Response to RFQ Questions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions-RFQ Historic Damage

Question NumberQuestion/CommentVendor RecommendationFEMA Response
1Is this a new requirement or is there an incumbent vendor? If available, please provide a contract number.This is a new requirement.
2When will the Contractor receive the locations of the final sites (estimated at 1000 sites)Vendor recommends a cutoff date for the final list of sites.Final sites will be provided by April 24th. Any sites received after that date will not be the responsibility of the Contractor.
3What happens if the Contractor is unable to gain access to a site? Will the contractor be penalized?The contractor will confer with the property owner to gain access, if the site is not in public ownership. If access is not granted, Contractor will provide best estimate possible from observation from publicly-accessible location and document the effort.
4a. Can Invoices be sent before there is a final work product? b. What are the standards for invoicing on a periodic basis? c. Can invoices be submitted on a bi-weekly basis?The Firm-Fixed Price is per assessment. Invoices should be submitted at the end of the period of performance since it will be less than 30 days. (Due date 5/6/2018). Invoices should include the number of site assesments completed.
5Does the estimate for the site call for Hazardous Materials? (i.e. asbestos, lead,etc.)Yes, please include.
6Is RS MEANS considered a federal standard for costing damage to historical structures?Yes. Use the current tables for Puerto Rico.
7There are 11 historical districts in Puerto Rico. FEMA only lists 9. Will all 11 be included in the requirement?The OECH/SHPO and National Park Service terms have evaluated the Aguirre and San German districts. Old San Juan is under evaluation now and will not require evaluation. Other Districts under ICP regulatory structure are the intended evaluation districts.
8What is the standard to build to "mothball"? Original conditions?Reference is : https://www.nps.gov/tps/how-to-preserve/briefs/31-mothballing.htm
9Is it possible to talk to the COR in the field?Yes. A COR will be available by Facetime/Phone during the extent of the project. Project rep will be available on-site after April 16th.
10Is there any other way to contract out this work on a per hour basis?At this time, FEMA is not considering an alternative contracting strategy.
11Aside from General Liability and Workers Compensation, is there any other type of insurance requirement?Not to our knowledge.
12Do the cost estimates have to follow a specific formant, or be in a specific format for FEMA, or can the contractor submit his/her own format.Yes. The format of the CLIN structure in the RFQ must be used when submitting quotes.
13Under FAR 52.226-3 – Disaster or Emergency Area Representation which is listed in the RFQ - will the government consider an offer if they have an SBA approved bonafide office in San Juan PR?FEMA will consider all offers that meet the requirements under FAR 52.226-3. Contractors must represent that it has its main operating office in the disaster area declared under DR-4339-PR; and that office generated at least half of the gross revenues and employed at least half of the permanet employees (FAR Clause 52.226-3) PAGE 9 of the RFQ must be completed and submitted with the vendor quote.
14SOW-Page 2 states that 22 historic properties have damage assessments. Can you provide copies of these assessments?One example report was provided as part of the RFQ. Additional assessments will be provided to the selected contractor.
15Do the reports have to be paper, electronic, either?Commonly-used electronic formats (Word, Adobe .pdf or Pagemaker, Open Document Format [.odt]) are acceptable.
16Can the teams in the field meet/operate out of the FEMA Operations centers that are in the 9 different historical areas (to act as a rallying point, and to send data)?Yes.
17RFQ - Page 2 states "…multiply the unit price by the quantity to obtain the total price." What is the Quantity? Is it the number of buildings higlighted in Attachment 3?The Quantity = 1,000 assessments
18What does the Final Historic Property Damage Assessment Report (0002) consist of? Is it the damage assessment (0001) PLUS the cost estimate?The Final report will include damage assessments and repair cost estimates.
19Do vendors have to use the RS Means format included in page 33 of Attachment 2 for the detailed cost estimate?Damage assessments must meet Federal Damage assessment requirements. RS Means is one format that meets these standards.
20It was suggested in the FBO documentation to use Architectural students to support this effort. Is there an agreement already in place with a potential group of assessors?Not to our knowledge.