Amendment A0001.pdf

PDF 861 KB Posted

Attached to
CBP Ajo Station Trash Removal Services Federal contract opportunity
Solicitation number
70B03C26Q00000007
Issued by
Department of Homeland Security Customs and Border Protection

About this file

This document is an Amendment (A0001) to a Performance Work Statement (PWS) for Solid Waste and Trash Removal Services for the U.S. Border Patrol Ajo Station in Arizona. The contract covers trash removal services for two locations: the Ajo Station and the Ajo State Route 85 Checkpoint, with specific container requirements including four 6-yard and four 4-yard containers at the station, and seven 35-gallon containers at the checkpoint. The contractor must empty station containers twice weekly and checkpoint containers once weekly, performing pickups between 5:00 a.m. and 5:00 p.m. on weekdays, excluding federal holidays.

The contract period includes a base year from 02/07/2026 to 02/06/2027 and four option years, with option years exercisable at the government's discretion. Performance standards are strict, with zero defects acceptable and potential invoice deductions for missed or late pickups, incomplete container emptying, or sanitation issues. The contract is administered by DHS - Customs & Border Protection's Border Enforcement Contracting Division, with the Contracting Officer being Eric R. Neckel. The amendment specifically clarifies the requirements for trash containers at the Ajo Checkpoint 85, emphasizing that containers must be trash cans measured in gallons, not dumpsters measured in yards.

View the file

Other files for this federal contract opportunity

Other files attached to CBP Ajo Station Trash Removal Services, newest first.
File Type Posted
Questions and Answers - 12-04-25.pdf PDF
Wage Determination No. 20155-5473_Rev.26.pdf PDF
RFQ No. 70B03C26Q00000007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

PAGE OF PAGES

3. EFFECTIVE DATE 5.PROJECT NUMBER (If applicable)2. AMENDMENT/MODIFICATION NUMBER

7. ADMINISTERED BY (If other than Item 6) CODE

FACILITY CODECODE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR(Number, street, county, State & Zip Code)

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NUMBER

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

1. CONTRACT ID CODE

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES Such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).

E. IMPORTANT: Contractor

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) copies to issuing office.

4.REQUISITION/PURCHASE REQUISITION NUMBER

A0001 12/08/2025

DHS - Customs & Border Protection

Border Enforcement Contracting Division 1300 Pennsylvania Ave, NW

Washington DC 20229

DHS - Customs & Border Protection

Border Enforcement Contracting Division

1300 Pennsylvania Ave, NW

Washington DC 20229

70B03C26Q00000007

11/26/2025

1 9 is required to sign this document and return is not

PREVIOUS EDITION UNUSABLE STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

BY

(Signature of Contracting Officer)(Signature of person authorized to sign)

15A NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Eric R. Neckel Contracting Officer

This solicitation is amended as follows:

1. Sections 4.1 and 7 of the Performance Work Statement (PWS) are amended to clarify the requirements for the trash containers for Ajo Checkpoint 85. The changes are shown in red text in the attached amended PWS.

Attachment:

a. Amended PWS

X

Section III: Performance Work Statement (PWS) U.S. Border Patrol Ajo Station

Solid Waste and Trash Removal Services

1. BACKGROUND:

Ajo Station serves as an integral part of U.S. Customs and Border Protection, U.S.

Border Patrol, Tucson Sector. Ajo Station requires solid waste removal and trash pick up as various administrative duties are conducted which generate a considerable amount of waste (trash). Solid waste removal and trash pickup services are required to maintain a clean, healthy and orderly work environment for personnel assigned to the Ajo Station.

2. SCOPE:

The Contractor shall provide solid waste removal services for the Ajo Border Patrol Station and the Ajo State Route 85 Checkpoint, Mile Marker 18, as outlined in this PWS.

The Contractor shall, during the performance of work, comply with direction from on-site Border Patrol personnel regarding access control and basic safety rules when on the premises of the Station or Checkpoint. The Contractor is responsible for its personnel and for familiarizing itself with safety requirements. The Contractor shall advise the Contracting Officer (CO) of any special safety restrictions established so that Government personnel can be notified of these restrictions. The Contractor shall permit safety inspections of all work being performed.

The Contractor shall operate all equipment in a safe, careful, and efficient manner. All equipment shall be in good operating condition and calibrated, if required. Contractor employees supporting this effort shall possess required licenses/certificates as required by Federal, State, and/or local authorities.

The Contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities. The Contractor shall avoid interruptions of Government operations in the performance of this contract. The Contractor is responsible for any Government property lost or damaged as a result of the Contractor's performance of this contract.

3. COMPLIANCE WITH FEDERAL, STATE, AND LOCAL LAW

The Contractor shall comply with all Federal (e.g., OSHA and EPA), State, and local laws, directives, regulations, ordinances, codes, and other orders as applicable to this type of service.

Amendment #A0001

4. SPECIFIC REQUIREMENTS:

The Contractor shall perform the following tasks:

4.1 Task 1 - Container Sizes

The Contractor shall provide trash collection containers of the following sizes and quantities: four 4-yard containers (for Ajo Station), four 6-yard containers (for Ajo Station), and seven 35-gallon containers/cans that are a minimum of 35 gallons (for Ajo Checkpoint 85). The trash containers for Ajo Checkpoint 85 shall be trash cans, not dumpsters, the size of which must be measured in gallons, not yards.

