7-TLH FAA Tech Ops Building - Bid Plans.pdf
PDF 9 MB Posted
- Attached to
- TLH FAA TECH OPS BUILDING
- Solicitation number
- IFB-053-26-RR
- Issued by
- Leon County, Florida
About this file
Summary
These are bid documents and preliminary construction plans for the City of Tallahassee's FAA Technical Operations Support Building project at Tallahassee International Airport in Florida. The project involves the construction of a 2,552 square foot metal storage building and associated site work, including site preparation, grading, drainage, fencing, electrical service, concrete sidewalks, and parking areas. The project is located within an active airport operations area with specific FAA safety and security requirements. The site encompasses approximately 7,216 square feet of disturbance area, with work divided into Phase 0 (mobilization, permitting, and planning) and Phase 1 (construction activities). The documents include detailed specifications for erosion control, stormwater pollution prevention, utility coordination, construction sequencing, and compliance with 2023 Florida Building Code requirements. Work is to be performed during daytime hours with strict adherence to airport operational protocols, including Foreign Object Debris (FOD) management, aircraft safety clearances, and security badge requirements for personnel accessing the airport operations area.
The construction contract is structured as a lump sum agreement with all earthwork, excavation, material hauling, foundation installation, building components, and associated labor included in a single building cost. The contractor is responsible for obtaining all necessary permits, including City of Tallahassee building permits and NPDES stormwater permits, with costs incidental to mobilization and the lump sum price. A Contractor Quality Control Program (CQCP) must be submitted 14 days prior to work commencement, and a Contractor Security Safety Officer (CSSO) must be designated to coordinate daily safety meetings and airport compliance. The contractor must coordinate with the Resident Project Representative (RPR) throughout all phases, maintain a 24-hour emergency contact list, and comply with extensive FAA safety requirements including aircraft movement area restrictions, equipment height limitations subject to FAA Form 7460-1 approval, and stringent debris management protocols due to proximity to active runways and taxiways.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
SURVEYOR
WANTMAN GROUP, INC.
2316 KILLEARN CENTER BLVD., SUITE 100
TALLAHASSEE, FL 32309
PHONE: (850) 907-6872
CONTACT: JEREMIAH SLAYMAKER
TM
BID DOCUMENTS
FEBRUARY 2026
PREPARED BY:
N.T.S.
PROJECT AREA
KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308
CONTACT: CONNOR CHAMBLISS, FL P.E. NO. 88587
850-553-3500
VICINITY MAP
N.T.S.
NORTH
144124113
TALLAHASSEE INTERNATIONAL AIRPORT (TLH)
FAA TECHNICAL OPERATIONS SUPPORT BUILDING
TALLAHASSEE, FLORIDA
KIMLEY-HORN
PROJECT NUMBER
CITY OF TALLAHASSEE
PROJECT NUMBER 25314
PROJECT NUMBERS
PROJECT LOCATION
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C000
144124113
FEBRUARY 2026
KDH
CAC
KDH
COVER SHEET
DATE
AS SHOWN
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© 2026 KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
BID DOCUMENTS
CITY OF TALLAHASSEE, FLORIDA
PROJECT LOCATION
SHEET INDEX
SHEET NUMBER SHEET TITLE
C000 COVER SHEET
C001 GENERAL NOTES
C002 SAFETY AND SECURITY NOTES
C003 CONTRACT LAYOUT
C004 GEOTECHNICAL BORING PLAN
C100 PROJECT SURVEY
C200 DEMOLITION PLAN
C300 EROSION PLAN
C310 EROSION DETAILS
C400 SITE PLAN
C410 SITE DETAILS
C411 ELECTRICAL DETAILS
C412 FENCE DETAILS
C413 FENCE DETAILS
C500 GRADING AND DRAINAGE PLAN
S100 BUILDING PLAN
GEOTECHNICAL ENGINEER
ENVIRONMENTAL AND GEOTECHNICAL SPECIALISTS
370 OFFICE PLAZA DR.,
TALLAHASSEE, FL 32301
PHONE: (850) 386-1253
CONTACT: TOM HAYDEN, P.E.
BY
DATE
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C001
144124113
KDH
CAC
KDH
GENERAL NOTES
FEBRUARY 2026
GENERAL NOTES
1. CONTRACTOR SHALL SUBMIT A CONTRACTOR QUALITY CONTROL PROGRAM
(CQCP) FOR ENGINEER'S REVIEW AND ACCEPTANCE 14 DAYS PRIOR TO THE
START OF WORK. THE CQCP SHALL INCLUDE THE CONTRACTOR'S PROGRAM OF
QUALITY CONTROL FOR ALL ITEMS OF WORK PER THE CONSTRUCTION
SPECIFICATION. A CONTRACTOR QUALITY CONTROL PROGRAM ADMINISTRATOR
(CQCPA) SHALL BE DESIGNATED BY THE CONTRACTOR AND APPROVED BY THE
ENGINEER. ALL COSTS ASSOCIATED WITH PREPARING THE CQCP AND
PERFORMANCE OF QUALITY CONTROL TESTING SHALL BE PAID UNDER ITEM
C-102. THE OWNER WILL PAY FOR AND PERFORM QUALITY ACCEPTANCE
TESTING IN CONJUNCTION WITH THE CONTRACTOR'S QUALITY CONTROL
TESTING PER SPECIFICATIONS.
2. CONTRACTOR SHALL PREPARE A STORMWATER POLLUTION AND PREVENTION
PLAN (SWPPP) AND FILE A NOTICE OF INTENT (NOI) WITH THE FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION (FDEP) PRIOR TO THE START
OF ANY CONSTRUCTION THAT WOULD AFFECT THE PROJECT SITE, AS
REQUIRED. THE CONTRACTOR SHALL FILE AND PAY FOR THE NPDES NOI UNDER
C-105 MOBILIZATION.
3. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A MANNER AS TO
REDUCE EROSION TO THE PRACTICABLE MINIMUM AND TO PREVENT DAMAGING
SILTATION OF SWALES, PONDS, OR WATER COURSES. THE SURFACE AREA OF
ERODIBLE LAND, EITHER ON OR OFF THE AIRPORT SITE, EXPOSED TO THE
ELEMENTS BY CLEARING, GRUBBING OR GRADING OPERATIONS, INCLUDING
GRAVEL PITS, WASTE OR DISPOSAL AREAS AND HAUL ROADS, AT ANY ONE TIME,
FOR THIS CONTRACT, SHALL BE SUBJECT TO APPROVAL OF THE RPR AND THE
DURATION OF SUCH EXPOSURE PRIOR TO FINAL TRIMMING AND FINISHING OF
THE AREAS SHALL BE HELD TO THE MINIMUM EXTENT PRACTICAL. THE RPR
SHALL HAVE FULL AUTHORITY TO ORDER THE SUSPENSION OF GRADING AND
OTHER OPERATIONS PENDING ADEQUATE AND PROPER PERFORMANCE OF
FINISHING AND MAINTENANCE WORK OR TO RESTRICT THE TRIMMING OF
ERODIBLE LAND EXPOSED TO THE ELEMENTS.
4. THE DISTURBANCE OF LANDS AND WATERS THAT ARE OUTSIDE THE LIMITS OF
CONSTRUCTION AS STAKED IS PROHIBITED, EXCEPT AS FOUND NECESSARY
AND APPROVED BY THE RPR.
5. MINIMAL POSSIBLE AREAS OF OPEN GRADING, BORROW OR AGGREGATE
EXCAVATION SHALL BE EXPOSED AT ONE TIME, CONSISTENT WITH THE
PROGRESS OF THE WORK.
6. THERE ARE EXISTING UNDERGROUND UTILITIES IN THE PROJECT WORK AREA.
THE LOCATION, ELEVATION AND DIMENSIONS OF THE EXISTING UTILITIES,
STRUCTURES AND OTHER FEATURES ARE SHOWN IN ACCORDANCE WITH THE
BEST INFORMATION AVAILABLE AT THE TIME OF THE PREPARATION OF THESE
PLANS BUT DO NOT PURPORT TO BE ABSOLUTELY ACCURATE. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO HAVE EVERY UNDERGROUND UTILITY
LOCATED, FLAGGED AND IDENTIFIED PRIOR TO CONSTRUCTION AND
COORDINATED WITH AIRPORT OPERATIONS. THE CONTRACTOR SHALL
CAPTURE AND RECORD ANY CONDITIONS THAT DEVIATE FROM THE
CONSTRUCTION PLANS ON THE AS-BUILT PLANS FOR SUBMITTAL TO THE RPR
DURING THE PERFORMANCE OF THE PROJECT.
7. THE LOCATION OF EXISTING FAA UNDERGROUND CABLES WILL BE FLAGGED
ONE TIME BY THE FAA AIRWAYS FACILITIES SECTOR OFFICE PERSONNEL, IF
APPLICABLE, THROUGH COORDINATION WITH THE RPR. THESE FLAGS SHALL BE
PROTECTED AND MAINTAINED BY THE CONTRACTOR AT ALL TIMES. IF THE
FLAGS ARE LOST OR REMOVED BY THE CONTRACTOR THEY WILL BE FLAGGED
AGAIN AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR IS RESPONSIBLE
FOR OBTAINING UTILITY LOCATIONS OF ALL NON-FAA UNDERGROUND CABLES
AND OTHER UTILITIES. ALL UNDERGROUND CABLES AND UTILITIES SHALL BE
PROTECTED AND DAMAGES REPAIRED EXPEDITIOUSLY BY THE CONTRACTOR
AT NO COST TO THE OWNER.
8. DAMAGE TO OTHER AIRPORT FACILITIES SUCH AS LIGHTING, SIGNAGE,
NAVIGATIONAL AIDS, FAA CABLES, AND OTHER UTILITIES SHALL BE REPORTED
TO THE RPR AND THE FAA AND REPAIRED IMMEDIATELY BY THE CONTRACTOR
AT NO COST TO THE OWNER.
9. CONTRACTOR SHALL MEET ALL APPLICABLE LOCAL AND FEDERAL LAWS WHEN
DISPOSING ANY OILS OR OTHER FLUIDS REMOVED FROM EQUIPMENT BEING
SERVICED ON AIRPORT PROPERTY. CONTRACTOR SHALL IMMEDIATELY CLEAN
ANY SPILLS, CONTACT THE RPR, AND LEGALLY DISPOSE OF THE MATERIAL OFF
AIRPORT PROPERTY AT APPROVED DESIGNATED AREAS.
