70133 - Fort Smith GSA Elevator Modernization - Waste Mgmt Plan - AR0021ZZ.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Amendment 001 - Elevator Modernization, Isaac Parker Federal Building and Courthouse, Fort Smith, AR
- Solicitation number
- 47PH0522R0029
About this file
This document provides details for a federal construction contract opportunity to modernize elevators in the Isaac Parker Federal Building and US Courthouse in Fort Smith, Arkansas. The General Services Administration is seeking proposals to modernize one existing traction passenger elevator. The scope of work involves completing the modernization within 365 calendar days, which includes 45 days for security clearances and pre-work activities. Liquidated damages are $250 per day for late completion. The estimated value of the contract is between $500,000 and $1,000,000. Davis Bacon wage determinations apply. Proposals are due by May 10, 2022 and must include pricing using the provided bid schedule form. The awarded contract will have a 120-day guarantee period. Evaluation criteria are technical approach, experience, schedule, past performance, and preventative maintenance approach. A pre-solicitation site visit will be held on April 20, 2022.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
: +christopher.clever@gsa.gov +walter.tersch@gsa.gov
(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.
-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.
-Christopher Clever - PCBL That's correct.
| -Jake Begnaud - WPIDBB | Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | Waste Diversion Report (Final) : | ||||||
| The general info in these gray cells replicates onto the Report tabs. | ||||||||||
| Project Name: | Fort Smith GSA Elevator Modernization | Fort Smith GSA Elevator Modernization | Fort Smith GSA Elevator Modernization | ECC (estimated construction cost): | Project Manager: | Lauren Young | ||||
| ePM/ePMX Project # : | 70133 | |||||||||
| Project Short Description: | FY22 Baseline Project. Elevator Modernization | FY22 Baseline Project. Elevator Modernization | FY22 Baseline Project. Elevator Modernization | FY22 Baseline Project. Elevator Modernization | FY22 Baseline Project. Elevator Modernization | FY22 Baseline Project. Elevator Modernization | PM email or phone: | lauren.j.young@gsa.gov | ||
| gBUILD Project # : | ||||||||||
| Building Number: | AR0021ZZ | AR0021ZZ | AR0021ZZ | Service Center / Field Office: | P07250A1 | P07250A1 | Budget Activity: | (list all applicable) | RWA # : | RAR10542 |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 50% | 0 | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |
File details come from the government source that posted it. Updated .