Attachment_9_-_Quality_Assurance_Surveillance_Plan.pdf
PDF 709 KB Posted
- Solicitation number
- 70CDCR19R00000002
- Issued by
-
Immigration and Customs Enforcement
About this file
This Quality Assurance Surveillance Plan outlines performance standards and evaluation methods for the Intensive Supervision Appearance Program contract. The contractor must develop a quality control plan and performance management system to self-inspect performance in areas such as transition planning, case management systems, home visits, equipment inventory and staffing ratios. Surveillance methods include record reviews, site visits and system checks. Deficiencies are addressed through contract discrepancy reports and may result in withholdings against monthly invoices up to specified percentages not exceeding 100% according to the functional area and severity of the issue. Resolution procedures and notification requirements are provided.
The related federal contract opportunity is a draft request for proposals for Intensive Supervision Appearance Program IV support services. The solicitation seeks community-based supervision, reporting and monitoring services using GPS or biometric technology for adult aliens in removal proceedings across the nation. Vendors are requested to provide feedback on the draft including likelihood of response. Required services include case management, equipment inventory, home visits, staffing ratios and reporting. The federal agency is Immigration and Customs Enforcement.
Attachment 9 - Quality Assurance Surveillance Plan
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN: INTENSIVE SUPERVISION
APPEARANCE PROGRAM
1.0 Introduction
This Quality Assurance Surveillance Plan (QASP) is based on the premise that the contractor is responsible for complying with all the requirements listed in the Statement of Work (SOW) entitled “Intensive Supervision Appearance Program” as well as its subsequent attachments.
The role of the Government in quality assurance is to ensure performance standards are achieved and maintained. This QASP sets forth the procedures and guidelines Alternatives to
Detention will use in evaluating the technical performance of the service contractor.
1.2 Purpose
This QASP is designed to provide an effective surveillance method to monitor the contractor’s performance relative to the requirements listed in the SOW/Attachments. The QASP illustrates the systematic method the Government (or its designated representative) will use to evaluate the services the contractor is required to furnish.
The purpose of this QASP is to describe the systematic methods used to measure performance and to identify the reports required and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting performance standards as identified in the SOW and its attachments. This QASP is designed to define roles and responsibilities, identify the performance objectives, define methodologies used to monitor and evaluate the contractor’s performance, describe quality assurance reporting, and describing the analysis of quality assurance monitoring results.
1.3 Performance Management Strategy
1.3.1 The contractor shall develop a Quality Control Plan (QCP) which will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, and other performance requirements in the SOW and its attachments. The contractor must develop and implement a performance management system with processes to assess and report their performance to the
COR. The resultant QCP will be made part of the contract.
1.3.2 The COR will monitor performance and determine how the contractor is performing against the performance objectives stated in Section 7.0 - Tasks and Deliverables, of the SOW.
The Government will make decisions based on performance data and notify the contractor of those decisions. If it is determined that the contractor is not completing services and it is deemed negligent/fraudulent, there will be a 2% deduction on total monthly billing for the month in which discrepancies were found. The contractor will be responsible for making required changes in the processes and practices to ensure performance is effectively managed.
2.0 Government Roles and Responsibilities
The following personnel must oversee and coordinate surveillance activities.
2.1 Contracting Officer (CO)
DRAFT
The CO must ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and must safeguard the interests of the United States in the contractual relationship. The CO must also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
2.2 Contracting Officer’s Representative (COR)
The COR is responsible for technical administration of the contract and must assure proper
Government surveillance of the contractor’s performance. The COR must keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
3.0 Definitions
Measures: The method for evaluating compliance with the standards.
Acceptable Quality Level: The minimum level of quality that will be accepted by ICE to meet the performance standard.
Withholding: Amount of monthly invoice payment withheld pending correction of a deficiency. See
Section 6.0 – Methods of Surveillance for information on the percentages of an invoice amount that may be withheld for each functional area. Funds withheld from payment are recoverable (See Sections 4 and
5) if the COR and Contracting Officer confirm resolution or correction and should be included in the next month’s invoice.