10. THE CONTRACTOR SHALL CONDUCT THEIR WORK IN SUCH MANNER AS TO
PREVENT THE ENTRY OF FUELS, OILS, BITUMINOUS MATERIALS, CHEMICALS,
SEWAGE OR OTHER HARMFUL MATERIALS INTO SWALES, PONDS, WATER
COURSES, STREAMS, RIVERS, LAKES OR RESERVOIRS.
11. IF CONTRACTOR ENCOUNTERS SOIL STAINS, UNUSUAL ODORS, OR BURIED
WASTE, WORK SHALL BE STOPPED IN THE AFFECTED AREA AND THE RPR SHALL
BE NOTIFIED IMMEDIATELY FOR RESOLUTION PRIOR TO CONTINUING WORK IN
THE AFFECTED AREA.
12. ALL CONSTRUCTION WASTE SHALL BE DISPOSED OF IN A LEGAL MANNER OFF
AIRPORT PROPERTY. CONTRACTOR SHALL ACQUIRE ANY REQUIRED PERMITS
FOR DISPOSAL OF THIS MATERIAL.
13. WHEN NECESSARY, CERTAIN OPERATIONS SHALL BE DELAYED UNTIL PROPER
WIND OR CLIMATIC CONDITIONS DISSIPATE TO AN ALLOWABLE CONDITION FOR
THE WORK AS DETERMINED BY THE RPR. RPR SHALL NOTIFY CONTRACTOR
WHEN OPERATIONS MAY RESUME.
14. CONTRACTOR SHALL EXAMINE EXISTING ACCESS ROADS, TAXIWAYS, RUNWAYS,
APRONS, AND OTHER PAVEMENTS TO DETERMINE IF THEY ARE CAPABLE OF
SUSTAINING LOADS FROM VEHICLES AND CONSTRUCTION EQUIPMENT. ANY
DAMAGE TO EXISTING PAVEMENTS SHALL BE REPAIRED BY THE CONTRACTOR
AT NO EXPENSE TO THE OWNER. ANY ROADS THAT MAY BE UNSUITABLE FOR
CONSTRUCTION TRAFFIC, BASED ON THE CONTRACTOR'S MEANS AND
METHODS SHALL IMMEDIATELY BE BROUGHT TO THE ATTENTION OF THE RPR
FOR RESOLUTION.
15. THE RPR SHALL HAVE THE AUTHORITY TO SUSPEND THE WORK WHOLLY, OR IN
PART, FOR SUCH PERIOD OR PERIODS AS THEY MAY DEEM NECESSARY, DUE TO
UNSUITABLE WEATHER, OR SUCH OTHER CONDITIONS AS ARE CONSIDERED
UNFAVORABLE FOR THE EXECUTION OF THE WORK, OR FOR SUCH TIME AS IS
NECESSARY DUE TO THE FAILURE ON THE PART OF THE CONTRACTOR TO
CARRY OUT ORDERS GIVEN OR PERFORM ANY OR ALL PROVISIONS OF THE
CONTRACT.
16. THE OWNER, RPR AND ENGINEER WILL NOT BE RESPONSIBLE FOR THE
CONTRACTOR'S MEANS, METHODS, TECHNIQUES, SEQUENCES, OR
PROCEDURES OF CONSTRUCTION OR THE SAFETY PRECAUTIONS INCIDENT
THERETO. CONTENT CONTAINED IN THESE PLANS REGARDING THESE MATTERS
IS PROVIDED FOR INFORMATION ONLY.
17. CONTRACTOR SHALL ACQUIRE SECURITY BADGES AND ATTEND TRAINING FOR
ACCESS TO THE AIRPORT OPERATIONS AREA. THE OWNER'S STAFF AND RPR
WILL NOT ESCORT THE CONTRACTOR DURING CONSTRUCTION.
18. UPON COMPLETION OF THE WORK AND BEFORE ACCEPTANCE AND FINAL
PAYMENT WILL BE MADE, THE CONTRACTOR SHALL RETURN ALL BADGES AND
VEHICLE PASSES, REMOVE FROM THE SITE ALL MACHINERY, EQUIPMENT,
SURPLUS AND DISCARDED MATERIALS, RUBBISH, AND TEMPORARY
STRUCTURES. MATERIAL CLEARED FROM THE SITE AND DEPOSITED ON
ADJACENT PROPERTY WILL NOT BE CONSIDERED AS HAVING BEEN DISPOSED
OF SATISFACTORILY, UNLESS THE CONTRACTOR HAS OBTAINED THE WRITTEN
PERMISSION OF SUCH PROPERTY OWNER.
19. CONTRACTOR IS RESPONSIBLE FOR STAKING THE CONSTRUCTION WORK.
CONTRACTOR SHALL IMMEDIATELY NOTIFY THE RPR OF ANY DISCREPANCY
BETWEEN THE CONSTRUCTION DOCUMENTS AND FIELD CONDITIONS. COST OF
PROJECT SURVEY AND STAKEOUT SHALL BE PAID UNDER ITEM M-103.
20. EXISTING PAVEMENT OR OTHER EXISTING WORK NOT SPECIFIED FOR REMOVAL
WHICH IS TEMPORARILY REMOVED, DAMAGED OR IN ANY WAY DISTURBED OR
ALTERED BY THE CONTRACTOR SHALL BE REPAIRED, PATCHED, OR REPLACED
BY THE CONTRACTOR TO THE COMPLETE SATISFACTION OF THE ENGINEER AND
OWNER AND AT NO COST TO THE OWNER.
21. CONTRACTOR SHALL COORDINATE AND COOPERATE WITH OTHER
CONTRACTORS WHO MIGHT BE WORKING CONCURRENTLY AT THE AIRPORT.
ANY CONFLICTS IN PERFORMING WORK SHALL BE IMMEDIATELY BROUGHT TO
THE ATTENTION OF THE RPR FOR RESOLUTION.
22. THE CONTRACTOR SHALL PROVIDE SUFFICIENT LIGHTING CAPABLE OF FULLY
LIGHTING THE WORK AREAS DURING PERIODS OF NIGHTTIME CONSTRUCTION.
THE CONTRACTOR SHALL COORDINATE THE DIRECTION AND ANGLE OF THE
LIGHTS WITH THE OWNER AND RPR TO PREVENT IMPAIRING AIRPORT
OPERATIONS AND THE AIR TRAFFIC CONTROL TOWER.
23. SHOULD THE CONTRACTOR NEED TO CROSS ANY AIRFIELD PAVEMENTS, THEY
SHALL COORDINATE WITH THE RPR AND AIRPORT OPERATIONS REGARDING
THE NEED TO CLOSE THE PAVEMENT FOR OPERATIONS. CONTRACTOR, RPR,
AND AIRPORT OPERATIONS SHALL INSPECT AND CLEAN ANY RUNWAYS,
TAXIWAYS AND APRONS PRIOR TO AIRPORT OPERATIONS RE-OPENING THESE
AIRFIELD PAVEMENTS.
24. WORK AREA CLEANLINESS: THE WORK AREA IS IN VERY CLOSE PROXIMITY TO
ACTIVE AIRCRAFT OPERATIONS. THE AIRCRAFT JET ENGINES ARE
SUSCEPTIBLE TO INTAKE OF MATERIAL FROM PAVEMENT AND OTHER
SURFACES WHICH COULD CAUSE DAMAGE TO THE AIRCRAFT. THE
CONTRACTOR SHALL TAKE SPECIAL CARE TO ENSURE THE SITE IS CLEAN AND
FREE OF DEBRIS AT ALL TIMES. THE CONTRACTOR IS REQUIRED TO HAVE AN
OPERATIONAL COMMERCIAL GRADE VACUUM SWEEPER ON SITE AT ALL TIMES
DURING ANY CONSTRUCTION ACTIVITY. UPON COMPLETION OF A DAY'S WORK,
THE CONTRACTOR SHALL INSPECT THE PROJECT LIMITS IN THE IMMEDIATE
VICINITY OF THE DAY'S WORK AREA AND ALL HAUL ROUTES FOR DEBRIS PRIOR
TO LEAVING THE SITE. ANY DEBRIS SHALL BE REMOVED FROM THE SITE. ALL
PAVEMENT SURFACES ARE TO BE KEPT CLEAN TO THE SATISFACTION OF THE
OWNER. PAYMENT FOR THIS WORK SHOULD BE CONSIDERED INCIDENTAL TO
THE PROJECT. NO ADDITIONAL COMPENSATION WILL BE MADE FOR CLEANING
EFFORTS.
