70LGLY22QSSB00022 Amend 3.pdf
PDF 137 KB Posted
- Attached to
- Install Copper and Fiber Optic cables into the New Simulated Border Wall Facility at Artesia, NM.
- Solicitation number
- 70LGLY22QSSB00022
About this file
This document contains an amendment to a solicitation for installing copper and fiber optic cables at a new simulated border wall facility in Artesia, New Mexico. The Federal Law Enforcement Training Center is seeking quotes to install copper and fiber optic cables to connect buildings within the new facility, with work including installing cable in conduits and handholes. Quotes are due by August 4, 2022 and the requirement is set aside for small businesses. The amendment provides responses to contractor questions, clarifying that fiber optic connectors should be SC-type, fiber panels should be rack mounted, pathways have been verified, and other installation details such as conduit depths and handhole specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70LGLY22QSSB00022 Amend 2.pdf | ||
| dhs_form_11000-6.pdf | ||
| 70LGLY22QSSB00022 Amend 1.pdf | ||
| 70LGLY22QSSB00022.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
70LGLY22QSSB00022
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
GLYNCO GA 31524
70LGLY
ATTN: Lynda Bush
1131 CHAPEL CROSSING RD
FEDERAL LAW ENFORCEMENT TRAINING CENTERS
DEPARTMENT OF HOMELAND SECURITY
08/01/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/17/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
2022 FLETC OPERATIONS AND SUPPORT 70 0509
The purpose of this amendment is to respond to additional questions. The closing date remains August 4, 2022 at 1:00 pm.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Lynda A. Bush
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 912-267-3128 lynda.a.bush@fletc.dhs.gov
1. In the bid you state LC-type fiber connectors in 4.1.6 and 5.8, but SC were mentioned during our site visit and it’s stated in the amendment answers (#3) that you’re requesting 12-port high-density modules, which are typically SC. Which type do you require? SC
2. Will Corning be a suitable replacement for Superior? Yes as long as the modules fit properly in the patch panel box
3. Section 5.4 and 5.5 state both fiber panels will be rack-mounted. Is 4.1.9, wall-mounted fiber panel, still requested? No, They should be rack mounted.
4. Section 5.3 states three 3” 3-cell Maxcells in one conduit. Is this accurate or, based on the total amount of Maxcell requested in 4.1.5, do you want to split the 16,000ft between the two conduits? Split between two conduits
5. Provide new verified pathways.
6. Confirm that bollards will be required during manholes only within perimeter fencing of main training ground. Out in the desert no bollards shall be needed, please confirm. That is correct
7. Confirm Fiber markers are required. That is correct
8. Provide utility locates and depths. There is existing electrical service right by the shooting range and new service (recently trenched) out on the desert. The electrical cabling is at 48”. The new fiber duct bank should be installed at 36”
9. Will any bonding be required on this project. Bonding? Please clarify
10. Confirm that handholes shall be the smaller concrete HH’s not the 4’x4’. The handholes should be traffic rated concrete 2’x 4’
11. Confirm that bottom handholes will require gravel to let rainwater flow into the ground. This is correct