This document is a Statement of Work (SOW) for the installation of fiber optic cables in the student dormitories at the Center for Domestic Preparedness (CDP) in Anniston, AL. The project aims to replace degraded multimode fiber with single-mode fiber to meet system requirements and enhance network connectivity.
The key details include: the technical specifications require single-mode fiber optic cables configured in dual 96-strand trunks with each building receiving 24 fibers; the work must follow industry best practices and standards; the installation will primarily utilize existing conduit systems and pathways; the project has an estimated 8-week completion timeline; the contractor must adhere to quality assurance measures and deliver documentation including installation/testing reports, fiber route/termination maps, and photographic evidence. This is a 100% small business set-aside contract issued by the Federal Emergency Management Agency (FEMA) Preparedness Section.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Installation of Fiber Optic Cables Student Dorms
Center for Domestic Preparedness
1. PROJECT OVERVIEW
This Scope of Work (SOW) details the plan for upgrading and expanding the fiber optic network infrastructure at the Center for Domestic Preparedness Student Dormitories. The project will replace degraded OM fiber with Single Mode fiber to meet specific system requirements to accommodate the ongoing Verizon Cellular Amplifier project and enhance overall network connectivity.
2. TECHNICAL SPECIFICATIONS
2.1. Type of Fiber: All new installations will utilize Single Mode fiber optic cables.
2.2. Cable Configuration: The project includes the deployment of dual 96-strand Single Mode fiber trunks from Building 21.
2.3. Building Connections: Each building will receive 24 Single Mode fibers to support connectivity needs and future expansion.
3. DETAILED WORK REQUIREMENTS
3.1. Industry Standard: Use of high-quality Single Mode fiber optic cables and components compliant with ANSI/TIA/EIA standards.
3.2. Best Practices: Installation must follow industry best practices, ensuring minimal signal loss and optimal network performance.
3.3. Environmental Protection: Implement measures to minimize environmental impact during installation, including proper management of waste and debris.
4. SCOPE OF INSTALLATION
4.1. Conduit Use and Directional Routing:
4.1.1. Clockwise Path: One trunk will extend from Building 21, following a clockwise route to Buildings 19, 28, 78, and 210. This routing strategy is designed to ensure direct connectivity and the elimination of potential points of failure.
4.1.2. Counter-Clockwise Path: The second trunk will extend from Building 21, taking a counter-clockwise route to Buildings 171, 277, 294, and 322. This approach maximizes network coverage and redundancy.
4.1.3. Building Integration: The project emphasizes direct integration of buildings into the fiber network, eliminating reliance on intermediary devices and enhancing network reliability.
4.1.4. Existing Infrastructure: The installation will primarily utilize existing conduit systems and pathways to minimize the need for new construction and ensure efficient project execution.
Attachment 1 Statement of Work
5. SCHEDULE
5.1. Project commencement and completion dates, along with interim milestones, are to be agreed upon initiation, ensuring minimal disruption to campus operations (8 weeks estimated).
6. STANDARDS AND COMPLIANCE
6.1. Compliance with Standards: Installation will adhere to ANSI/TIA/EIA standards, local building codes, and all applicable safety requirements to ensure the highest quality and safety of the network installation.
6.2. Safety Requirements: Emphasis on strict adherence to safety protocols, including the use of appropriate personal protective equipment (PPE) and adherence to all OSHA guidelines.
7. DELIVERABLES
7.1. Installation and Testing Reports: Documentation of the installation process and testing results for each segment of the network.
7.2. Termination: Fiber optic cable termination at all specified points, including Buildings 21, 19, 28, 78, 210, 171, 277, 294, and 322, using LC connectors. Each termination point must be clearly labeled and documented.
7.3. Fiber Route and Termination Points Map: A detailed map showing the proposed routes of the dual 96-strand Single Mode fiber optic trunks emanating from Building 21, including both the clockwise and counter-clockwise paths to the designated buildings, will be provided. This map will also detail the specific termination points within each building, the location of the 24-port patch panels (or the 192-port patch panel in the case of Building 21), and any relevant network infrastructure elements (e.g., existing conduits, manholes).
7.4. Photographic Documentation: As part of the project deliverables, photographic documentation of key stages of the installation process, especially the termination points and any unique construction challenges, will be included. This visual record will support quality control, provide a basis for future troubleshooting, and document compliance with project specifications.