AC ACRE
ALT ALTERNATE
AOA AIRCRAFT OPERATIONS AREA
ATCT AIR TRAFFIC CONTROL TOWER
BM BENCH MARK
BMP BEST MANAGEMENT PRACTICE
BRL BUILDING RESTRICTION LIMIT
BVC BEGINNING OF VERTICAL CURVE
CB CATCH BASIN
CBR CALIFORNIA BEARING RATIO
CF CUBIC FEET
CFS CUBIC FEET PER SECOND
CL CENTERLINE
CO CLEANOUT
CONC CONCRETE
CONST CONSTRUCT, CONSTRUCTION
CONT GROUND CONTOUR
COT CITY OF TALLAHASSEE
CSO CONTRACTOR SECURITY OFFICER
CSSO CONTRACTOR'S SECURITY SAFETY OFFICER
CY CUBIC YARD
DIA DIAMETER
DIP DUCTILE IRON PIPE
DWG DRAWING
E EAST, EASTING
EA EACH
EL,ELEV ELEVATION
ENG ENGINEER, ENGINEERING
EOP EDGE OF PAVEMENT
EVC END OF VERTICAL CURVE
EQ EQUAL
EX EXIST
EXC EXCAVATION
EXP JT EXPANSION JOINT
FAA FEDERAL AVIATION ADMINISTRATION
FDOT FLORIDA DEPARTMENT OF TRANSPORTATION
FFE FINISHED FLOOR ELEVATION
FG FINISHED GRADE
FL FLOW LINE
FLR FLOOR
FS FINISHED SURFACE
GA GENERAL AVIATION
GR GRADE
GSE GROUND SERVICE EQUIPMENT
HGL HYDRAULIC GRADE LINE
HMA HOT MIX ASPHALT
HP HIGH POINT
HOR HORIZONTAL
ID INSIDE DIAMETER
IE INVERT ELEVATION
JB JUNCTION BOX
JT JOINT
L LENGTH
LF LINEAR FEET
LS LUMP SUM
LT LEFT
MAX MAXIMUM
MES MITERED END SECTION
MH MANHOLE
MIN MINIMUM
MITL MEDIUM INTENSITY TAXIWAY LIGHTS
MISC MISCELLANEOUS
MULT MULTIPLE
MSL MEAN SEA LEVEL
N NORTH, NORTHING
NO NUMBER
NPDES NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFF OFFSET
OFA OBJECT FREE AREA
OFZ OBJECT FREE ZONE
PB PULL BOX
PCC PORTLAND CEMENT CONCRETE
PCCP PORTLAND CEMENT CONCRETE PAVEMENT
PI POINT OF INTERSECTION
PL PROPERTY LINE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
PSI POUNDS PER SQUARE INCH
Q RATE OF FLOW IN CFS
R RADIUS
RC REINFORCED CONCRETE
RCP REINFORCED CONCRETE PIPE
REF REFERENCE
REIL RUNWAY END IDENTIFIER LIGHTS
REINF REINFORCED, REINFORCEMENT
ROFA RUNWAY OBJECT FREE AREA
RPR RESIDENT PROJECT REPRESENTATIVE
RPZ RUNWAY PROTECTION ZONE
RSA RUNWAY SAFETY AREA
RT RIGHT
RPR RESIDENT PROJECT REPRESENTATIVE
RW RUNWAY
S SLOPE
SB SUBBASE
SD STORM DRAIN
SEC SECTION
SEW STRAIGHT ENDWALL
SF SQUARE FEET
SHLD SHOULDER
SPEC SPECIFICATIONS
SS SANITARY SEWER
STA STATION
STD STANDARD
SWPPP STORM WATER POLLUTION PREVENTION PLAN
SY SQUARE YARD
TLH TALLAHASSEE INTERNATIONAL AIRPORT
TOPO TOPOGRAPHY
TOW TOP OF WALL
TOFA TAXIWAY OBJECT FREE AREA
TSA TAXIWAY SAFETY AREA/ TRANSPORTATION
SECURITY ADMINISTRATION
TW TAXIWAY
TYP TYPICAL
UEW U-ENDWALL
VAR VARIES, VARIABLE
VC VERTICAL CURVE
VER VERIFY
VERT VERTICAL
VSR VEHICLE SERVICE ROAD
W/ WITH
W WATERLINE
ABBREVIATIONS
BID DOCUMENTS
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C002
144124113
KDH
CAC
KDH
SAFETY AND
SECURITY
NOTES
FEBRUARY 2026
BID DOCUMENTS
SAFETY NOTES SECURITY NOTES
1. CONTRACTOR SHALL PROVIDE A CONTRACTOR SECURITY SAFETY OFFICER (CSSO) FAMILIAR WITH AIRPORT SAFETY TO MONITOR CONSTRUCTION ACTIVITIES AND COORDINATE AN IMMEDIATE RESPONSE TO CORRECT ANY CONSTRUCTION RELATED ACTIVITY THAT MAY ADVERSELY AFFECT THE OPERATIONAL SAFETY OF THE AIRPORT. THE CSSO SHALL BE RESPONSIBLE FOR ALL SAFETY PRECAUTIONS PRIOR TO AND DURING THE DURATION OF THE CONSTRUCTION. THE CSSO SHALL PROVIDE THE RPR A WRITTEN ACCIDENT AND FIRE PROTECTION PLAN FOR ALL WORK CONTEMPLATED UNDER THE CONTRACT. THE CSSO SHALL BE RESPONSIBLE FOR BRIEFING ALL CONTRACTOR PERSONNEL ON SECURITY
REQUIREMENTS AS OUTLINED IN THE CONTRACT DOCUMENTS.
2. A DAILY PROJECT SAFETY MEETING WILL BE HELD BETWEEN THE CONTRACTOR'S CSSO AND THE RPR TO REVIEW THE SAFETY REQUIREMENTS FOR THE NEXT WORK PERIOD. THE CSSO SHALL CONDUCT SAFETY MEETINGS AS APPLICABLE OR DIRECTED BY THE OWNER OR THE RPR TO MAINTAIN A SAFE AND SECURE PROJECT SITE THROUGH THE DURATION OF THE CONTRACT. SAFETY MEETINGS SHALL BE ATTENDED BY ALL SUPERVISORS, MEETING MINUTES SHALL BE PREPARED FOR ALL SAFETY MEETINGS AND SAVED IN THE CONTRACTOR'S FIELD OFFICE AND BE
MADE AVAILABLE TO THE OWNER OR RPR UPON REQUEST.
3. CONTRACTOR SHALL RESTRICT MOVEMENT OF CONSTRUCTION VEHICLES TO CONSTRUCTION AREAS BY FLAGGING AND BARRICADING, ERECTING
TEMPORARY FENCING, OR PROVIDING ESCORTS, AS APPROPRIATE.
4. CONTRACTOR SHALL ENSURE THAT NO EMPLOYEES, EMPLOYEES OF SUBCONTRACTORS OR SUPPLIERS, OR OTHER PERSONS ENTER ANY PART OF THE AIR OPERATIONS AREAS (AOA) FROM THE CONSTRUCTION SITE UNLESS AUTHORIZED BY THE RPR IN WRITING.
5. STOCKPILED MATERIALS AND EQUIPMENT STORAGE ARE NOT PERMITTED WITHIN THE RSA AND OFZ OF AN OPERATIONAL RUNWAY OR WITHIN THE TOFA OF AN OPERATIONAL TAXIWAY. CONTRACTOR SHALL ENSURE THAT STOCKPILED MATERIALS AND EQUIPMENT ADJACENT TO THESE AREAS ARE PROMINENTLY MARKED AND LIGHTED DURING HOURS OF RESTRICTED VISIBILITY OR DARKNESS. THIS INCLUDES DETERMINING AND VERIFYING THAT MATERIALS ARE STORED AT AN APPROVED LOCATION TO PREVENT FOREIGN OBJECT DAMAGE AND ATTRACTION OF WILDLIFE.
6. IDENTIFICATION OF PERSONNEL: ALL EMPLOYEES, AGENTS, VENDORS, INVITEES, ETC. OF THE CONTRACTOR OR SUBCONTRACTORS REQUIRING ACCESS TO THE PROJECT SITE OR STAGING AREA, IF LOCATED WITHIN THE AOA, SECURED OR STERILE AREAS, IN ACCORDANCE WITH THE OWNER'S SECURITY PROGRAM, WILL BE REQUIRED TO DISPLAY AIRPORT ISSUED IDENTIFICATION OR BE UNDER ESCORT BY PROPERLY BADGED PERSONNEL. AT THE COMPLETION OF THE CONTRACT ALL BADGES WILL BE RETURNED TO THE AIRPORT OR A PER BADGE CHARGE WILL BE ASSESSED FOR ALL BADGES NOT RETURNED. AS PART OF THE BADGE APPLICATION PROCESS, EACH APPLICANT WILL BE FINGERPRINTED FOR USE IN A CRIMINAL RECORDS SEARCH. ANY PERSON WHOSE CRIMINAL RECORD REVEALS OFFENSES LISTED BY FAA AS DISQUALIFYING OFFENSES WILL BE DENIED A BADGE AND WILL BE PROHIBITED FROM UNESCORTED ACCESS TO THE PROJECT SITE. ALL REQUIRED PAPERWORK AND ID BADGE APPLICATIONS SHALL BE SUBMITTED A MINIMUM OF THREE (3) WEEKS BEFORE ISSUANCE OF ANY BADGE. CONTRACTOR PERSONNEL REQUIRING AIRPORT ISSUED BADGES ARE RESPONSIBLE FOR ATTENDING SIDA TRAINING AND COMPLETING SECURITY BADGE APPLICATIONS. THERE MAY BE A CHARGE FOR THE BACKGROUND CHECK AND FINGERPRINTING PROCESS, THE COST OF WHICH SHALL BE INCIDENTAL TO MOBILIZATION. ALL EMPLOYEES, AGENTS, VENDORS, INVITEES, ETC. OF THE CONTRACTOR OR SUBCONTRACTORS HAVING ACCESS TO THE AOA UNDER ESCORT SHALL CONSPICUOUSLY WEAR EITHER SHIRT AND/OR HARD HAT THAT IDENTIFIES THE EMPLOYER OF THE
PERSONNEL.
1. CONTRACTOR SHALL BE FAMILIAR WITH THE FOLLOWING FAA SAFETY PROVISIONS AND IMPLEMENT THESE REQUIREMENTS DURING CONSTRUCTION. THE LATEST COPIES OF THESE GUIDELINES CAN BE OBTAINED ON-LINE AT (HTTP://WWW.FAA.GOV/REGULATIONS_POLICIES).
a. FAA ADVISORY CIRCULAR AC 150/5200-18, "AIRPORT SAFETY SELF-INSPECTION"
b. FAA ADVISORY CIRCULAR AC 150/5200-33, "HAZARDOUS WILDLIFE ATTRACTANTS ON OR NEAR AIRPORTS"
c. FAA ADVISORY CIRCULAR AC 150/5210-5, "PAINTING, MARKING AND LIGHTING OF VEHICLES USED ON AN AIRPORT"
d. FAA ADVISORY CIRCULAR 150/5210-24, "AIRPORT FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT"
e. FAA ADVISORY CIRCULAR 150/5370-2, "OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION"
f. CODE OF FEDERAL REGULATIONS, 14 CFR PART 77, "SAFE EFFICIENT USE AND PRESERVATION OF THE NAVIGABLE AIRSPACE"
2. CONTRACTOR SHALL COMPLY WITH THE CONSTRUCTION SAFETY AND PHASING PLAN ASSOCIATED WITH THE CONSTRUCTION PROJECT AND ENSURE THAT CONSTRUCTION PERSONNEL ARE FAMILIAR WITH SAFETY PROCEDURES AND REGULATIONS OF THE AIRPORT.
3. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WORKING AROUND POTENTIALLY ENERGIZED UNDERGROUND OR ABOVE GROUND ELECTRICAL UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TO IMPLEMENT A LOCK-OUT/TAG-OUT PROCEDURE FOR PERFORMANCE OF ANY WORK ON AIRPORT ELECTRICAL
CIRCUITS.
