This Request for Quote (RFQ) is for a video surveillance system upgrade at the James Byrne Courthouse. The project involves installing 13 multi-head cameras, including 3 new cameras (11-13) with new infrastructure, and requires the contractor to provide all network drops, conduit, cabling, and equipment. Key technical requirements include:
The system must use CAT 7 or CAT 8 cabling, have a minimum 192TB storage capacity (calculated based on specific recording parameters), and comply with all local building and fire codes. The contractor is responsible for removing existing equipment, installing new hardware, and ensuring Section 508 compliance. The solicitation closes on 09/04/2025 at 4:00 PM EST, with the Service Contract Act Wage Determination 2015-4233 Revision 33 applicable. Contractors must provide Power over Ethernet (PoE) via switches and install a new rack for head-end devices, with all work to be completed following national electrical and safety standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ-70RFP325QE3000027 James Byrne Courthouse Question # Questions Reference Response
For the 3 cameras that will be new infrastructure (cameras 11-13) is there existing infrastructure within a desired distance of where the poles will be installed, or do we have to conduit all the way back to the building?
No. Offeror is responsible for conduit back to the building.
The only thing on the interior of the building was the closet where the current camera system headend is located. Will there be confirmation that the interior cable runs will all be in drop ceiling?
No, Is there any chance of the architecture building drawings being released to the bidders?
No available at this time.
Please clarify if conduit is needed above the drop ceiling for the cable runs inside the building.
SOW E.3.4 If exsisting cable trays runs are avalible or J hooks they can be used.
Offerors must follow all local building and fire codes for commercial buildings.
5 Will network and network drops be provided at the locations of each workstation? Offerors are responsbile to rpovide all drops.
6 The approximate cost of the current system. This information has not impact on this RFQ and therefore will not be provided.
7 The year it was installed Unknown. It is past the life expectancy.
In reference to the 3 - new four sensor multi head cameras with IR rings (#11,12,13). Can we have a site visit to look at the new pathways for the conduit runs for these new locations
Site visit date has already been conducted. No additional site visit will be conducted prior to award.
As per C.18 a Philadelphia Electrical license is required for the installation of this system? Is this correct? All applicabable codes and licenses should be followed per jurisdicaiton
10 1) Is all existing wiring installed in conduit?
2)What size is the existing conduit?
1) Unknown.
2) Unknown.
11 Who is responsible for mounting the wall mounted monitors The offeror is responsiblie.
Can we visit the site to review the pathways for the new conduit for the workstations & monitors see response to question #8
13 Is battery backup required for all workstations SOW E.1.4 All VSS electrical and electronic equipment installed shall be powered from an Uninterruptable Power Supply (UPS).
1) Are Davis Bacon Wages listed for this project?
2) Will they apply?
1. No.
2. No. Service Contract Act DOL Wage Determination 2015-4233 Revision 33 is applicable. It was attached to the solicitation.
15 Will the Government please provide a Site Visit Attendee List? A list will not be provided
Would the Government consider extending the due date of the solicitation for at least 1 week after the Government posts answers to questions to allow for proper pricing?
Closing date will remain unchanged at 09/04/2025 4:00 PM (EST)
If the Government has specified a product, can we assume that the Government does not require Section 508 VPATs in the proposal, as the Government has already presumed compliant?
SOW H.1.4
No offerors cannot assume the products Section 508 compliant. It is the responsbility of the offeror to ensure compliance with Section 508.
Section C.8.3 states NVR should be FIPS. Section D.2. does not state NVR should be FIPS. Can the government confirm whether any hardware is required to be FIPS 140-2?
SOW H.1.4
Offerors are hereby notified FIPS 140-2 has been superseded by FIPS 140-3.
The amendment 0001 updates the statement of work para E.16.1. Offerors are responsible to comply with FIPS 140-3.
19 For the 3 new camera locations on poles is there power available or other pathways to get a cable to the pole locations? Not currently.
20 For the 3 new camera locations on poles would wireless radio bridges be permitted to make a connection? SOW B.2.1 No. New CAT 7 or CAT 8 cabling conduit
A 192TB seems excessive for the 13 multi-head cameras the Government has specified in this RFQ. Should the contractor provide a 192TB NVR or provide one based on RFP requirements (30 days retention, framerate, expansion, etc.)?
SOW C.3.1
Contractor shall calculate appropriate storage for all cameras recording at fifteen (15) images/frames per second (ips/fps) at the device (per sensor, not total system), maximum resolution, and minimum compression, 24/7. Storage capacity shall be capable of storing video for a minimum of thirty (30) days. The Contractor shall calculate and provide video storage requirements; the Contractor shall include enough storage for an additional 20% auxiliary for future expansion maintaining the thirty (30) day minimum requirement, per sensor.
Note: The Listed-TB (minimum 192TB) in this SOW is only used as a reference guide and actual TB required will be determine by the contractor, but no less than a 192TB server shall be installed.
22 Can the government identify the MDF/IDFs on a floor plan? Distribution Frame... MDF=Main Distribution Frame. Telecommunication room is located in the basement on the Green Building side.
Question # Questions Reference Response
23 Is sufficient space available in risers, and cable trays for cable distribution (if needed) throughout the buildings and between floors?
SOW E.3.4
Unknown. See question 26.
24 Is there a dropped ceiling in all areas of installation Unknown.
Will the Government allow lifts to be used to access camera locations (including the area between the building and the flower beds on the right side of the building) or does all work need to be done from ladders?
If access with lifts are possible, it will be permitted.
Please provide requirements and expectations of cabling methods.
The video surveillance system utilizes a low-voltage architecture and as standard practice is normally not designed for 100% conduit. To ensure all competitors are pricing this project competitively, please describe the cable pathway requirements, including exterior/interior conduit, fire, and exterior wall penetrations, cable in areas with accessible ceilings?
SOW E.3.4
Contractor must follow all local building and fire codes for commercial buildings. No wire, cable, or fiber shall be left unsupported or hanging across ceiling tiles.
Does all work need to comply with National Electrical Code (NEC) and NECA 1 Standard for Good Workmanship in Electrical Components?
SOW C.1.5
The Contractor shall complete the work pursuant to this SOW following all applicable codes and standards including, but not limited to: Occupational Safety and Health Administration (OSHA), Underwriters Laboratories (UL), National Fire Protection Association (NFPA), National Electrical Code (NEC), and any additional federal, state and local codes and policies.
For the addition of cameras 11 & 12 could you provide statement objective describing the features of camera and field of view by depth and width.
SOW D.3.2
The Contractor shall determine the necessary lens configuration based on the required field of view and lighting for each camera.
For Cameras 11 & 12 what is the expectation of how this should be mounted
SOW B.2.1.
These locations are going to require some engineering and poles, to mount them high enough, securely enough, and with conduit and cabling to function effectively.
30 Is power for the cameras centralized? No, POE via switches.
Do you request a new rack for head end devices to be apart of the proposal or will you be using the existing rack?
B.2.1 Yes, this SOW shall include the purchase, installation, and programming of all related equipment and software
32 Is it part of the scope of work to remove existing cameras and cable? C.1.2
The Contractor shall be responsible for the removal, inventory, packaging for storage and return of all removed FPS equipment to the FPS COR/TPOC. All currently installed wire, cable, and fiber, which is not designated for reuse, shall be removed by the Contractor and properly disposed of.