The containers shall have the capability to close all openings to ensure that the trash does not overflow or leak out. The containers shall have lids capable of staying closed during high winds.

4.2 Task 2 – Weekly Trash/Waste Removal

The Contractor shall empty the trash containers two times per week at Ajo Station (Location 1), a minimum of three calendar days apart, and once per week at the Ajo Checkpoint (Location 2). All pickups shall be performed between the hours of 5:00 a.m.

and 5:00 p.m. on the days of the week (Monday-Friday) set forth in the Contractor’s approved schedule (see Section 5, Deliverables and Deliverable Schedule), excluding the Federal holidays listed in Table 1 below. When any such day falls on a Saturday, the preceding Friday is observed. When any such day falls on a Sunday, the following Monday is observed. If trash removal is scheduled to occur on the day of observance of a Federal holiday, the removal shall be completed on the business day either immediately preceding or following the holiday, except as otherwise approved by the CO or COR either in the Contractor’s approved pickup schedule or on a case-by-case basis. Any changes to the schedule must be coordinated and approved by the Contracting Officer’s Representative (COR) before taking effect.

Table 1: Federal Holidays

New Year's Day 1 January Martin Luther King Jr.'s Birthday 3rd Monday in January Presidents Day 3rd Monday in February Memorial Day Last Monday in May Juneteenth Celebration Day 19 June Independence Day 4 July Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans Day 11 November Thanksgiving Day 4th Thursday in November

Christmas Day 25 December

4.3 Task 3 - Equipment and Services

The Contractor shall provide all labor, tools, parts, material, equipment, transportation and incidentals necessary to deliver, set up, and prepare trash containers and remove trash from all Border Patrol locations identified in Section 7. The Contractor shall be responsible for maintaining its equipment in workable condition and shall not be relieved of its responsibility for performance under this contract in the event of an equipment breakdown. Any costs incurred by the Contractor for repairs shall be borne by the Contractor.

4.4 Task 4 - Transportation

The Contractor shall ensure that all drivers follow the directions provided by on-site Border Patrol personnel. The drivers shall report obstructions which interfere with accessing the containers to the on-site Border Patrol personnel.

4.5 Task 5 - Disposal of Solid Waste

The Contractor shall ensure that all solid waste collected is disposed of only at incinerators, landfills, or other facilities that are approved by the Environmental Protection Agency (EPA) as being in conformance with existing Federal, State, and local laws, directives, regulations, ordinances, codes, and other orders relating to safety and health. The Contractor shall provide the location information of the facility that will be utilized for disposal of waste.

4.6 Task 6 - Cleanup of Areas

The Contractor shall not create any litter at loading locations, during transportation, or at disposal locations. The Contractor shall clean up waste and hydraulic fluid leaks or spills caused by the Contractor's equipment while on Government property. Clean-ups shall be performed in compliance with Federal, EPA, State, and local regulations.

5. DELIVERY SCHEDULE:

Within seven (7) calendar days of contract award, the Contractor shall provide a proposed schedule of services that shall include the name of the location and the day(s) of the work week (Monday-Friday) on which services will be performed. Services must be performed on the same day(s) each week unless the scheduled day falls on a federal holiday or a schedule change is approved in accordance with Section 4.2.

6. GOVERNMENT-FURNISHED EQUIPMENT AND INFORMATION:

No Government-furnished property or information will be provided.

The Government will provide adequate space to allow the driver to perform removal of solid waste from each location.

7. PLACE OF PERFORMANCE:

The places of performance for the required services are as follows

Location 01:

Ajo Station 850 North Highway 85 Why, AZ 85321

Number of trash containers:

• Four 6-yard containers emptied two times per week

• Four 4-yard containers emptied two times per week

Location 02:

Ajo Checkpoint 85 State Route 85 Mile Marker 18 Ajo, Arizona 85321

Number of trash containers:

• Seven 35-gallon containers/cans (minimum 35 gallons) emptied once per week

8. PERIOD OF PERFORMANCE:

The period of performance consists of a base year and four option years. The period of performance of each contract period is as follows:

Base Year: 02/07/2026-02/06/2027 Option Year 1: 02/07/2027-02/06/2028 Option Year 2: 02/07/2028-02/06/2029 Option Year 3: 02/07/2029-02/06/2030 Option Year 4: 02/07/2030-02/06/2031

Option years are exercised at the sole discretion of the Government.

9. SECURITY:

a. There are no specific security classification level requirements associated with this procurement action. Information is deemed unclassified.

b. Contractor and subcontractor employees are subject to the terms and conditions of the clause entitled, “Contract Services Not Requiring a Background Investigation (May 2022).” In accordance with the clause, such employees entering a CBP-controlled facility are required to complete requisite pre-screening security checks and are subject to a criminal history and limited background check utilizing the National Crime Information Center (NCIC) system. Additionally, all such employees must be sponsored by a CBP employee or contractor who are in possession of a valid Personal Identity Verification (PIV) card. Contractors and subcontractors who have not been issued a PIV card must be continually escorted upon entering a CBP-controlled facility. The Contractor shall promptly submit the required information for background checks following contract award.