4. CONTRACTOR EMPLOYEES SHALL PARK AND SERVICE ALL CONSTRUCTION VEHICLES IN THE CONTRACTOR'S STAGING AREA WHEN NOT IN USE BY CONSTRUCTION PERSONNEL (E.G., OVERNIGHT, ON WEEKENDS, OR DURING OTHER PERIODS WHEN CONSTRUCTION IS NOT ACTIVE), UNLESS SPECIFICALLY AUTHORIZED OTHERWISE
IN WRITING BY THE OWNER OR RPR.
5. CONTRACTOR SHALL PROMINENTLY MARK OPEN TRENCHES AND EXCAVATIONS WITHIN THE CONSTRUCTION SITE WITH RED OR ORANGE FLAGS, AS APPROVED BY THE RPR, AND LIGHT THEM WITH RED LIGHTS DURING HOURS OF RESTRICTED VISIBILITY OR DARKNESS.
6. OPEN TRENCHES OR EXCAVATIONS ARE NOT PERMITTED WITHIN THE RUNWAY SAFETY AREA (RSA) WHILE THE RUNWAY IS OPEN. IF THE RUNWAY MUST BE OPENED BEFORE EXCAVATIONS ARE BACKFILLED, COVER THE EXCAVATIONS APPROPRIATELY. COVERINGS FOR OPEN TRENCHES OR EXCAVATIONS MUST BE OF SUFFICIENT
STRENGTH TO SUPPORT THE WEIGHT OF THE HEAVIEST AIRCRAFT OPERATING ON THE RUNWAY.
7. OPEN TRENCHES OR EXCAVATIONS ARE NOT PERMITTED WITHIN THE TAXIWAY SAFETY AREA (TSA). COVERINGS FOR OPEN TRENCHES OR EXCAVATIONS MUST BE SUFFICIENT STRENGTH TO SUPPORT THE WEIGHT OF THE HEAVIEST AIRCRAFT OPERATING ON THE TAXIWAY AND APRON WHEN THE PAVEMENT IS OPEN FOR
OPERATIONS.
8. IF REQUIRED BY THE CSPP, CONTRACTOR SHALL SEPARATE THE CONSTRUCTION SITE AND MOVEMENT AREAS SO THAT NO PART OF AN AIRCRAFT MAY ENTER THE CONSTRUCTION AREA BY USING LOW-PROFILE BARRICADES THAT ARE MARKED WITH DIAGONAL, ALTERNATING ORANGE AND WHITE STRIPES AND RED LIGHTS.
BARRICADES MAY BE SUPPLEMENTED WITH ALTERNATING ORANGE AND WHITE FLAGS AT LEAST 3 FEET BY 3 FEET SQUARE AND MADE AND INSTALLED SO THEY ARE ALWAYS IN AN EXTENDED POSITION, PROPERLY ORIENTED, AND SECURELY FASTENED TO ELIMINATE JET ENGINE INGESTION.
9. CONTRACTOR SHALL NOT CONDUCT ANY CONSTRUCTION ACTIVITY WITHIN NAVIGATIONAL AID RESTRICTED AREAS AND CRITICAL AREAS, WITHOUT PRIOR APPROVAL FROM THE LOCAL FAA AIRWAY FACILITIES SECTOR REPRESENTATIVE. NAVIGATIONAL AIDS INCLUDE INSTRUMENT LANDING SYSTEM COMPONENTS SUCH AS THE
LOCALIZER, THE GLIDESLOPE, APPROACH LIGHTS, PAPIS, ETC.
10. ALL CONTRACTOR EQUIPMENT SHALL BE IDENTIFIED BY THREE-FOOT (3') SQUARE ORANGE AND WHITE FLAGS WHENEVER SUCH VEHICLE AND EQUIPMENT ARE OPERATING WITHIN THE AOA. IN ADDITION, SUCH VEHICLES AND EQUIPMENT SHALL HAVE THE CONTRACTOR'S NAME CLEARLY AFFIXED ON EACH SIDE OF SUCH VEHICLES AND EQUIPMENT. DURING THE HOURS BETWEEN SUNSET AND SUNRISE AND AT ALL TIMES WHEN VISIBILITY IS IMPAIRED, VEHICLES AND MOBILE EQUIPMENT SHALL ALSO BE EQUIPPED WITH A REVOLVING YELLOW BEACON LIGHT MOUNTED ON THE TOP OF THE VEHICLE OR EQUIPMENT. BEACON LIGHTS SHALL PROVIDE:
a. THREE HUNDRED AND SIXTY DEGREE AZIMUTH COVERAGE. SEE FAA ADVISORY CIRCULAR AC 150/5200-33 - "HAZARDOUS WILDLIFE ATTRACTANTS ON OR
NEAR AIRPORTS".
b. EFFECTIVE INTENSITY IN THE HORIZONTAL PLANE NOT LESS THAN 40 OR MORE THAN 400 CANDELAS.
c. BEAM SPREAD MEASURED TO 1/10 PEAK INTENSITY EXTENDING FROM 10 DEGREES TO 15 DEGREES ABOVE THE HORIZONTAL PLANE.
d. SIXTY TO NINETY FLASHES PER MINUTE.
11. NO CRANE SHALL BE ALLOWED ON THE WORK SITE UNTIL THE EQUIPMENT AND ITS INTENDED OPERATION ARE APPROVED BY THE RPR. THE CONTRACTOR SHALL PROVIDE THE RPR WITH NOT LESS THAN 72-HOUR ADVANCE WRITTEN NOTICE REQUESTING CRANE ACCESS TO THE AOA. WHEN ACCESS IS APPROVED BY THE RPR, THE TIP OF THE CRANE BOOM SHALL BE IDENTIFIED BY THE ORANGE AND WHITE FLAG AND BY RED OBSTRUCTION LIGHTS, CONFORMING TO FAA REQUIREMENTS.
12. CONSTRUCTION DURING THE PROJECT MAY BE HALTED AT ANY TIME IF IT IS DETERMINED TO BE IN THE BEST INTEREST OF THE OWNER OR AIRPORT OPERATIONAL SAFETY, AND THE CONTRACTOR MAY BE DIRECTED TO REMOVE EQUIPMENT AND/OR EVACUATE THE SITE. NECESSARY EXTENSIONS IN CONTRACT TIME MAY BE GRANTED OR A STOP WORK ORDER MAY BE ISSUED DUE TO THESE DELAYS. THERE WILL BE NO ADJUSTMENTS IN CONTRACT PRICE DUE TO THESE DELAYS. SHOULD SEVERE WEATHER OR OTHER OPERATIONAL EMERGENCY REQUIRE ADDITIONAL OUT OF SCOPE WORK TO PREPARE THE AREA FOR AIRCRAFT OPERATION, THE CONTRACTOR SHALL PROMPTLY AND FULLY COMPLY WITH THE OWNER’S DIRECTIVE. THE CONTRACTOR MAY SUBMIT DOCUMENTATION SUPPORTING A REQUEST TO
BE REIMBURSED FOR SUCH EXTRA WORK FOR CONSIDERATION AND ACTION BY THE OWNER.
13. VEHICULAR TRAFFIC SHALL NOT CROSS ACTIVE AIRCRAFT MOVEMENT AREAS (RUNWAYS, TAXIWAYS OR AIRCRAFT PARKING APRON) WITHOUT PRIOR APPROVAL OF AIRPORT OPERATIONS, AND MUST BE UNDER ESCORT BY INDIVIDUALS WITH MOVEMENT AREA DRIVING PRIVILEGES.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACTIONS OF EMPLOYEES AND SUBCONTRACTORS. PERSONNEL WHO DO NOT ABIDE BY AIRPORT RULES AND REGULATIONS ARE SUBJECT TO PROSECUTION AND OR MONETARY FINES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYMENT OF ANY FINES ASSESSED TO THE OWNER DUE TO THE CONTRACTOR'S VIOLATIONS OF FAA OPERATING, SAFETY OR SECURITY REQUIREMENTS. ANY DELAY OF CONSTRUCTION OF PROJECT DUE TO VIOLATION OF FEDERAL AND/OR AIRPORT REGULATIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
15. THE EMERGENCY NUMBER TO CALL FOR ANY INCIDENT ON THE PROJECT OR AIRPORT SHALL BE 911, AND THE SITE IS TALLAHASSEE INTERNATIONAL AIRPORT, UNLESS OTHERWISE NOTIFIED BY THE OWNER. IN ADDITION, CALL THE AIRPORT COMMUNICATIONS CENTER AT 850-891-7830 FOR NOTIFICATION OF THE EMERGENCY.
16. CONTRACTOR WILL NOT BE ALLOWED TO USE ANY OF THE EXISTING TAXIWAYS OR APRONS OR OTHER PAVEMENT AREA NOT AFFECTED BY THE CONSTRUCTION FOR
ANY PURPOSE UNLESS SPECIFICALLY AUTHORIZED BY THE OWNER OR RPR.
17. CONTRACTOR IS REQUIRED TO HAVE A PERSON ON CALL 24-HOURS A DAY, 7 DAYS A WEEK FOR EMERGENCY MAINTENANCE OF AIRPORT HAZARD LIGHTING AND BARRICADES. CONTRACTOR SHALL PROVIDE AN EMERGENCY NOTIFICATION LIST (24-HOUR CONTACT LIST) WHICH IDENTIFIES THE CONTRACTOR'S PROJECT SUPERVISORY STAFF, AND ALL SUBCONTRACTOR SUPERVISORS/LEADS TO THE OWNER AND RPR. ALL CHANGES IN PERSONNEL MUST BE REPORTED TO THE RPR AND
OWNER WITHIN 24 HOURS.
18. ANY TAXIWAY AND RUNWAY CLOSURE REQUESTS, OUTSIDE OF THAT SPECIFIED WITHIN CONTRACT DOCUMENTS, MUST BE SUBMITTED 72 HRS IN ADVANCE OF THE REQUESTED CLOSURE PERIOD. THE REQUEST MUST CONTAIN A DRAWING THAT CLEARLY DEPICTS THE AREA(S) TO BE CLOSED AND A SCHEDULE OF OPERATIONS
AND TIME(S) REQUIRED FOR CONSTRUCTION.
