U.S. Department of Homeland Security FEMA Region IX 1111 Broadway, Suite 1200 Oakland, CA 94607‐4052
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS
GENERAL INFORMATION
Document Type: Combined Synopsis/Solicitation
Solicitation Number: 70FBR9Q00000078
Amendment: 0002
Posted Date: Friday, August 24, 2018
Site Visit: Friday, August 17, 2018 at 10:00 AM Pacific
Second Site Visit: Wednesday, August 29, 2018 at 10:00 AM Pacific
Deadline for Questions: Wednesday, August 22, 2018, 2017 12:00 PM (Noon) Pacific
Quote Due Date: Friday, August 31, 2018 at 12:00 PM (Noon) Pacific
Revised Quote Due Date: Thursday, September 6, 3018 at 12:00 (Noon) Pacfic
Classification Code: N060 Installation of Equipment – Fiber Optics Materials, Components, Assemblies, and Accessories
Set-Asides: TOTAL SMALL BUSINESS SET-ASIDE
NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors
Size Standard: $15.0 M
Contracting Office Address
FEMA Region IX: 1111 Broadway, Suite 1200 Oakland, CA 94607
FEMA Region IX
TABLE OF CONTENTS
Revised Requirement…….………………………………………………………8
Questions and Answers.….………………………………………………………9
FEMA Region IX
Questions and Answers for 70FBR918Q00000078
RRCC Data Room Rewire
General Questions
1. Is there an incumbent contractor performing these services? If so, please provide the contract number.
a. Similar data wiring services have been performed recently in FEMA Region IX, however, none of this scope or magnitude.
2. When does FEMA anticipate work starting for this requirement?
a. Vendors should be prepared to start by September 24th.
3. What will be the project duration?
a. Period of performance of the contract is one year. We anticipate Task #1 taking 1-3 days to complete. We anticipate task #2 taking 5 days to complete. We anticipate task #3 taking 5 days to complete. We anticipate take #4 taking 5 days to complete.
We anticipate task #5 taking 5 days to complete. Each task exact start date will be coordinated with the FEMA POC.
4. Depending on the responses below, mainly on the fiber optic and voice cabling) could the 15 day completion be extended (if that is the correct timeline)?
a. See answers above in #3. If additional or alternative time estimates per task are proposed, FEMA will consider.
5. Is there reserved parking on-site for contractors?
a. A Loading Dock is available for short term parking and can be coordinated by the
FEMA Admin Service Branch Chief through the FEMA POC. Vendors will be responsible for long term parking. (Several Available lots in the area that are close to the building.)
6. Would it be possible for off shift work to be done? And, or will the selected contractor be able to work past 4 PM and weekend to complete?
a. Shiftwork will be allowed if it enhances the contractor’s ability to complete the project. It will not be allowed because contractor is failing to meet project milestone.
7. Is there a specific brand of cable or hardware that is to be used for project?
a. No specific brand as long as it’s Shielded CAT6 cabling. Blue Cables – Data and
White Cables – Voice.
FEMA Region IX
8. Is there going to be revised scope of work tasks that will be adding the task of relocating the 110 blocks and data cabling in the 12th floor IT Data rm.?
a. The previous plan was to relocate the 110 Block to the wall on the other side of the server room. Current plan is to move the 110 Block 11ft from current location on the same adjacent wall. (Picture attached below.)
9. Is scope going to be revised to eliminate old 110 style voice solution with new cat6 cable to patch panels for use with VOIP solution? If so, for 11th floor RRCC and FEMA/DCO server room?
a. The assumption is: Yes, once all equipment is in place for VOIP phones.
10. If the Government is migrating to a VOIP phone system should all of the Category 6 be terminated onto patch panels and not 110 blocks?
a. VOIP Distribution is currently in place, relocation of 110 blocks will be utilized for special circuits designated prior to start of required work.
11. Was the decision made yet to just install new cable from FEMA/DCO server rm. to RRCC area, replacing all cable? It seems the other solutions would have cable runs over the 295 foot max distance allowed for cabling.
a. Please provide both solutions:
i. The existing stays in place, vice replacing all cabling - as per the RFQ;
ii. Replacement of existing cabling terminating in the 11th Floor Data Room.
12. Is there a manufacturer’s warranty required for the new Structured Cabling System? If so does the Government require a 15 or 25 year warranty?
a. Please provide the industry standard.
13. Depending on the answers to the requirements for the Fiber Optic cabling and high pair voice cable can a secondary site visit be planned to gather information on what will be required?
a. Yes, second site visit has been scheduled for August 29th at 10AM. Please let the Contracting Officer know who will attend via email to:
andrea.brunsman@fema.dhs.gov.
14. The selected vendor work on both of the 11th and 12th floors at the same time?
a. Yes, selected Vendor can work on both the 11th and 12th Floors.
Task 1: 11th Floor RRCC Data Room
15. On moving 110 Type Wiring Block, based on the site visit, it does not appear that there is enough cable slack to move the block to the adjacent wall, however, we will provide a quote to reroute with the assumption that there is adequate cable slack to move. Would FEMA be able to negotiate a change order with the selected vendor to re-work the agreement term upon discovering the lack of cable slack? Or, can FEMA definitively confirm that there is or is not adequate slack in order to provide an accurate quote?
a. The new CAT6 wiring was ordered to be installed with sufficient slack to reach the new locations. However, if it is found to be insufficient, a change order can be negotiated.
16. Same above question for the data patch panel.
a. Answer to question (15) applies to the data patch panels as well.