10. SPECIAL CONSIDERATIONS:

10.1 Disclosure of Information

Any information made available to the Contractor by the Government, or its customers shall be used only for the purpose of carrying out the provisions of this contract. This information shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of the contract.

10.2 Use of Sustainable Products and Services

No products or services have been identified as being subject to the requirements of clause 52.223-23, Sustainable Products and Services. However, the Green Procurement Compilation (GPC) available at https://sftool.gov/greenprocurement provides a comprehensive list of sustainable products and services and sustainable acquisition guidance. The Contractor should review the GPC when determining which purchasing programs apply to a specific product or service. If any such programs apply, the Contractor shall comply with the requirements of clause 52.223-23, Sustainable Products and Services.

10.3 Changes to the PWS

No changes to this PWS or cost increases shall be incurred without written prior approval of the Contracting Officer (CO) as coordinated by the COR. Any changes or cost increases will not take effect until the CO executes a written modification. See contract clause entitled “Contracting Officer’s Authority.”

11. Points of Contact

All contract questions and concerns shall be directed to the points of contact designated below. The Contracting Officer is the only individual with the authority to modify this contract.

Contracting Officer (CO)

Name: Eric Neckel Division/ Department: Border Enforcement Contracting Division – Pacific Branch Title: Contracting Officer Phone: 520-407-2804 Email: Eric.R.Neckel@cbp.dhs.gov

Contracting Officer Representative (COR):

To be provided at time of contract award.

12. PERFORMANCE REQUIREMENTS SUMMARY

The Contractor shall perform in accordance with the following performance standards and Acceptable Quality Levels (AQLs). Failure to meet the AQLs will result in invoice deductions in the amounts specified.

a. Refuse Removal Services Performance Requirements Summary

Refuse Removal Performance Objectives

Monitoring Method

Performance Standards

Acceptable Quality Level

(AQL)

Invoice deduction for failing to meet

AQL

a. Regular refuse removal

Customer Complaints, Customer Survey, and Periodic and Random Inspections

1. Trash removal performed on time in accordance with approved pickup schedule.

2. All refuse removed from dumpsters

3. No refuse overflow.

Zero defects a) If one or more pickups is missed, the charges for that month shall be prorated based on the number of pickups made on time relative to the number of required pickups for that month.

4. Sanitary conditions maintained.

5. Odor-free environment maintained

b) If one or more pickups is completed late, or if services performed contain one or more defects, the Contractor shall deduct an amount equal to the daily price of refuse removal for each calendar day that the defect remains until it is remedied, beginning on the day that the Contractor is notified of the defect.

Note: The identified monitoring methods listed in 12(a) are merely the anticipated methods and are subject to change at any time at the Government’s sole discretion.

The “daily price” is defined as the monthly refuse removal price divided by the number of calendar days in a given month. For example, if the monthly price were $5,000 per month and there were 31 days in a month, the daily price would be equal to:

$5,000.00/31 = $161.29.

Examples:

a. If the Contractor missed one pickup and 12 pickups were required in that month, the required invoice deduction would be $5,000 x (1/12) = $416.67.

b. If the Contractor made a pickup two days late, the required invoice deduction would be: $161.29 x 2 days = $322.58.

c. If the Contractor spilled trash around a dumpster or failed to empty a dumpster, and this defect was not remedied for five calendar days, the invoice deduction would be calculated as follows: $161.29 x 5 days = $806.45.

13. INVOICE DEDUCTIONS FOR DEFICIENT CONTRACT PERFORMANCE

The Contractor’s monthly invoice shall account for any payment deductions due to failure to meet the Acceptable Quality Levels (AQLs) in the Performance Requirements Summary (see Section 12).

Upon receipt of the monthly invoice, the Government COR will compare the Contractor’s proposed deductions, if any, to Government and Contractor records. A record of any discrepancy in deduction amount will be submitted to the Contractor in writing.

The Contractor may, within ten (10) business days of receipt of the written discrepancy notice, present in writing to the CO and COR the reasons why the discrepancy exists and why any or all the proposed deductions are or are not warranted. Reasons must be solidly based and must provide specific facts that justify reconsideration and adjustment of the proposed amount to be withheld. The Contractor’s failure to respond within the ten (10) day period will be considered acceptance of the Government’s proposed payment deduction(s).

Monthly payments will not be delayed pending resolution of disputes regarding proposed payment deductions. Monies for proposed payment deductions will be withheld pending the final decision from the Contracting Officer concerning disputed defects.

The taking of payment deductions does not waive or limit any right of the Government under any default, termination, or inspection clause. In addition, the Government reserves the right to seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services, over and above the deductions/disincentives authorized by the Performance Requirements Summary.

Depending on the Contractor's overall performance (for example, repeated instances of nonperformance or unsatisfactory performance), the Government may issue a Cure Notice or Show Cause letter, which may lead to termination of the contract.

File details come from the government source that posted it. Updated .