7.5. Project Completion Summary: A final report summarizing the project outcomes, challenges encountered, and recommendations for future network maintenance and expansion.
8. QUALITY ASSURANCE
8.1. The contractor shall adhere to established quality assurance and control measures, ensuring that all fiber optic installations meet the project specifications and industry standards. This includes conducting routine inspections and testing of the fiber optic cables and connections to verify their proper installation and functionality. The aim is to ensure that the work is completed correctly the first time, minimizing the need for rework and ensuring the reliability of the network upon project completion.
9. SECTION 508 REQUIREMENTS
Section 508 of the Rehabilitation Act, as amended by the Workforce Investment Act of 1998 (P.L. 105-220) requires that when Federal agencies develop, procure, maintain, or use information and communication technology (ICT), it shall be accessible to people with disabilities. Federal employees and members of the public who have disabilities must have access to, and use of, information and data that is comparable to people without disabilities.
Item that contains ICT: Installation of Fiber Optic Cables Student Dorms
9.1. E202.5 ICT Functions Located in Maintenance or Monitoring Spaces Where status indicators and operable parts for ICT functions are located in spaces that are frequented only by service personnel for maintenance, repair, or occasional monitoring of equipment, such status indicators and operable parts shall not be required to conform to the Revised 508 Standards.
9.2. E206.1 General. Where components of ICT are hardware and transmit information or have a user interface, such components shall conform to the requirements in Chapter 4.
9.3. E208.1 General Where an agency provides support documentation or services for ICT, such documentation and services shall conform to the requirements in Chapter 6.
9.4. E302 Functional Performance Criteria
9.5. 302.1 Without Vision. Where a visual mode of operation is provided, ICT shall provide at least one mode of operation that does not require user vision.
9.6. 302.2 With Limited Vision. Where a visual mode of operation is provided, ICT shall provide at least one mode of operation that enables users to make use of limited vision.
9.7. 302.3 Without Perception of Color. Where a visual mode of operation is provided, ICT shall provide at least one visual mode of operation that does not require user perception of color.
9.8. 302.4 Without Hearing. Where an audible mode of operation is provided, ICT shall provide at least one mode of operation that does not require user hearing.
9.9. 302.5 With Limited Hearing. Where an audible mode of operation is provided, ICT shall provide at least one mode of operation that enables users to make use of limited hearing.
9.10. 302.6 Without Speech. Where speech is used for input, control, or operation, ICT shall provide at least one mode of operation that does not require user speech.
9.11. 302.7 With Limited Manipulation. Where a manual mode of operation is provided, ICT shall provide at least one mode of operation that does not require fine motor control or simultaneous manual operations.
9.12. 302.8 With Limited Reach and Strength. Where a manual mode of operation is provided, ICT shall provide at least one mode of operation that is operable with limited reach and limited strength.
9.13. 302.9 With Limited Language, Cognitive, and Learning Abilities. ICT shall provide features making its use by individuals with limited cognitive, language, and learning abilities simpler and easier.
9.14. 602.1 General. Documentation that supports the use of ICT shall conform to 602.
9.15. 603.1 General. ICT support services including, but not limited to, help desks, call centers, training services, and automated self-service technical support, shall conform to 603.
10. PERIOD OF PERFORMANCE: Approximately 8 weeks from project start.
11. QUALITY CONTROL:
11.1. The contractor shall adhere to established quality assurance and control measures, ensuring that all fiber optic installations meet the project specifications and industry standards.
This includes conducting routine inspections and testing of the fiber optic cables and connections to verify their proper installation and functionality. The aim is to ensure that the work is completed correctly the first time, minimizing the need for rework and ensuring the reliability of the network upon project completion.
12. GOVERNMENT-FURNISHED EQUIPMENT: Not Applicable
13. PLACE OF PERFORMANCE: Center for Domestic Preparedness’ Student Dormitory Complex, Anniston, Al.
14. SECURITY: Unclassified - For the successful execution of this 6 to 8-week project, all contractor personnel requiring access to CDP federal facilities must undergo and pass background checks through the National Crime Information Center (NCIC) and cleared for access. Temporary Vendor badges will be issued to cover the length of the project.
File details come from the government source that posted it. Updated .