Attachment_3_Statement_of_Objectives_Comm_Lines_and_Fiber_Final.pdf

PDF 49 KB Posted

Attached to
FEMA REG VI TRO Communication Line Replacement Federal contract opportunity
Solicitation number
70FBR618Q00000023
Issued by
Federal Emergency Management Agency Region 6

About this file

Attach 3 Comm Fiber

View the file

Other files for this federal contract opportunity

Other files attached to FEMA REG VI TRO Communication Line Replacement, newest first.
File Type Posted
Questions_from_Communications_Lines_Final_Change_07162018.pdf PDF
Attachment_2_SCA_WAGE_DETERMINATION_TRAVIS_COUNTY_WD_15-5215.pdf PDF
Attachment_5_Provisional_&_Clauses.pdf PDF
COMBO_COMM.pdf PDF
Attachment_1_TRO_Blank-North_Texas_Floor_Plan_Final.pdf PDF
Attachment_4_Technical_Evaluation_Criteria_Communication_Lines_TRO_Work_(Autosaved).pdf PDF
FBO_Site_Visit_Memo.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Region VI Texas Recovery Office Austin, TX

FOR OFFICIAL USE ONLY

June 26, 2018

Federal Emergency Management Agency (FEMA) Procurement Sensitive Data

Statement of Objectives Department of Homeland Security (DHS)

1. PROJECT TITLE

Low Voltage “computer network” wiring to the FEMA facility located at 11000 IH 35N, Austin, TX 78753.

2. BACKGROUND

This location is the former Golfsmith Corporate facility. This single story office/tech building has been renovated multiple times.

3. SCOPE

The purpose of this project is to have low-voltage connections installed to provide “computer” network connectivity to new modular furniture workstations, renovated offices and multi-function devices as provided on the attached floor plan. The contractor will provide contracting services, labor and supplies necessary to provide connectivity to approximately 280 cubicles throughout the facility. The contractor will provide all materials and labor required install category 5E cabling, j-hooks, connectors, two-post racks, grounding equipment, twelve-strand fiber runs, patch panels as needed. The contractor will be responsible for floor, wall and ceiling protection. The contractor also will make repairs to any walls, flooring or ceiling that incur damage due to the nature of the electrical construction project. The contractor will remove all debris from the premises and transport to the appropriate sites. The FEMA dumpster at the rear of the building may be used, however the office trash cans are not to be used. The contractor will coordinate date and time of work with the appropriate FEMA and building contacts. Work must be performed during normal work hours (7am – 5pm). No Federal holidays. The work will need to be done in a reasonable amount of time. We anticipate 30 days to completion. All cabling, end-to-end, will be labeled to identify new circuits and tested. The contractor is responsible for all permitting and associated fees, and final inspection for approval of use by the local permitting office.

Notes: The building where work is to be performed is located at 11000 IH 35N, AUSTIN, TX. The work area encompasses approximately 90,000 square feet total. The entrances to the work area are close to where each phase of the work is located. There may be personnel and furniture in place where the contractor will be working.

All work shall be done under the supervision by a licensed electrical or data contractor.

Attached documents:

1. Overall building floorplan titled “Texas Recovery Office Cubicle Floor Plan” [two pages].

4. APPLICABLE DOCUMENTS

• FEMA Security Standards

• International Building Code

• NFPA 70: National Electrical Code

• NFPA 101: Life Safety Code

• NFPA 110: Standard for Emergency and Standby Power Systems

• NFPA 111: Standard on Stored Electrical Energy Emergency and Standby Power Systems

• OSHA 29 CFR – Occupational Safety and Health Administration

Austin, TX

• OSHA 1910.268 - Telecommunications

• OSHA 1910.269 – Electric Power Generation, Transmission, and Distribution

• OSHA 1910 Subpart K – Medical and First Aid

• OSHA 1910 Subpart S - Electrical

• All laws and regulations in place by the local municipality, city, county, state, and Federal.

5. SPECIFIC TASKS

To be determined by the vendor to accomplish the Statement of Objectives. The specific assignment is in the attachments and Deliverable and Delivery Schedule. See Attachment 1 - Floorplan with approximate cubicle and office locations.

The FEMA Texas Recovery Office will be installing modular furniture and will need two (2) each data drop installed from the source to the end use point:

1. FEMA will supply one MDF [Main Distribution Facility] and six IDF’s [Intermediate Distribution Facility]. The MDF and 4 of the 6 IDF’s [1-4] are located in Building A. The last two IDF’s [5 & 6] are in Building B.

