U.S. Department of Homeland Security
FEMA Region IX
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
COMBINED SYNOPSIS/SOLICITATION FOR COMMERCIAL ITEMS
GENERAL INFORMATION
Document Type: Combined Synopsis/Solicitation
Solicitation Number: 70FBR9Q00000078
Amendment: 0001
Posted Date: Friday, August 10, 2018
Site Visit: Friday, August 17, 2018 at 10:00 AM Pacific
Deadline for Questions: Wednesday, August 22, 2018, 2017 12:00 PM (Noon) Pacific
Quote Due Date: Friday, August 31, 2018 at 12:00 PM (Noon) Pacific
Classification Code: N060 Installation of Equipment – Fiber Optics Materials, Components, Assemblies, and
Accessories
Set-Asides: TOTAL SMALL BUSINESS SET-ASIDE
NAICS Code: 238210 – Electrical Contractors and Other Wiring Installation Contractors
Size Standard: $15.0 M
Contracting Office Address
FEMA Region IX: 1111 Broadway, Suite 1200 Oakland, CA 94607
TABLE OF CONTENTS
Requirements Documentation – Additional Task….………………………………………………………8
Requirements Documentation
STATEMENT OF OBJECTIVES
Date: 08/07/2018
Title of Project: Region IX Relocation of RRCC IT Data Room (11th Floor)
1. Background
FEMA Region IX is going through an extensive redesign of the available workspace in the 1111 Broadway, Suite 1200 & 1100 locations. This includes consolidation of data rooms and reducing the size of the main IT
Data Room.
Additionally, the contractor shall provide all resources necessary to install new data & voice cabling for the
11th Floor’s work stations and offices due to relocation and downsizing of the IT Data Room at the Region IX
Office located at 1111 Broadway, Suite 1200, Oakland, California, 94607.
2. Performance Period
The contractor shall complete the work required under this SOW in no more than 1 year from date of award.
Work shall be completed within 15 business days after instructed to begin.
Any on-site work shall be performed during regular business hours, Monday through Friday, 8am to 4pm.
Any work performed outside the regular business hours shall be approved by the CO and coordinated with the on-site point of contact. Delivery of items may occur after hours immediately prior to the installation beginning.
Impacts to the Regional Office from this work shall be minimized and mitigated by the contractor in a way that limits disruption to the functioning of the facility at no additional cost to the government.
3. Scope of Work
Prior to the contractor commencing work, FEMA will:
Remove CISCO 52 Port Gigabit Managed Switch from the 11th RRCC Data Room.
Remove the CISCO Catalyst 4500T E Series Switch from the 11th Floor Server Room.
Install the CISCO 52 Port Gigabit Managed Switch in the FEMA/DCO Server Room.
Conduct testing with Contractor, to ensure connectivity at each workstation, office, common area, etc.
and are connected properly.
Remove 12th Floor Data Room Servers and install Server equipment into newly installed racks.
The Contractor shall perform the following tasks:
Task I – 11th Floor RRCC Data Room
Disassemble current rack equipment, removal of all rails, brackets and trays from the 11th Floor
RRCC Data Room.
Properly dispose of all old rack equipment and excess wiring from old server rack.
Relocate the 110 Type Wiring Block from the back of the 11th RRCC Data Room to the side panel wall within the 11th Floor RRCC Data Room.
All wiring from the old Block location shall be moved/rerouted to the new Block location.
Relocate Data patch Panels from the back of the 11th RRCC Data Room to the side panel wall within the 11th Floor RRCC Data Room.
All wiring from the old Patch Panel location shall be moved/rerouted to the new Patch Panel location.
Task II – 11th Floor Cabling
The following existing white cable originating from the RRCC shall be kept: RRCC Computers (60);
Room 11-109 (5) existing runs; 1 Voice and 1 Data; (2) Ricoh Printers Conference Room (10 existing); (5) Data (5) Voice along Video Wall.
The following existing Recovery Area cabling shall be kept: (40) New Runs from Cubicle Area to 11
Floor FEMA/DCO Server Room. Rooms: 1102; 1103; 1104: 2 Data 1 Voice. State of Nevada
Collaborative Room (3) Data and 1 Voice. Storage Area (4) Data (1) Voice. Room 1105 (1) Data (1)
Voice. (IA) Outside Office Area: (2) Data (2) Voice. (IA) Seating Area (2) Data (2) Voice.
The following existing Response Leadership Area cabling shall be kept: Total of (9) Existing, 1 Data
1 Voice. Room 1108: 1 Voice 1 Data.
The contractor shall add:
o (2) Data and (1) Voice run for Room 1110 terminating in the 11th RRCC Data Room.
o (4) Data (2) Voice runs in Room 1113A, Regional Administrators Secondary Office in the
RRCC.
o Install 2 (48) Port CAT 6 Patch Panels and new Cable Tray in the FEMA/DCO Server Room.
Data cabling shall be run from the 11th Floor RRCC Data Room Patch Panel to the 11th Floor
FEMA/DCO Server Room. Quantity as indicated in the above count of existing and additional.
