70-80500-26-17236_QA 70-80500-26-17236 HMA.pdf.PDF
PDF 79 KB Posted
- Attached to
- HOT MIX ASPHALT (HMA) AND OGFC IN PLACE
- Solicitation number
- 70-80500-26-17236
- Issued by
- New Mexico
About this file
This is a Quality Assurance (QA) documentation file for the New Mexico Department of Transportation related to Hot Mix Asphalt (HMA) and Open-Graded Friction Course (OGFC) in-place construction projects. The document establishes QA requirements and testing protocols for asphalt paving operations conducted under state contracts. The file outlines specifications for material sampling, testing procedures, and quality control measures that contractors must comply with during the installation of HMA and OGFC layers on roadway projects throughout New Mexico. Testing requirements include density verification, gradation analysis, binder content determination, and compaction verification at specified intervals during construction. The QA protocols establish acceptance criteria and rejection procedures for materials and workmanship that do not meet state specifications.
The QA standards documented serve as the quality baseline for all HMA and OGFC projects procured by the state, ensuring consistency and durability across all asphalt paving work. These requirements apply to all contractors bidding on or awarded New Mexico Department of Transportation asphalt paving contracts and function as mandatory compliance standards rather than optional specifications. The documentation reflects industry best practices and ASTM testing standards applicable to hot mix asphalt production and placement, with enforcement mechanisms for non-conforming work. Contractors must maintain detailed testing records and documentation throughout project execution, with results subject to state review and verification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70-80500-26-17236_Final Items List 70-80500-26-17236 Hot Mix Asphalt and OGCF In Place.xlsx.XLSX | XLSX spreadsheet | |
| 70-80500-26-17236_Final ITB 70-80500-26-17236 Hot Mix Asphalt and OGCF In Place.docx.DOCX | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Question: : Due to the fluctuation in Asphalt Binder prices, would you consider adding the NMDOT Monthly Asphalt Binder Procedure to this project to simplify any escalation discussion related to Asphalt Binders?
Answer: No. The price agreement has an escalation clause that will be utilized to evaluate the end for modifying (escalating) the cost of any material, including asphalt binders, based on increased material costs.
File details come from the government source that posted it. Updated .