor to determine necessary media convertors with the fiber that is in place. Installation also includes all wiring and components/conduit necessary for fully functional cameras. There is no conduit currently. Any wire/cabling not in the ceiling must be in conduit. It is the Contractor’s responsibility to determine amount needed, to purchase it, and install it. Contractor must size conduit accordingly. Conduit color must match wall color. Also, see section E.3.3 for additional conduit and wiring requirements. See
Section D.4.1 for camera specifications.
CLIN 0002:
Optional Item 2: Purchase and install two 20 MP
IP multi-sensor camera with built-in IR on the annex facility. There is existing fiber.
Contractor to determine necessary media convertors with the fiber that is in place.
Installation also includes all wiring and components/conduit necessary for fully functional cameras. There is no conduit currently. Any wire/cabling not in the ceiling must be in conduit. It is the Contractor’s responsibility to determine amount needed, to purchase it, and install it. Contractor must size conduit accordingly. Conduit color must match wall color.
Also, see section E.3.3 for additional conduit and wiring requirements. Contractor must size and conduit accordingly. See Section D.4.3 for camera specifications.
2. CLIN 0003, Option Item 3, is updated to Read
“Optional Item 3”.
3. Quotes due date is not extended, quotes are due April 18, 2023, at 09:00 AM PST.
B. There are no other changes to the
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70RFPW23QWA000003/0005
solicitation as a result of this amendment.
OFFERORS ARE ENCOURAGED TO REVIEW THE REQUEST FOR
QUOTE (RFQ) PACKAGE AND REVISED SOW IN ITS
ENTIRETY. ANY SUBMISSION WHICH DOES NOT MEET THE
REQUIREMENTS OF THIS RFQ WILL BE REMOVED FROM
AWARD CONSIDERATION. ATTACHMENT E WAS PROVIDED IN
THE RFQ FOR YOUR CONVENIENCE AND OUTLINES THE
QUOTES SUBMISSION REQUIREMENTS.
Change Item 0001 to read as follows(amount shown is the obligated amount):
0001 Optional Item 1: Purchase and install a switch 1 LO and two exterior PTZ on the annex facility. There is existing fiber. Contractor to determine necessary media convertors with the fiber that is in place. Installation also includes all wiring and components/conduit necessary for fully functional cameras. There is no conduit currently. Any wire/cabling not in the ceiling must be in conduit. It is the Contractor’s responsibility to determine amount needed, to purchase it, and install it. Contractor must size conduit accordingly. Conduit color must match wall color. Also, see section E.3.3 for additional conduit and wiring requirements. See
Section D.4.1 for camera specifications.
Change Item 0002 to read as follows(amount shown is the obligated amount):
0002 Optional Item 2: Purchase and install two 20 MP 1 LO
IP multi-sensor camera with built-in IR on the annex facility. There is existing fiber.
Contractor to determine necessary media convertors with the fiber that is in place.
Installation also includes all wiring and components/conduit necessary for fully functional cameras. There is no conduit currently. Any wire/cabling not in the ceiling must be in conduit. It is the Contractor’s responsibility to determine amount needed, to purchase it, and install it. Contractor must size conduit accordingly. Conduit color must match wall color.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70RFPW23QWA000003/0005
Also, see section E.3.3 for additional conduit and wiring requirements. Contractor must size and conduit accordingly. See Section D.4.3 for camera specifications.
Change Item 0003 to read as follows(amount shown is the obligated amount):
0003 Optional Item 3: Purchase and install a UPS for 1 LO the cameras in Option Item # 1. This may require additional electrical outlets. See sections
C.6.1, E.3.1 and F.1.13 for information on emergency power, UPS and electrical outlets. See
SOW Section B.4.26.