8" PALM
X X
X X
XX
13" OAK
11" OAK
9" OAK
16" OAK 16" OAK
HORIZONTAL SURFACE, 233.1'
200'
180'
160'
CONTRACTOR STAGING
AREA, EQUIPMENT HEIGHT
SHALL NOT EXCEED 100'
PROPOSED
BUILDING
AOA FENCE
SOIL TRACKING PREVENTION DEVICE
(CONSTRUCTION ENTRANCE)
EXISTING GATES, CONTRACTOR
TO COORDINATE WITH OWNER
TO OBTAIN BADGES TO ACCESS
AREA. CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING
SECURE AREA AT ALL TIMES.
ACCESS TO
SITE IS VIA
SPRINGHILL
ROAD
ATCT FENCE
AOA FENCE AOA GATE
AOA FENCE
TEMPORARY CONSTRUCTION FENCE.
AIR TRAFFIC CONTROL AREA SHALL BE
KEPT SECURE AT ALL TIMES. CONTRACTOR
ENTRANCE AND EXIT GATE SHALL BE
LOCKED OR GUARDED AT ALL TIMES.
AIR TRAFFIC
CONTROL
TOWER (ATCT)
BUS 40 - ROUTE
H
OR
IZ
ON
TA
L
SU
RF
AC
E, .1
21.1'
21.0'
400'
HYDRANT
COVERAGE
RADIUS
36" CLEAR SPACE AROUND
EXISTING HYDRANT
36" CLEAR SPACE
AROUND EXISTING
HYDRANT
FIRE HOSE PATH
APPROX. 457'
CONTRACTOR TO
INSTALL BARRICADES
0'
7:
TR
AN
SI
TI
O N
AL
SU
R
FA
C E
CONTRACTOR TO MAINTAIN MIN. 15'
WIDE ACCESS PATH FOR AIRPORT
VEHICLES DURING CONSTRUCTION.
50'
EXISTING
DRY
RETENTION
POND
BY
DATE
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C003
144124113
KDH
CAC
KDH
CONTRACT
LAYOUT
FEBRUARY 2026
NORTH
NOTES
1. CONTRACTOR SHALL PARK ALL EQUIPMENT AND VEHICLES IN THE CONTRACTOR STAGING AREA.
2. CONTRACTOR SHALL KEEP ALL PERSONNEL AND EQUIPMENT OUTSIDE THE AIR OPERATIONS AREA (AOA)
UNLESS APPROVED BY THE OWNER.
3. NO OBJECT SHALL PENETRATE PART 77 SURFACES WHEN THE RUNWAY IS OPEN FOR AIRCRAFT
OPERATIONS UNLESS PRIOR FAA APPROVAL IS OBTAINED.
4. THE OWNER WILL SUBMIT AN AIRSPACE CHECKLIST (FORM 7460-1) TO THE FAA PRIOR TO
NOTICE-TO-PROCEED WITH CONSTRUCTION INDICATING A LIST OF ANTICIPATED TYPE AND HEIGHT OF TEMPORARY EQUIPMENT THE CONTRACTOR WILL USE OR STORE IN ONSITE. THE CONTRACTOR SHALL PROVIDE THIS INFORMATION TO THE OWNER AT LEAST 75 DAYS PRIOR TO NOTICE-TO-PROCEED.
5. THE OWNER WILL SUBMIT AN AIRSPACE CHECKLIST (FORM 7460-1) TO THE FAA FOR APPROVAL OF ANY SPECIALTY EQUIPMENT SUCH AS CRANES OR EARTH MOVING EQUIPMENT THE CONTRACTOR WILL USE OR STORE ONSITE. THE CONTRACTOR SHALL PROVIDE THIS INFORMATION TO THE OWNER AT LEAST 75 DAYS
PRIOR TO USE.
6. ALL ELEVATIONS SHOWN ON THIS SHEET ARE ABOVE MEAN SEA LEVEL (AMSL).
7. TEMPORARY CONSTRUCTION AREA AND FLOOD LIGHTING SHALL BE PLACED IN A MANNER TO POINT AWAY
FROM THE RUNWAY ENDS AND AIR TRAFFIC CONTROL TOWER.
8. THE CONTRACTOR IS RESPONSIBLE FOR SECURING THEIR STOCKPILE AND STAGING AREAS, EQUIPMENT
AND MATERIALS LOCATED ON AIRPORT PROPERTY.
9. THE CONTRACTOR'S STAGING AREA AND TEMPORARY HAUL ROADS SHALL BE REMOVED UPON
COMPLETION OF CONSTRUCTION AND THE DISTURBED AREA SHALL SHALL BE RESTORED TO THE ORIGINAL
CONDITION OR BETTER.
10. DAMAGE TO ANY PAVEMENTS OR PROPERTY CAUSED BY THE CONTRACTORS'S HAULING OR
CONSTRUCTION EQUIPMENT SHALL BE REPAIRED TO THE FULL SATISFACTION OF THE OWNER AT THE
CONTRACTOR'S SOLE EXPENSE.
11. MAINTENANCE OF TRAFFIC IS THE CONTRACTOR'S RESPONSIBILITY. ALL PUBLIC AND AIRPORT ROADS ARE TO REMAIN OPEN TO TWO-WAY TRAFFIC AT ALL TIMES UNLESS APPROVED IN WRITING BY THE OWNER.
LEGEND
GRAPHIC SCALE IN FEET
30 60 120
CONTRACTOR
STAGING AREA
180'
HAUL ROUTE
F.A.R. PART 77
AIRSPACE SURFACE
ELEVATION
SOIL TRACKING
PREVENTION
DEVICE (STPD)
BID DOCUMENTS
TEMPORARY
CONSTRUCTION
FENCE
(MIN. 10' HEIGHT)
PROJECT PHASING
1. THE SCOPE OF WORK ELEMENTS LISTED IN THESE NOTES IS INDICATIVE ONLY; THE CONTRACTOR IS TO
DEFINE ALL ELEMENTS OF WORK AND THE SCHEDULE FOR WORK PERFORMANCE TO BE PERFORMED
DURING EACH PHASE AND SUB-PHASE IN EACH DETAILED WORK PLAN/PROJECT SCHEDULE FOR
COORDINATION WITH THE OWNER BEFORE BEGINNING WORK ON EACH PHASE OF THE PROJECT.
2. THE OWNER RESERVES THE RIGHT TO RE-SEQUENCE WORK AREAS WITHIN THE SPECIFIED PHASING LIMITS
AT NO CHANGE TO CONTRACT TIME AND NO COST TO THE OWNER.
3. CONTRACTOR TO PERFORM SITE INVESTIGATION AND LOCATE ALL UTILITIES, INCLUDING STORM, SANITARY, ELECTRICAL, FUEL LINES, FORCE MAINS AND COMMUNICATIONS INFRASTRUCTURE, PRIOR TO
THE START OF WORK.
PHASE 0: CONTRACTOR'S MOBILIZATION, HAUL ROUTE SIGNAGE, EQUIPMENT PROCUREMENT, PROJECT SCHEDULE, CONTRACTOR'S QUALITY CONTROL AND SAFETY PLAN, SAFETY PLAN COMPLIANCE DOCUMENT (SPCD), CONTRACTOR'S STAGING AREA, CONSTRUCTION PERMITTING BY THE CONTRACTOR, PERMITTING
AND SUBMITTALS, ORDERING OF LONG-LEAD ITEMS, ETC.
PHASE 0 SHALL BE COMMENCED FOLLOWING NOTICE TO PROCEED.
PHASE 0 SHALL TAKE PLACE AS DAYTIME WORK.
PHASE 1: INCLUDES ALL WORK REPRESENTED IN THE CONTRACT SCOPE OF WORK.
PHASE 1 SHALL BE COMMENCED FOLLOWING PHASE 1.
PHASE 1 SHALL TAKE PLACE AS DAYTIME WORK.
400' HYDRANT
COVERAGE RADIUS
BARRICADES
SEE DETAIL 1, SHEET C003
FIRE HOSE PATH
WARNING LIGHT
OPTIONAL
- 6
" M
IN
18" MIN.
ORANGE TRAFFIC DRUM DETAIL1
C003
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C004
144124113
KDH
CAC
KDH
GEOTECHNICAL
BORING PLAN
FEBRUARY 2026
IRC SET 5/8 GPS/TRAV LB 7055 #20001
SET CONTROL POINT ""
N: 504100.79 E: 2014652.38
LAT: N030° 23' 09.79"
LON: W084° 21' 13.06"
ELEV.= 62.49'
IRC SET 5/8 GPS/TRAV LB 7055 #20002
SET CONTROL POINT ""
N: 504531.65 E: 2014647.47
LAT: N030° 23' 14.05"
LON: W084° 21' 13.11"
ELEV.= 75.59'
62.0
62.4
63.07
63.26
62.88
63.5
63.92 64.17
63.75
63.2
63.2
64.7
64.5 64.97
65.35 64.95
63.9
64.6 65.4
66.1
66.5
68.5
67.8 67.4
66.66
66.27 65.9
63.964.1
67.1
67.5 67.0
66.53
66.94
67.10
66.67 66.45
66.60
66.71
67.16
66.94
66.91
67.4767.7967.5667.9 67.76
68.11
69.8870.2
72.1 72.6
73.2
72.9
71.92 71.69
72.16
72.74 72.82
72.8
72.34
71.66 71.93
70.5369.99 69.81
67.21
67.97 67.88
68.2
68.4
70.770.8
8" PALM
8" PALM
68.30
69.73
71.74
73.74 74.00
74.0775.1
77.2
77.8
77.1
76.3 76.2
75.44 75.51
76.27
75.94
74.78
75.53
74.61
73.9
73.6
73.8
73.5
74.0
74.074.2 75.1
75.0
74.3474.72
74.91
74.74
74.3 74.2
73.0
74.5
74.6
73.95
74.03
69.870.5
70.7
71.0
72.5 72.9 72.7
74.674.172.8
74.6
75.3 76.7
75.6
76.6
77.1
75.7
C
1.0' X 1.0'
10' CHAIN LINK FENCE
XX
X X
X X
X X
X X
X X
XXXX
' C
H
AI
N L
IN
K
FE
N
C E
10' CHAIN LINK FENCE
C &G E/ P S/W
AIR TRAFFIC
CONTROL
TOWER
FFE = 74.00
CONC.
BLDG
KEY PAD
GATE
S/W
S/W
S/W
E/ P
E/P
E/P
E/P
E/P
C &G
C&G
C&G
C&G
C&G
DIRT RO
AD
ELEC SENSOR
HVAC UNIT
GENERATOR
BGV
TR
EE LIN
E
TR
EE LIN
E
LANDSCAPING
CONC.