FEMA Region IX
17. How many phone lines are on the 110 Type Wiring Block?
a. Once the items are verified and known to be needed/required they can be easily replaced to virtually any wall in the server room. (Estimated more than 20 but less than 100.) The Tie cables between floors and phone cabling runs from the server room (s) out to the work station or cubicles will be re-evaluated by in house Telecom Group.
Task 2: 11th Floor Cabling
18. Wording on the number of drops on this floor is confusing. Request that FEMA provide the total # of drop for each location – Desk Space areas – 1 Data Drop (Blue Wire)/ 1 Voice Drop (White Wire)
a. RRCC Computer section: 61 Computers
b. RRCC Conference Room: 9 Drops/1 table Top Connection
c. RRCC Drops Wall Area – 4 Drops
d. Recovery Area: 43 Computers/2 drops small conf Near Office 1101
e. (8) Office Space Area – 8 Data/8 Voice
f. (1) Conference Area Room 1107 - (4 drops)
g. New drops to be added: 3 new drops as depicted on initial floorplan drawing that were included in the RFQ.
19. Recovery Area – All existing cables will need to be toned and properly test and label. Are the data from this location homerun to the FEMA/DCO room?
a. No, the current data runs for the recovery area are going to the RRCC server room.
20. Are the patch panels in the FEMA/DCO need to be moved to the adjacent wall?
a. No, the current patch panels will remain in place, those cover the Response/IMAT area. A new patch panel along the left entry wall will need to be installed.
21. For the 60 existing white cat 6 serving the RRCC the selected vendor will require access to the raised floor at a point close to the new termination point (FEMA/DCO Server Room) in order to keep the cabling distance under 295 ft. At the walk through there was a room identified for a potential route to establish the pathway. Can you confirm the location where we can route the cable from the ceiling to the underfloor?
a. The area verified is the previous vending machine room, this area will be the route through area for the cable runs from ceiling to underfloor.
22. Does the relocation of the switches require any fiber optic cabling and or high pair Telephone cabling to be relocated to the FEMA/DCO Server Room? If so can you identify the cable grade and pair counts for the copper and Fiber Optic cable?
a. Yes, Fiber will be required for the Cisco 52 port Gigabit Managed Switch.
23. Please confirm that all cabling, existing and or new, will need to be properly supported on
Contractor supplied and installed J hooks for all areas.
a. All Cabling existing or new will need to be properly supported on Contractor supplied and installed J Hooks, currently there aren’t any J hooks in the ceiling.
Task 4: 12th Floor IT Data Room
24. Moving the patch panels to the opposite wall, what is the total # of data drops?
FEMA Region IX
a. All the drops on these patch panels do not need to be redone. All of this work was previously done.
25. Are the current labels on the patch panel and workstation accurate?
a. The current labeling on the Patch Panel and workstations are accurate. The work was previously done this year and labeled properly.
26. How many analog phones lines are on these 110 blocks?
a. 2 or more, where they will be located is variable and consideration to question 8 has to be given.
27. Since the Department will be migrating to a VOIP system, moving all analog 110 type wiring blocks can be costly. Not to mention the down time to troubleshoot if the phones are not working.
This is a statement, not a question.
a. This will be handled by in house Telecom Technicians.
28. Same as Task II. Does the relocation of the switches require any fiber optic cabling and or high pair Telephone cabling to be relocated to the FEMA/DCO Server Room? If so can you identify the cable grade and pair counts for the copper and Fiber Optic cable? The question arose at the site visit on waiting to complete this floor until after the Government received the new IP phones. If we wait a lot of this work will become obsolete, due to the high concentration of phone lines on the wall that will be relocated.
a. There currently isn’t a set date for this the complete crossover from current phone system to VOIP phones. The only Fiber Optic cable that is needed will be for the switch that will be moved from the RRCC Server room to the 11th Floor FEMA/DCO server room. For the 12th Floor there is already Fiber that is run.
29. If we are to relocate all of the phone lines please let me know what type of Phone system is in use
– make and model.
a. Currently Audix/VM System
30. Will we be required to bring up all phones after relocating the cabling? This will require information from the Government on which extensions go to which employees to ensure the phone numbers are replaced to the correct location at the completion of the project.
a. Contractor will be required to relocate cable. Telecom Technicians will bring phone back online, and set up phone extensions.
31. The RFP does not speak to staging and/or temporary storage of contractor-furnished materials and equipment throughout the project’s duration. Please speak to this issue for clarification.
a. Contractor will be able to store/stage their things either in the AFT part of the server room, or in the IT Conference Room Area.
32. Statement of Objectives - Section 9. Testing – A. General Instructions (Page 11, Item #4) states “Successful completion of all tests indicated below is required for acceptance.” Does this statement refer to Page 11, Item #1 rather than test criteria that is not indicated or listed in any further text below Item #4?
a. Completion of all test refers to once the cable runs are complete, we will be able to connect a laptop to the location and verify there is a network connection.
FEMA Region IX
33. Is it possible for the FEMA Region IX Office to provide a copy of previous test results of its current inside cable and wire plant (i.e., workstation, office, common areas, etc.)
prior to the start of the required testing phase?
a. This information is not currently available. Is it necessary in order to provide a quote based on all other information provided?
34. Is it possible for FEMA to provide current floor plans showing placement of current cabling and patch panel wiring to allow for determining integrity of each cable and wire termination?
a. Will be provided by Wednesday, August 29th and posted online directly following the second site visit.
Task 5: Cabling in Recovery Area
35. “The connectors will have fastener clamps on each side of the plate. (See Example Below).” No such example was provided as stated.
a. See attachment below for fastener clamp to be attached to the cubicle furniture.
FEMA Region IX
(PIC of 110 Block Location Change)
This will be the new location of the 110 Block which is currently 11’ – 12’ away from current location.
FEMA Region IX