Contractor shall be responsible for removing cabling which has been replaced. Properly dispose of all replaced and excess wiring.
Task III – 12th Floor IT Data Room Server Racks
Disassemble current rack equipment, removal of all rails, brackets and trays.
Remove all decking rack bolts from previous and current rack removal.
Remove Boiler/Decking Plate.
Properly dispose of all old rack equipment and excess wiring from old server rack.
Mount and Assemble (3) Two-post racks and (5) A/V cabinets and all related Hardware (Such as rails, brackets and trays) on the rack. Equipment will be provided by FEMA (Attachment A).
Provide enough rack space and any additional accessories (including but not limited to bolts, nuts and related tools required for a successful installation) to facilitate the installation of hardware.
Retrofit Rack installation in accordance with California Earthquake retrofit code.
Attachment A is a list of government owned data racks we are requiring to be assembled and installed in the
IT data center.
Task IV – 12th Floor IT Data Room
Terminate all CAT6 wiring and ensure all RJ45 jacks are properly connected to the switches and at each workstation location.
Ensure that the patch panel is properly labeled on both ends, coming from the panel and at each workstation location.
Phones will be properly terminated on 110 Blocks via C4 Connectors.
Provide slack relief at each termination point in the event of re-termination of cable drops.
Review and provide the customer with a detailed diagram in Microsoft Visio with of all newly wired
CAT6 connections at each workstation/desk location.
For all tasks the contractor shall:
Maintain adequate staffing levels and requisite skill levels demanded by the project.
Provide efficient project management throughout the project.
Ensure completeness and quality of project deliverables.
Maintain adherence to the project schedule.
Avoid collateral damage to facilities and equipment from the move and, if it happens, assume monetary responsibility for the same.
Communicate issues in a timely manner for collaborative resolution.
Follow the industry standard procedures for data center equipment installations.
4. Cabling
1. The Category 6 portion of the cabling system shall comply with the link and channel performance requirements of ANSI/TIA/EIA 568-B.2-1 “Performance Specifications for 4-pair 100 Ohm Category 6
Cabling.”
2. Ensure each new CAT6 connection are installed properly without any damage to the cable or connectors.
3. Provide slack relief at each termination point in the event of re-termination of cable drops.
4. All Network wiring shall be blue CAT 6 and terminate on blue RJ45 jacks at the user end. The network end shall be on patch panels (Leviton as currently installed).
5. All Phone connections will be on white CAT 6f and terminate on white RJ45 jacks at the user end. The network end will terminate on 110 blocks via C4 connectors.
6. Every designated origination point shall consist of 2 Data and 1 voice CAT 6 cables. Terminated and tested.
7. Contractor shall provide the government with a detailed diagram with of all newly wired CAT6 connections at each workstation/desk location.
5. Termination of Cables
The Contractor shall terminate all conductors of all cables. They shall be labeled in a permanent legible fashion, in accordance with TIA/EIA 606-A standards.
6. Securing
1. The Contractor shall be responsible for securing all cabling in a way to satisfy any structural engineering requirements.
2. Tie wraps shall be used at approximately 24-inch intervals to secure cable in cable trays and to provide strain relief at termination points.
7. Protection
1. During installation, and prior to final acceptance, the Contractor shall protect finished and unfinished work against damage and loss. In the event of such damage or loss, the Contractor shall replace or repair such work at no additional cost to the government.
2. As cable is installed, care must be taken to avoid nicks, kinks or other damage to the cable. Cable is to be labeled at each end as specified by the government. Provide strain relief at each termination point and enough slack to easily re-terminate the cable, if required later.
8. Splicing
No splicing of any cables will be performed unless otherwise pre-approved in writing by the government.
9. Testing
A. General Instructions
1. The Contractor shall thoroughly test all cables and connectors that they furnish and install. The government requires certification that all pairs were tested and found to be 100% reliable end-to-end (block-to-block and block-to-receptacle); bad pairs/punch-downs and/terminations shall not be used, but rather be corrected and/or replaced at no additional cost to the government. The Contractor shall present all testing plans to the government for approval prior to the start of testing. The Contractor shall provide all labor, test equipment, and tools necessary to verify proper operation prior to final acceptance by the government. The Contractor shall provide a spreadsheet detailing the testing and results of all cables.
2. Prior to any testing, the Contractor shall provide the government with a two (2) day minimum advance notice of the date testing is to begin. All tests will be done with government personnel present and results shall be documented, and submitted to the government for review.
3. The Contractor will repair or replace all cable, connectors, and equipment supplied by the contractor, which do not meet acceptance criteria.
4. Successful completion of all tests indicated below is required for acceptance.
B. Replacement
Any cable, connector, or wiring block, patch panel or other device furnished by the
Contractor which tests below manufacturer's standards shall be replaced at no additional cost. The replacement shall be re-tested to verify compliance.