CONC.
CONC.
RIM ELEV. = 76.21
BGV
TOE OF SLOPE
TOP OF SLOPE
TOE OF SLOPE
TOP OF SLOPE
13" OAK
11" OAK
9" OAK
16" OAK 16" OAK
BY
DATE
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C100
144124113
KDH
CAC
KDH
PROJECT
SURVEY
FEBRUARY 2026
NORTH
NOTES
1. THE FIELD SURVEY WAS COMPLETED ON 05/15/2024 BY WANTMAN
GROUP, INC. AND RECORDED IN FIELD BOOK N94, PAGES 66-67.
2. THE SURVEY SHOWN ON THIS SHEET REFLECTS THE FIELD
CONDITIONS AT THE TIME OF THE SURVEY ONLY AND IS INTENDED
FOR REFERENCE ONLY. IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO VERIFY FIELD CONDITIONS PRIOR TO BEGINNING
WORK. CONTRACTOR SHALL PERFORM A PRE-CONSTRUCTION
SURVEY AND SUBMIT TO THE RPR A STATEMENT TO VERIFY THAT
THE CONTRACTOR AGREES WITH THE EXISTING CONDITIONS AND
HORIZONTAL/VERTICAL CONTROLS AS SHOWN IN THESE PLANS.
SURVEY SHALL BE PAID UNDER M-103.
3. THIS SURVEY WAS PREPARED IN ACCORDANCE WITH THE
"STANDARDS OF PRACTICE," AS SET FORTH BY THE FLORIDA BOARD
OF PROFESSIONAL SURVEYORS AND MAPPERS IN RULE 5J-17.050
THROUGH 5J-17.053, OF THE FLORIDA ADMINISTRATIVE CODE.
4. ADDITIONS OR DELETIONS TO SURVEY MAPS OR REPORTS BY
OTHER THAN THE SIGNING PARTY OR PARTIES IS PROHIBITED
WITHOUT WRITTEN CONSENT OF THE SIGNING PARTY OR PARTIES.
5. ELEVATIONS SHOWN HEREON ARE REFERENCED TO THE NORTH
AMERICAN VERTICAL DATUM OF 1988 AS DERIVED FROM SITE
BENCHMARKS, AS PROVIDED TO THE SURVEYOR, 156 (FOUND 5/8"
IRON ROD AND CAP STAMPED "LB 7713"), HAVING AN ELEVATION OF
50.02. THE VERTICAL ACCURACY IS ESTIMATED TO BE 0.1', MORE OR
LESS.
6. THE COORDINATE SYSTEM UTILIZED HEREON IS RELATIVE TO THE
FLORIDA STATE PLANE COORDINATE SYSTEM, NORTH ZONE, NORTH
AMERICAN DATUM OF 1983, 2011 AS DERIVED BY REAL-TIME
KINEMATIC GLOBAL POSITIONING SYSTEM ("RTK GPS") SURVEY
METHODS USING A BASE/ROVER CONFIGURATION ON SITE
CONTROL, AS PROVIDED TO THE SURVEYOR. THE CORRECTED
POSITIONS COMPUTED BY THESE NETWORKS WERE VERIFIED
THROUGH A REDUNDANCY OF MEASUREMENTS ON PRIMARY
CONTROL ALONG WITH CONSISTENT HORIZONTAL CHECKS TO
SECONDARY CONTROL POINTS ON SITE. ALL DISTANCES SHOWN
HEREON ARE IN U.S. SURVEY FEET. THE HORIZONTAL ACCURACY IS
ESTIMATED TO BE 0.1', MORE OR LESS.
7. UNDERGROUND IMPROVEMENTS, IF ANY, WERE NOT LOCATED
EXCEPT AS SHOWN.
8. THE PROPERTY SURVEYED MAY CONTAIN WETLANDS OR OTHER
ENVIRONMENTALLY SENSITIVE AREAS SUBJECT TO THE
JURISDICTION BY GOVERNMENTAL AGENCIES. THE LIMITS OF SAID
AREAS, IF ANY, HAVE NOT BEEN LOCATED OR SHOWN HEREON.
9. THE CONTOUR INTERVAL IS ONE FOOT.
LEGEND
BENCHMARK
EXISTING CONTOUR (1' INTERVALS)XX
XX.XX EXISTING ELEVATION
GRAPHIC SCALE IN FEET
15 30 60
E E
E E
E E
E E
E E
E E
E E
E
E
E
E
E
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
XXXXXXXXXXXXX
13" OAK
11" OAK
9" OAK
N: 504542.36 E: 2014496.31
N: 504457.38 E: 2014497.84
TIE INTO EXISTING
FENCE POST AT APPROX.
N: 504437.99 E: 2014568.02
N: 504543.89 E: 2014581.15
REMOVE EXISTING FENCE
REMOVE EXISTING CURB
N: 504458.91 E: 2014582.66N: 504457.32
E: 2014567.70
N: 504475.17 E: 2014582.85
N: 504504.55 E: 2014582.78
XXXXXXXXXX
XXXXXXXXXX
XXXXXXXXXXX
REMOVE EXISTING
MARKINGS (TYP.)
PRESERVE AND PROTECT
EXISTING LIGHT POLE
PRESERVE AND PROTECT EXISTING
UNDERGROUND ELECTRIC
TIE INTO EXISTING FENCE
POST AT APPROX.
N: 504543.34 E: 2014481.29
N: 504436.56 E: 2014483.21
WITH OWNER'S APPROVAL
CONTRACTOR MAY USE EXISTING
GATES TO ACCESS SITE IN LIEU
OF INSTALLING TEMPORARY
CHAIN LINK SITE ACCESS GATE.
CONTRACTOR SHALL INSTALL
TEMPORARY FENCE PRIOR TO THE
REMOVAL OF EXISTING FENCE.
SEE DETAIL 1 SHEET
C412 FOR FENCE DETAIL.
N: 504486.20 E: 2014636.61
N: 504491.19 E: 2014636.55
N: 504492.53 E: 2014625.23
PRESERVE AND PROTECT
EXISTING TREE
PRESERVE AND PROTECT
EXISTING TREE
PRESERVE AND PROTECT
EXISTING TREE
BY
DATE
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C200
144124113
KDH
CAC
KDH
DEMOLITION
PLAN
FEBRUARY 2026
NOTES
1. THE HORIZONTAL AND VERTICAL LOCATION OF EXISTING
UNDERGROUND UTILITIES AND OTHER FEATURES ARE
BASED ON THE BEST INFORMATION AVAILABLE AT THE TIME
OF THE PREPARATION OF THESE PLANS. IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO HAVE EVERY
UNDERGROUND UTILITY FEATURE LOCATED, FLAGGED,
IDENTIFIED AND APPROPRIATELY PROTECTED PRIOR TO
CONSTRUCTION.
LEGEND
CLEARING AND GRUBBING
PAVEMENT MARKING REMOVALX X X X X X
GRAPHIC SCALE IN FEET
5 10 20
NOTES
NORTH
BID DOCUMENTS
TEMPORARY CHAIN LINK FENCE, MIN 10' HEIGHT.
FENCE TO BE REMOVED AFTER COMPLETION OF WORK.
SIDEWALK REMOVAL
TREE DEBITS AND CREDITS
TREE DEBITS AND CREDITS SUMMARY
X
X X
X X
X X
X X
X
XXXXXXXXXXXXX
13" OAK
11" OAK
9" OAK
N: 504450.77 E: 2014564.21
N: 504543.01 E: 2014494.29
N: 504544.28 E: 2014582.14
N: 504455.34 E: 2014495.87
N: 504450.83 E: 2014567.81
TP
T P
T P
TP
SF SF SF SF SF SF
S F
S F
S F
S F
S F
S F
S F
SF SF SF SF SF SF SF SF
S F
S F
SF
SF
N: 504451.10 E: 2014582.74
N: 504504.98 E: 2014586.52
N: 504515.59 E: 2014582.67
N: 504432.25 E: 2014599.42
N: 504435.38 E: 2014604.27
N: 504508.92 E: 2014602.94
BY
DATE
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C300
144124113
KDH
CAC
KDH
EROSION PLAN
FEBRUARY 2026
NOTES
1. ALL PERTINENT EROSION AND SEDIMENTATION CONTROL DEVICES
SHALL BE IN PLACE PRIOR TO THE START OF ANY CONSTRUCTION
ACTIVITIES.
2. CONTRACTOR SHALL MAINTAIN EROSION AND SEDIMENTATION
CONTROL DEVICES THROUGHOUT THE DURATION OF THE PROJECT
AND PROVIDE ADDITIONAL BMP'S AS REQUIRED TO THE SATISFACTION
OF THE OWNER AND AT NO ADDITIONAL COST TO THE OWNER.
3. CONTRACTOR SHALL COORDINATE WITH CITY GROWTH MANAGEMENT
AND THE CITY'S ENVIRONMENTAL INSPECTOR.
4. ADDITIONAL SEDIMENT AND EROSION CONTROL MEASURES MAY BE
REQUIRED, DURING ANY PHASE OF DEVELOPMENT, AT THE
DISCRETION OF THE CITY OF TALLAHASSEE'S ENVIRONMENTAL
INSPECTOR.
5. THE CONTRACTOR SHALL ENSURE THAT A FOREMAN OR SUPERVISOR
WHO HAS BEEN CERTIFIED UNDER THE FLORIDA STORMWATER,
EROSION AND SEDIMENTATION CONTROL INSPECTOR TRAINING
PROGRAM IS AVAILABLE IN PERSON OR BY PHONE AT ALL TIMES
DURING CONSTRUCTION ACTIVITIES. INSPECTOR TO BE DESIGNATED
AND AVAILABLE AT THE PRE-CONSTRUCTION MEETING.
6. SILT FENCE SHOWN ON THESE PLANS SHALL BE INSTALLED
GENERALLY IN THE LOCATIONS INDICATED, ADJUSTED FOR FIELD
CONSTRAINTS. ALL PROPOSED SILT FENCE LOCATED WITHIN THE
CRITICAL PROTECTION ZONE OF A TREE SHALL BE OF A
NON-TRENCHED VARIETY, UNLESS AN ARBORICULTURAL MITIGATION
PLAN IS PROVIDED AND STATES OTHERWISE.