2. FEMA will also supply electrical power for the MDF. Power for the IDF’s will be supplied via a dedicated electrical run from the MDF so as to utilize the Master Battery Backup [Powerware] and [Kohler] Diesel Generator Systems.

3. Contractor will adhere to EIA/TIA 568B Standards, unless otherwise noted.

4. The desks will have power poles with data internal raceways to support two (2) each data drops from approximately a 10-12 foot drop ceiling to a block cubicles.

5. Each “Office” will have two (2) data drops, unless indicated separately.

6. Each Conference Room will have at a minimum (3) data drops; one for wall mounted VTC [video teleconference system], one for VOIP Conference Phone and one for a Presenter’s laptop.

7. Where designated on the floor plan – each Printer or MFD [multi-function device] will have one data drop terminated, wall mounted and then terminated to the appropriate MDF/IDF.

8. Data cabling will be low-voltage wire [blue in color] from the server room MDF or the nearest IDF for cabling to the power poles and into furniture internal raceways for each desk station. This type of run will be called “Data” Drop.

9. Data Cables will be run above the drop ceiling in appropriate devices or raceways.

10. Data cables will be connected to the punch down at each desk station and patch panel.

11. Where appropriate [see below], Contractor will supply low-voltage [white in color] data drops terminated for RJ-11 Phone Service, home-run to Building A DMARC terminated to a designed 66 Block, tested and labeled. Contractor will supply the 66 Block and associated hardware at the workstation side capable of inserting an RJ-11 silver satin cable into the jack. This type of run will be called “Phone” Drop.

12. All cables will be tested for proper wiring and labeling [both ends of cable AND wall plate] by the contractor as required by FEMA IT.

13. Contractor to re-wire all existing wall jacks to the new patch panel.

14. On all cabling, FEMA IT will test for final acceptance.

15. FEMA IT Department will make the final cable cross-connect in switch ports to jacks to activate each desk station. FEMA will supply its own cross connect patch cables per MDF and IDF as well as supplying patch cables at its workstations. Disconnect and clean-up of all existing cabling.

16. Contractor will supply (2) concurrent fiber runs between the MDF and other IDFs [1, 2, 3, 4], specified by FEMA IT. Contractor will supply (4) concurrent fiber runs between MDF and IDF 5 [Building B].

Contractor will supply two concurrent fiber runs between IDF 5 and IDF 6. Fiber will be terminated by the

Austin, TX

Contractor with Fiber Patch Panels in each IDF and one Master Fiber Patch Panel in the MDF. Contractor will test and properly label each fiber run in each Patch Panel.

17. Twelve-Strand Fiber will be installed per IDF into a one inch innerduct [conduit] and will include drag-string [tape] terminated to a fiber patch panel using LC Connectors, OM4.

18. Contractor to provide low-voltage [yellow in color] wiring ceiling drops for wireless access points. Wire will be terminated back to the appropriate MDF or IDF.

19. Contractor to supply each IDF with one two-post rack, mounted to the floor. The MDF will NOT require two-post racks.

20. Contractor will supply 48 Port Patch Panels in the MDF and associated IDFs, details to follow per Building Section.

6. DELIVERABLES AND DELIVERY SCHEDULE

The contractor shall start the Project as soon as contract is awarded. The contractor shall complete the project within 30 calendar days from the time contract is awarded.

Work Detail computer network install 280 cubicles July 25- Aug 26

7. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION

All information shall be deemed to be For Official Use Only and not permitted to be copied or removed from premise (FRC).

8. PLACE OF PERFORMANCE

All work will be performed at: 11000 IH 35N, AUSTIN, TX

9. PERIOD OF PERFORMANCE

The period of performance for this award shall not exceed 30 calendar days following contract award.

10. SECURITY

The FEMA 11000 IH 35N, AUSTIN, TX. Personnel requiring access must provide government-issued photo identification such as a state driver’s license when they arrive every day. Onsite access during the project period shall be coordinated through the Project Officer.

1. PROJECT TITLE
2. BACKGROUND
This location is the former Golfsmith Corporate facility. This single story office/tech building has been renovated multiple times.
3. SCOPE
The purpose of this project is to have low-voltage connections installed to provide “computer” network connectivity to new modular furniture workstations, renovated offices and multi-function devices as provided on the attached floor plan. The contra...
4. APPLICABLE DOCUMENTS
5. SPECIFIC TASKS
6. DELIVERABLES AND DELIVERY SCHEDULE
7. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION
8. PLACE OF PERFORMANCE
9. PERIOD OF PERFORMANCE
10. SECURITY