Deduction: Funds may be deducted from a monthly invoice for an egregious act or event, or if the same deficiency continues to occur in accordance with the percentages listed in Section 6.0 – Methods of Surveillance. The contractor will be notified immediately if such a situation arises. The Contracting
Officer in consultation with ATD will determine the amount of the deduction. Amounts deducted are not recoverable.
4.0 Failure to Meet Performance Standards
The Contracting Officer may take withholdings or deductions against the monthly invoices for unsatisfactory performance documented through surveillance of the contractor’s activities gained through site inspections, reviews of documentation, interviews and other feedback. As a result of its surveillance, the contractor will be assigned the following rating relative to each performance standard:
Rating Description
Acceptable Based on the measures, the performance standard is demonstrated.
Deficient Based on the measures, compliance with most of the attributes of the performance standard is demonstrated or observed with some area(s) needing improvement. There are no critical areas of unacceptable performance
Using the above standards as a guide, the Contracting Officer will implement adjustments to the contractor’s monthly invoice as prescribed in Section 6.0 – Methods of Surveillance.
Rather than withholding funds until a deficiency is corrected, there may be times when an event or a deficiency is so egregious that the Government deducts (vs. “withholds”) amounts from the contractor’s monthly invoice. This may happen when a significant event occurs, when a particular deficiency is noted multiple times without correction, or when the contractor has failed to take timely action on a deficiency about which he was properly and timely notified.
The amount deducted will be consistent with the relative weight of the functional performance area where the deficiency was noted. The deduction may be a one-time event,or may continue until the contractor has either corrected the deficiency, or made substantial progress in the correction.
Further, a deficiency found in one functional area may tie into another. In no event will the withhold or deduction exceed 100% of the invoice amount.
5.0 Notifications
(a) Based on the inspection of the contractor’s performance, the COR will document instances of deficient or at-risk performance (e.g., noncompliance with the standard) using the Contract Discrepancy Report
(CDR) located at Attachment 9B. To the extent practicable, issues should be resolved informally, with the COR and contractor working together. When documentation of an issue or deficiency is required, the procedures set forth in this section will be followed.
(b) When a CDR is required to document performance issues, it will be submitted to the contractor with a date when a response is due. Upon receipt of a CDR, the contractor shall immediately assess the situation and either correct the deficiency as quickly as possible or prepare a corrective action plan. In either event, the contractor shall return the CDR with the action planned or taken noted. After the COR reviews the contractor’s response to the CDR including its planned remedy or corrective action taken, the COR will either accept the plan or correction or reject the correction or plan for revision and provide an explanation. This process should take no more than one week. The CDR shall not be used as a substitute for quality control by the contractor.
(c) The COR, in addition to any other designated ICE official, shall be notified immediately in the event of all emergencies (see Emergency Readiness and Continuity of Operations Plan).
(d) If the COR concludes that the deficient or at-risk performance warrants a withholding or deduction, the
COR will include the CDR in its report, with a copy to the Contracting Officer. The CDR will be accompanied by the COR’s investigation report and written recommendation for any withholding. The
Contracting Officer will consider the COR’s recommendation and forward the CDR along with any relevant supporting information to the contractor in order to confirm or further discuss the prospective cure, including the Government’s proposed course of action. As described in section 5 above, portions of the monthly invoice amount may be withheld until such time as the corrective action is completed, Based on the performance measures, the majority of a performance standard’s attributes are not met.
At-Risk or a deduction may be taken.
(e) Following receipt of the contractor’s notification that the correction has been made, the COR may re-inspect. Based upon the COR’s findings, he or she will recommend that the Contracting Officer continue to withhold a proportionate share of the payment until the correction is made, or accept the correction as final and release the full amount withheld for that issue.
(f) If funds have been withheld and either the Government or the contractor terminates the contract, those funds will not be released. The contractor may only receive withheld payments upon successful correction of an instance of non-compliance. Further, the contractor is not relieved of full performance of the required services hereunder; the Agreement may be terminated upon adequate notice from the
Government based upon any one instance, or failure to remedy deficient performance, even if a deduction was previously taken for any inadequate performance.