7. CONTRACTOR SHALL INSPECT AND REPAIR ALL BMP's AT LEAST ONCE
A WEEK, AND AFTER EVERY SIGNIFICANT RAIN EVENT (> 12" OF
RAINFALL.) A LOG OF SUCH INSPECTIONS SHALL BE MAINTAINED AT
THE SITE.
8. ANY BMP IN NEED OF REPAIR OR REINSTALLATION SHALL BE
CORRECTED BY THE CONTRACTOR WITHIN 24 HOURS OF
IDENTIFICATION OF THE NEED FOR SUCH CORRECTION.
9. ADDITIONAL BMP MEASURES MAY BE NECESSARY TO ENSURE THAT
TURBID WATER IS NOT DISCHARGED FROM THE CONSTRUCTION SITE.
THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE
WITH THE STORMWATER POLLUTION PREVENTION PLAN, THE
N.P.D.E.S. PERMIT AND THE CONDITIONS OF THE APPLICABLE NWFWMD
ENVIRONMENTAL RESOURCE PERMIT.
10. ALL DISTURBED AREAS TO BE LEFT IDLE LONGER THAN 14 DAYS MUST
BE STABILIZED WITH QUICK GROW GRASS SEED AND MULCH.
11. NO TRENCHING OR EXCAVATION SHALL BE ALLOWED WITHIN THE CPZ
OF PROTECTED TREES, EXCEPT WHERE DEBITS ARE NOTED ON A
TREE REMOVAL PLAN OR WHERE TREES ARE TO BE
IMPACTED/MITIGATED PER A TREE MITIGATION PLAN.
12. STREET SWEEPING WILL BE REQUIRED AS NECESSARY.
LEGEND
SOD (ARGENTINE BAHIA)
SILT FENCE
GRAPHIC SCALE IN FEET
5 10 20
NOTES
NORTH
SF
BID DOCUMENTS
TP TREE PROTECTION FENCE
SILT SOCK
THE INTENT OF THIS SEQUENCE IS TO MINIMIZE EROSION DURING INITIAL CONSTRUCTION. BMP'S MAY REQUIRE
MODIFICATION AS NECESSARY THROUGHOUT CONSTRUCTION ACTIVITY.
PRE-CONSTRUCTION ENVIRONMENTAL PROTECTION/INSPECTION SCHEDULE.
1. SCHEDULE A PRE-CONSTRUCTION MEETING WITH CITY OF TALLAHASSEE ENVIRONMENTAL INSPECTOR.
2. POST ALL PERMIT PLACARDS, INCLUDE NPDES NOTICE OF INTENT.
3. THE CONTRACTOR SHALL DESIGNATE (WITH WRITTEN DOCUMENTATION) AN ONSITE EROSION
CONTROL OFFICER WITH 24 HOUR CONTACT INFORMATION.
4. PROVIDE TREE PROTECTION ON TREES AS SHOWN.
5. INSTALL PERIMETER EROSION CONTROLS INCLUDING CONSTRUCTION ENTRANCE AND SOIL TRACKING
PREVENTION DEVICE.
CONSTRUCTION EROSION CONTROL ACTIVITIES:
1. CLEAR AND GRUB SITE.
2. COMPLETE SITE GRADING IN ACCORDANCE WITH GRADING PLAN.
3. COMPLETE REMAINDER OF SITE WORK INCLUDING FINAL GRADING AND PAVING.
4. CONSTRUCT BUILDING.
5. SOD AND SEED AS REQUIRED. ALL DISTURBED AREAS SHALL BE PERMANENTLY STABILIZED THROUGH
THE ESTABLISHMENT OF APPROPRIATE VEGETATIVE GROUND COVER UPON COMPLETION OF
DEVELOPMENT ACTIVITIES ON THE SITE.
EROSION CONTROL NOTES
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C310
144124113
KDH
CAC
KDH
EROSION
DETAILS
FEBRUARY 2026
BID DOCUMENTS
TO BE STABILIZED
AS REQUIRED
BASED ON FLOW
AND GRADE.
SECTION A-A
SLOPE TO DRAIN
(0.1 FT/FT MIN.)
COVER PER FDOT
INDEX NO. 205
5'
TRANSITION DETAIL
PIT VOLUME IS BELOW THE
INLET ELEVATION OR THE
OUTLET ELEVATION,
WHICHEVER IS LOWER.
SECTION B-B
EX
IS
T.
D
IT
C
H
EX
IS
T.
D
IT
C H
SLOPE TO DRAIN
B
B
A
A
SWALE
SL
O
PE
T
O D
R
AI
N (0
.1 M
IN
15' STD. FULL WIDTH 1-LANE
30' STD. FULL WIDTH 2-LANE
" M
IN
M
IN
APPROACH LENGTH
AS REQUIRED
4" M
IN
FILTER
FABRIC TYPE
D-1, FDOT
INDEX NO. 199
AGGREGATE
EXISTING OR
TEMPORARY SIDE
DRAIN PIPE
FILTER FABRIC
HAY BALES
HAY BALES
SEDIMENT PIT
APPROACH
LENGTH
CONSTRUCT PAVED TURNOUT
(FDOT INDEX NO. 515). MAY BE
DELIVERED IF APPROVED BY THE
ENGINEER
AGGREGATE
FILTER
FABRIC
50' STD
15' OR 30'
1:4
2:1
BERM
RURAL CONNECTION DETAIL
EXISTING
ROADWAY
EDGE OF
PAVEMENT
5'
SILT FLOW
1. SILT FENCE SHALL BE
FDOT TYPE IV OR
APPROVED EQUAL.
2. FOR EACH END POST,
FABRIC SHALL BE
FOLDED AROUND 2
POSTS ONE FULL TURN
AND SECURED WITH
FOUR STAPLES.
PLAN SECTION
OPTIONAL POST
POSITION
PRINCIPAL POST
(POSITION TOWARD FLOW)
FILTER FABRIC
(ATTACHED TO EACH POST
WITH FOUR STAPLES)
FILTER FABRIC
POST
4' M
IN 24
6"
1' -6
2'
-6
6' MAX
5' MIN
BACKFILL
6" X 6" ANCHOR
TRENCH
NOTES:
VE
R
TI
C
AL
INSTALLATION NOTES:
DRIPLINE
(TYP.)
NOTES:
1. 1" X 4" STRINGER
2. 4' HEIGHT "PERIMETER PLUS" CONSTRUCTION
FENCE BY CONWED PLASTICS OR APPROVED
EQUAL. SUBMIT PRODUCT INFORMATION FOR
APPROVAL PRIOR TO INSTALLATION.
3. 2" x 4" PRESSURE TREATED WOOD POSTS OR
2" DIAMETER OR LARGER PIPE.
A. POSTS SHALL BE DEEP ENOUGH IN THE GROUND TO BE
STABLE AND TO EXTEND TO A MINIMUM HEIGHT OF 4' ABOVE
THE GROUND.
B. SPACE POSTS EVERY 6' (MIN.) TO 8' (MAX.).
C. ONE 1" X 4" STRINGER BETWEEN ALL POSTS. SECURE FENCING
TO POST WITH NYLON CABLE TIES (AVAILABLE FROM CONWED
PLASTICS). WOOD STRIPS MAY BE ALSO BE USED TO PROVIDE
ADDITIONAL SUPPORT AND PROTECTION BETWEEN TIES AND
POSTS.
D. CRITICAL PROTECTION ZONE (CPZ) IS DETERMINED BY THE
AREA WITHIN THE CIRCLE DESCRIBE BY A RADIUS OF ONE
FOOT FOR EACH INCH OF THE TREE'S DIAMETER AT BREAST
HEIGHT. TREE PROTECTION SHALL BE PROVIDED AROUND
THE ENTIRE PERIMETER OF THE CPZ.
E. ANY DAMAGE TO TREE PROTECTION SHALL BE CORRECTED
IMMEDIATELY. NO ADDITIONAL PAYMENT.
F. IF WIRE TIES ARE USED, AVOID DIRECT CONTACT WITH FENCE.
WIRE MAY DAMAGE FENCE OVER TIME.
18" DBH
CPZ = 18 'RAD
4' M
IN
NOT TO SCALE
TREE PROTECTION2
C310
PLAN VIEW
ELEVATION
NOT TO SCALE
SILT FENCE3
C310
SECTION PLAN
NOTES:
1. ALL MATERIAL TO MEET
SPECIFICATIONS.
2. FILTER MEDIA TO MEET APPLICATION
REQUIREMENTS.
3. FILTER MEDIA TO BE DISPERSED ON
SITE, AS DETERMINED BY ENGINEER.
AREA TO BE
PROTECTED
WORK AREA
WORK AREA
AREA TO BE
PROTECTED
WATER FLOW
PAVEMENT OR
IMPERVIOUS
SURFACE
SILTSOXX OR APPROVED EQUAL
CONCRETE BLOCKS OR SAND
BAGS SIZED AS NEEDED (10' O.C.)
SILTSOXX OR APPROVED EQUAL
CONCRETE BLOCKS OR SAND
BAGS SIZED AS NEEDED (10' O.C.)
NOT TO SCALE
SILT SOCK ON PAVEMENT4
C310
NOT TO SCALE
SOIL TRACKING PREVENTION DEVICE (STPD)1
C310
X X
X X
X X
X X
X X
X
XXXXXXXX
13" OAK
11" OAK
9" OAK
' W
ID
E
BY
' T
AL
L O
VE
R
H
EA
D C
O
IL
IN
G
R O
LL
U
P
PO
W
ER
ED
G
AR
AG
E D
O O
R 25'58
44'
3'
5'
24'
5'
5'
5'
13'
PICNIC
TABLES
METAL
STORAGE
CONTAINER
TRANSFORMER
UG-E UG-E UG-E UG-E UG-E UG-E UG-E UG-E UG-E UG-E UG-E
U G
-E U
G -E
MECHANICAL
EQUIPMENT
N: 504530.47 E: 2014557.83
N: 504471.69 E: 2014514.89 N: 504472.48
E: 2014558.88
N: 504529.82 E: 2014521.79
PRE-ENGINEERED
METAL BUILDING,
SEE BUILDING PLAN
FOR FOUNDATION
INSTALL NEW 10' HIGH ATCT AREA FENCE
CONTRACTOR SHALL MODIFY FENCE FABRIC TO EXTEND
AT SWALE CROSSING CREATING A CONSISTENT
CLEARANCE TO FINAL GRADE ELEVATIONS.