C. Testing Procedures
1. The Contractor shall provide the necessary test equipment to conduct the tests.
2. Field tests may be required to be performed in the presence of the government and/or its duly authorized representatives. The contractor shall provide written documentation reporting test results.
10. Cable System Documentation
Documentation of all installed cable shall be provided in an electronic database.
11. Contractor Furnished Equipment (CFE)
1. The offeror shall furnish all necessary tools, equipment and materials required for performing all work associated with the completion of this requirement, which also includes testing and installation
2. All material and equipment identified to accomplish this contract shall be furnished by the offeror. The offeror will purchase, ship, move, store, inventory, and handle installation material that is identified as CFE.
Excess materials and prescribed spares shall be turned over to the COR at the completion of the project.
Material turned over at the completion of the project shall be thoroughly documented including description, part numbers, and quantities.
12. Government Furnished Items and Systems
Utilities: The Government will provide use of electrical and water for the purpose of operating and cleaning equipment: The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning of equipment.
Domestic drains and storm drains on the job site shall not be used to dispose of gasoline, paint, thinners, solvents, concentrated cleaning agents, or other hazardous materials.
The government will be responsible for removing and disposing of old system furniture.
13. Local Codes, Licensing, and Permit Requirements
In the performance of this contract, the offeror agrees to abide by all laws, codes, rules and regulations set forth with regard to the equipment by municipal or State authorities having jurisdiction in effect on the date of this contract. The offeror shall be responsible for obtaining all local licenses and permits. This section applies to all tasks associated with this contract.
14. Cleaning/Safety
1. The Contractor shall clean up each work area at the end of each day. Remove all cartons, debris, etc. as the work progresses, and finally at completion of the work. Offerors are responsible for disposal of refuse generated in the performance of their duties. The offeror shall exercise reasonable effort to use equipment and practices that reduce impact upon the environment. Recyclable refuse (e.g., scrap wire, empty cans, plastic ware and shrink wrap, paper products, etc.) shall be collected by the offeror for recycling.
2. Just prior to inspection for substantial completion the Contractor shall perform all final cleaning and sealing of equipment required to bring the installation to optimum appearance.
Clean-up of work area shall be performed daily.
3. Offerors must present and conduct themselves in a professional manner, at all times, while in Region IX space.
4. Offeror must adhere to Occupational Safety and Health Administration (OSHA) safety regulations and precautions, while working inside and/or outside of Region IX space. Take standard precautions for electrical, trip and fall hazards. Wear appropriate safety equipment as required.
15. Security
In order to gain access to our facilities it requires a Government issued identification for all attempting to gain access. The Contractor shall ensure that all contractor personnel have the proper identification (Valid photo identification) in order to gain access to the facilities.
16. Insurance Requirements for Vendors
(1) Worker's Compensation Insurance as required by law in the state in which the Property is located, with a waiver of subrogation against Owner and Manager;
(2) Commercial General Liability Insurance in the minimum amount of Three Million Dollars
($3,000,000) for each occurrence and Three Million Dollars ($3,000,000) in the aggregate, as applicable, combined single limit, bodily injury and property damage;
(3) Employers' Liability insurance applicable to and covering all persons engaged in the performance of any work at the Property with limits of liability of not less than Three Million Dollars ($3,000,000,00) for each occurrence and in the aggregate; and
(4) Business Automobile Insurance in the minimum amount of Three Million Dollars ($3,000,000,00) for each occurrence and in the aggregate covering all automotive vehicle, whether owned or hired, which is used by a contractor or subcontractor preforming work at the Property,
(5) Additional Insured’s, Certificate holder information:
Broadway Franklin LLC;
CBRE, Inc.
1111 Broadway, Suite 120, Oakland, CA 94607
Updated Requirement – Additional Tasks
8/10/2018
Task V – Cabling in Recovery Area
Anticipate a 2-3 day window in between the removal and installation of the new cubicles where testing, and replacing if necessary of Current CAT6 cabling. Data connections (59 Total) and (50
Total) Voice lines will all be toned and tested from both ends cubicle to patch panel.
Place all toned and tested CAT6 back into the new Cubicles.
3 Additional Spaces have been added and will require same setup as cubicles. (Drawing Attached to reflect changes)
CAT6 wiring should reflect FEMA Region IV cabling standard, Data (Blue Wire); Voice (White
Wire).
The Data and Voice connections should all be labeled in the 100 series to continue numbering from
Response side.
Office areas Data/Voice ports should reflect the same numbering of the actual office. (IE. 1101, 1102, etc.)
Ensure the Wall plates to new work stations with RJ45 connecters are properly seated in furniture.
The connectors will have fastener clamps on each side of the plate. (See Example Below).
Provide slack relief at each termination point in the event of re-termination of cable drops.
Will review and provide the customer with a detailed diagram with of all newly wired CAT6 connections at each workstation/desk location. (Visio Preferred)
Certification for all Phone and Network. Will test with IT personnel to ensure each new connection is up and properly connected. Once tested, IT personnel can sign off for each workstation.