(g) The COR will maintain a record of all open and resolved CDRs.
6.0 Methods of Surveillance
The below listed methods of surveillance must be used in the administrative of the QASP. In addition to specific instructions that may be mentioned, the appropriate and standardized form that is to be used for documentation for QA surveillance is the surveillance activity checklist.
Required
Task List
Item No.
Desired
Outcome
Performan ce
Indicator
Performanc e Standard
AQL Surveillance
Method/
Frequency
Withhold or
Deduction if AQL is not met.
1. Transition As required Complete 100% COR Up to 1% per week of delay by 100% of Monitoring approved transition
Transition activities
Plan within 90 days of award
2. Conduct and As required Review and 100% Monthly Up to 10%
Document in 6.9 of update Review of Site
Internal the SOW Quality Program
Quality Control Manager’s
Assurance
Audits
Procedure as required
Internal Audits
3. Develop and
Implement
Case
Management
System
As required in 6.3 of the SOW
Annually within 60 days of exercising contract renewal option or at direction of
CO
99.999
Annual Review of Network
Monitoring
System
Up to 20%
4. Develop and
Implement
Mobile
Application –
Case
Management/
Monitor
System
As required in
Attachment
2 of the
SOW
Annually within 60 days of exercising contract renewal option or at direction of
CO
99.999
Annual Review of Network
Monitoring
System
Up to 20%
5. Create and
Maintain Case
Records
(Electronically and Hard copy)
As required in 6.3 of the
SOW
Daily 99% Quality
Assurance
Site Visit
Up to 10%
6. Conduct
Program
Enrollments
Orientations with
Participants subscribed to
Home Visits and Office
Visits
As required in 6.2 of the
SOW
Daily or as requested
100% Review of Case
Management/Mo nitoring Systems and Quality
Assurance Site
Visit
100% return on service charge
7. Develop
Individual
Service Plans
(ISP) for each
Participant subscribed to
Office Visits
As required in 6.2 of the
SOW
Update ISP at a minimum of each month or at each office visit
100% Quality
Assurance Site
Visit (Review of
Case
Management/Mo nitoring
Systems)
Up to 5%.
8. Conducts
Residence
Verification
As required in 6.2 of the
SOW
As required 99% Review of Case
Management/Mo nitoring Systems and
Quality
Assurance Site
Visit
100% return on service charge and/or up to
5%
9. Conducts
Home Visits
As required in 6.2 of the SOW
As required 99% Review of Case
Management/Mo nitoring Systems and Quality
Assurance Site Visit
100% return on service charge and/or up to 5%
10. Maintain GPS
Equipment
Inventory
As required in
Attachment
As required to fulfill SOW requirement
5% of current active
GPS
opulation
Monthly GPS count
Up to 10%
11. Maintain
Optimal GPS
Performance
As required in
Attachment
As required to fulfill
SOW
requirement
99.999% reliability and up time annually;
no more than 8.76 hours down time annually
Annually Up to 20%
12. Provide
Translator
Services
As required in 6.3 of the SOW
As required 95% Monthly Up to 1%
13. Develop and As required Annually 100% Annually Up to 5%
Enforce in 5.0 of within 60
Contractor the SOW days of
Employee exercising
Standards of contract
Conduct renewal option; 24 hours a day, 7 days a week, and
365 days a year
14. Contractor As Monthly 98% Monthly Up to 1%
Personnel Report required in 4.0 of the SOW
15. Contractor Staff Training Report
As required in 6.8 of the SOW
Monthly or
As
Requested
100% Monthly Up to 1%
16. Reports
Requirements
As required in
Attachment
Requirement s vary by report
99% Annually Up to 1%
17. Staffing to As required Monthly 125:1 Monthly Up to 1%
Participant in 6.0 of the Staffing ratio
Ratio SOW and
Population reports
18. Monthly Program
Review
As required in
7.0 of the SOW Monthly overview of the program
100% Monthly Up to 10%
File details come from the government source that posted it. Updated .