702575-event.pdf

PDF 279 KB Posted

Attached to
DFCM Construction-Pre-Qualified General Contractors-Big Water Lake Powell Improvements-19220520
Solicitation number
JJ19013
Issued by
Kane County, Utah

About this file

This is an Invitation for Bid (IFB) issued by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Big Water Lake Powell Improvements project for the Division of Wildlife Resources, located in Big Water, Utah. The project is soliciting bids from pre-qualified general contractors, with a construction cost estimate of $213,000.00. The bid opening is scheduled for 1/23/2019 at 3:00 PM MDT, and only firms pre-qualified during Stage I of the Request for Solicitation (RFS) are allowed to bid. The service line items include a base bid and an alternate bid (Add Alt #1) for work described in drawing sheet AE102, with both line items to be submitted as lump sum quantities.

The bid requires several prerequisites, including submission of a subcontractor's list, compliance with liquidated damages terms, meeting a specific completion date, attending a mandatory pre-bid meeting, and providing a bid bond. Bidders must also answer required questions about the number of addendums, business organization type, contractor's license number, firm's legal name and address, and provide a point of contact. Attached to the bid are two addendums, instructions and subcontractor list form, solicitation documents, approved drawings and specifications, and a pre-bid meeting attendance log. The project is funded through the State of Utah and is specifically managed by the Division of Facilities Construction and Management.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DFCM Construction-Pre-Qualified General Contractors-Big Water Lake Powell Improvements-19220520 DFCM Construction-Pre-Qualified General Contractors-Big Water Lake Powell Improvements-19220520

Open 1/3/2019 3:00 PM MDT Type Invitation for Bid

Close 1/23/2019 3:00 PM MDT Number JJ19013 Currency US Dollar

Sealed Until 1/23/2019 3:00 PM MDT

Contacts

Rob Robinson rdrobinson@utah.gov

Commodity Codes

Commodity Code Description

99901 DFCM Division Facilities and Construction and Managment

72120 Nonresidential building construction services including commercial and office building new construction services and construction services and renovation and repair services

Description

INVITATION TO BID

ONLY FIRMS PRE-QUALIFIED DURING STAGE I OF THE RFS ARE ALLOWED TO BID ON

THIS PROJECT

The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the construction of the following project:

BIG WATER LAKE POWELL IMPROVEMENTS

DIVISION OFWILDLIFE RESOURCES – BIG WATER, UTAH

DFCM PROJECT NO. 19220520

Project Description: See Project Description on page 4 for contact information and list of pre-qualified contractors.

Construction Cost Estimate: $213,000.00

Required to View Event

Prerequisites Required to Enter Bid

25 January 201925 January 2019 mailto:rdrobinson@utah.gov mailto:rdrobinson@utah.gov mailto:rdrobinson@utah.gov

1. Subcontractor's List Due

2. Liquidated Damages

3. Completion Date

4. Mandatory Pre-bid Meeting

5. Pricing

6. Bid Bond

Buyer Attachments

1. DFCM Addendum No. 2 - Revised Project Schedule

2. DFCM Addendum No. 1

3. Instructions & Subcontractors List Form

4. Solicitation-19220520

5. Approved Drawings

6. Approved Specs

7. Pre-Bid Meeting Attendance Log

Questions Required Questions

1.1 # of DFCM Addendums

1.2 Business Organization Type

1.3 Contractor's License #

1.4 Firms legal name and address

1.5 Contractor Point of Contact-name, phone number and email.

25 January 201925 January 2019 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-749853161DFCM%20Addendum%20No.%202%20-%2019220520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=wj19P83wJvBs%2FfWfVHCvEvbrXZM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-749853161DFCM%20Addendum%20No.%202%20-%2019220520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=wj19P83wJvBs%2FfWfVHCvEvbrXZM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-749713824DFCM%20Addendum%20No.%201%20-%2019220520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=dYuTjF4KbR0sZUOGVMAknjdk%2BKA%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-749713824DFCM%20Addendum%20No.%201%20-%2019220520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=dYuTjF4KbR0sZUOGVMAknjdk%2BKA%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-635438782Subcontractor%20List%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=T6%2F5IXdmKmNmpIj%2BR30%2FBkjrKCY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-635438782Subcontractor%20List%20Form.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=T6%2F5IXdmKmNmpIj%2BR30%2FBkjrKCY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-745424604Solicitation-Big%20Water%20Lake%20Powell%20Improvements-19220520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=cyLsVxo9oYnxN8gPIsjTnXUKTI8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-745424604Solicitation-Big%20Water%20Lake%20Powell%20Improvements-19220520.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=cyLsVxo9oYnxN8gPIsjTnXUKTI8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-74542422719220520-BIG-WATER-LAKE-POWELL-IMPROVEMENTS-Stamped-Plans.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=Lfi9O3o6POH47PfEMPa4MHP%2FdFY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-74542422719220520-BIG-WATER-LAKE-POWELL-IMPROVEMENTS-Stamped-Plans.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=Lfi9O3o6POH47PfEMPa4MHP%2FdFY%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-74542462819220520-BIG-WATER-LAKE-POWELL-IMPROVEMENTS-Stamped-Specs.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=ATK7kL0lahxJTtk7Q7HskK7UBCo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-74542462819220520-BIG-WATER-LAKE-POWELL-IMPROVEMENTS-Stamped-Specs.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=ATK7kL0lahxJTtk7Q7HskK7UBCo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-752766130Attendance%20Log.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=daOXLw37T2bgvLc5JgMCX2VSXbo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/702575-752766130Attendance%20Log.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1611522724&Signature=daOXLw37T2bgvLc5JgMCX2VSXbo%3D

Product Line Items Product Line Items

There are no Items added to this event.

Service Line Items Service Line Items

# Item Name, Commodity Code, Description Allow Alternates Qty. UOM Requested Service Delivery

S1 Base Bid 1 LS - Lump Sum

S2 Add Alt #1 1 LS - Lump Sum

All work described by key note 07.03 on drawing sheet AE102

25 January 201925 January 2019

File details come from the government source that posted it. Updated .