INSTALL NEW 10' HIGH
ATCT AREA FENCE CLEAN AND REPAINT
EXISTING PARKING
MARKING (TYP.)
PROTECT IN PLACE
EXISTING PARKING
MARKING (TYP.)
±2' CURB
TRANSITION
PEDESTRIAN
DOOR
2' CURB TRANSITION
CR-G CURB RAMP
PEDESTRIAN DOOR
TIE INTO NEW FENCE AT
EXISTING FENCE POST
PRESERVE AND PROTECT
EXISTING AOA FENCE
PRESERVE AND PROTECT
EXISTING LIGHT POLE
ELECTRICAL SERVICE CONTRACTOR TO SUBMIT CITY ELECTRICAL
PERMIT AND COORDINATE WITH CITY ON EXACT
LOCATION OF NEW ELECTRICAL CONDUIT. ALL
COSTS ASSOCIATED WITH PERMITTING, LABOR,
AND MATERIALS TO PROVIDE POWER TO THE
BUILDING SHALL BE INCLUDED IN THE LUMP
SUM COST FOR THE BUILDING.
TIE IN NEW FENCE AT
EXISTNG FENCE POST
PROJECT LIMITS OF
DISTURBANCE
7,216 SF
PROJECT LIMITS
OF DISTURBANCE
52 SF
PROJECT
REMARKING
LIMITS
896 SF
1-STORY
METAL
STORAGE
BUILDING
FFE = 76.10'
INSTALL SPARE 2" CONDUIT FOR
FUTURE COMMUNICATIONS. FIELD
VERIFY STUB LOCATION POINTS
BY
DATE
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C400
144124113
KDH
CAC
KDH
SITE PLAN
FEBRUARY 2026
NOTES
1. EARTHWORK, INCLUDING EXCAVATION, OFFSITE BORROW MATERIAL,
HAULING, STOCKPILING AND COMPACTION, INSTALLATION OF
FOUNDATION, DOWNSPOUTS, SIDING, PEDESTRIAN DOORS, OVERHEAD
COILING ROLL UP GARAGE DOORS AND ANY OTHER INCIDENTALS
REQUIRED TO COMPLETE INSTALLATION OF THE PRE-ENGINEERED METAL
BUILDING SHALL BE INCLUDED IN THE LUMP SUM COST FOR THE BUILDING.
2. THE CONTRACTOR MUST OBTAIN CITY OF TALLAHASSEE BUILDING PERMIT
PRIOR TO CONSTRUCTION OF THE BUILDING. ALL ASSOCIATED COSTS
SHALL BE INCLUDED IN THE LUMP SUM COST FOR THE BUILDING.
3. FOR BUILDING SPECIFICATIONS AND REQUIRED FINISHES, SEE
SPECIFICATION 133419-1 AND SPECIFICATION 083323.
LEGEND
SOD
4" CONCRETE SIDEWALK
ATCT AREA FENCE
SEE DETAIL 1 SHEET
C412
GRAPHIC SCALE IN FEET
5 10 20
NORTH
6" CONCRETE LOADING PAD
BID DOCUMENTS
UNDERGROUND
ELECTRICAL SERVICEUG-E
LIMITS OF
DISTURBANCE
MARKING LIMITS
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C410
144124113
KDH
CAC
KDH
SITE DETAILS
FEBRUARY 2026
4" 3000 PSI CONCRETE
12" COMPACTED SUBGRADE
TO 98% MODIFIED PROCTOR
9'
6" WHITE
BID DOCUMENTS
6'-0"
±12"
8"
3" MAX.
2" MIN.
3/4" CHAMFERED
EDGE
6"
6"
8"
WHEEL STOP PROFILE
(TYP.)
WHEEL STOP FRONT
VIEW
12"
6"
8"
6"
12"
7" STD.
18"
1. WHEN USED ON THE HIGH SIDE OF ROADWAYS, THE CROSS SLOPE OF THE GUTTER
SHALL MATCH THE CROSS SLOPE OF THE ADJACENT PAVEMENT, AND THE
THICKNESS OF THE LIP SHALL BE 6".
2. PROVIDE CONTRACTION JOINTS PER FDOT SPECIFICATIONS.
6" 3000 PSI CONCRETE
12" COMPACTED SUBGRADE
TO 95% MODIFIED PROCTOR
5'2'VARIES
SEE GRADING PLAN 6:1 MAX
NOTE
ALL SIDEWALK JOINTS
SHALL BE IN ACCORDANCE
FDOT INDEX 522-001.
NOT TO SCALE
STANDARD CURB AND GUTTER DETAIL WITH PARKING WHEEL STOPS4
C410
NOT TO SCALE
CONCRETE DRIVEWAY TYPICAL SECTION1
C410
NOT TO SCALE
CONCRETE SIDEWALK TYPICAL SECTION2
C410
NOT TO SCALE
TYPICAL PARKING STALL MARKING3
C410
NO. 4 BARS, 18" LONG
(TWO PER GUARD)
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
C411
144124113
KDH
DJC
KDH
ELECTRICAL
DETAILS
FEBRUARY 2026
BID DOCUMENTS
NOT TO SCALE
SINGLE LINE DIAGRAM1
C411
M
100A METER SOCKET
A/
1P
A/
1P
A/
1P
R
EC
EP
TA
C
LE
C
IR
C U
IT
R
EC
EP
TA
C
LE
C
IR
C U
IT
BU
IL
D
IN
G L
IG
H
TI
N
G
100A/2P
(2) #10 AWG CU + (1) #10 GND
IN 1" CONDUIT
(N) 120/240V UTILITY TRANSFORMER
100A FUSED DISCONNECT
(N) PANEL 'P1', 100A, 120/240V,
1ɸ, 3W, 10KAIC, NEMA 1
(3) #3 AWG CU 75°C RATED IN
3" SCH 80 PVC CONDUIT
NTRL GND
#6 BOND
CAD WELD TO
GROUNDING SYSTEM
GROUND RODS
MINIMUM 6' APART
(3) #3 AWG CU 75°C RATED +
(1) #6 GND IN 3" SCH 80 PVC
CONDUIT
PROPOSED METER/DISCNNECT
NOT TO SCALE
PANEL SCHEDULE2
C411
AS SHOWN
REVISIONSNo. DATE
SHEET NUMBER
CHECKED BY
SCALE
DESIGNED BY
DRAWN BY
KHA PROJECT
© KIMLEY-HORN AND ASSOCIATES, INC.
2619 CENTENNIAL BOULEVARD, SUITE 200
TALLAHASSEE, FL 32308 PHONE: 850-553-3500
WWW.KIMLEY-HORN.COM
FAA TECHNICAL
OPERATIONS
SUPPORT
BUILDING
PRELIMINARY DOCUMENTS
.PREPARED FOR
TALLAHASSEE
INTERNATIONAL
AIRPORT
FENCE
DETAILS
C412
144124113
FEBRUARY 2026
BJG
MAC
CAC
' F
EN
C
E H
EI
G
H T
10' BRACE, END, AND CORNER PANELS 10' LINE PANELS
1'
DETAIL "A"
SEE DETAIL "B"
SEE DETAIL "A"
A
A
DETAIL "B"
10' ATCT AREA FENCE1
C412
1. ALL BACKFILL/EMBANKMENT MATERIAL, PLACEMENT AND COMPACTION
REQUIRED TO MAINTAIN THE 2" MAXIMUM GAP BETWEEN FENCE AND
GROUND AND TO BACKFILL AROUND CONCRETE POST BASES SHALL BE
INCIDENTAL TO THE PAY ITEM FOR FENCING. NO ADDITIONAL PAYMENT
SHALL BE MADE FOR EMBANKMENT.
2. POST FOOTING DIAMETER SHALL BE 12-INCHES OR 3 TIMES THE PIPE
OUTSIDE DIAMETER, WHICHEVER IS GREATER.
3. FENCE MATERIALS SHALL BE COMMERCIAL GRADE HOT DIPPED
GALVANIZED STEEL UNLESS OTHERWISE INDICATED.
4. ONLY LINE POSTS SHALL HAVE BARBED WIRE EXTENSION ARMS.
CORNER AND END POSTS SHALL HAVE DOME CAPS.
5. THE CONTRACTOR SHALL PROVIDE AND INSTALL NEW FENCE
COMPLETE WITH STEEL POSTS, CONCRETE FOOTINGS, GROUND RODS,
ETC. THE NEW FENCE FABRIC SHALL BE 9 GAUGE CHAIN LINK WIRE,
AND SHALL BE GALVANIZED STEEL IN CONFORMANCE WITH THE
REQUIREMENTS OF ASTM A 392, CLASS 2. THE NEW FENCE FABRIC
SHALL BE INSTALLED IN SUCH A MANNER THAT THE FENCE MAINTAINS
A UNIFORM APPEARANCE.
6. ALL TREES, BRUSH, STUMPS, LOGS AND OTHER DEBRIS SHALL BE
CLEARED AND GRUBBED A MINIMUM WIDTH OF 10 FEET ON EACH SIDE
OF FENCE. CLEARING AND GRUBBING OF THE FENCE LINE SHALL BE
INCIDENTAL TO FENCE INSTALLATION COSTS.
7. SIZES OF PIPES, SAG RODS, AND TURNBUCKLES FOR GATES SHALL BE
MANUFACTURER'S STANDARD MEETING REQUIREMENTS OF THIS
DRAWING AND SECTION F-162 OF THE SPECIFICATIONS.
8. THE TOP AND BOTTOM SELVAGE OF THE FENCE FABRIC SHALL BE
TWISTED AND BARBED.
9. SECTIONS OF FENCES, REGARDLESS OF LENGTH, ISOLATED BY GATES,
CAPS AT SPLICES, OR PLASTIC CONNECTORS, SHALL BE GROUNDED
INDEPENDENTLY.
10.THE #2 BARE SOFT DRAWN COPPER (BSDC) GROUND WIRE SHALL BE
ATTACHED TO THE TOP, CENTER, AND BOTTOM OF THE FENCE FABRIC
AND TO EACH STRAND OF BARBED WIRE BY A BIMETALLIC FASTENER.
11.TOP OF 5/8" x 8' COPPER CLAD GROUND ROD SHALL BE 6" BELOW
GRADE. GROUND RODS SHALL BE INSTALLED AT 500' MAXIMUM
SPACING.
12. WIRE OR…
This is the start of the file's text. The full file is on GovTribe.