7_Rework_Repair_ES7034.pdf

PDF 85 KB Posted

Attached to
B-52 Explosive Rotary Actuator Remanufacture
Solicitation number
FA8213-26-R-3013
Issued by

About this file

This document is a federal contract clause (ES7034) addressing the rework and repair of nonconforming material, effective January 2012.

The clause establishes distinct definitions and procedures for handling defective materials. Rework involves reprocessing nonconforming material to achieve complete conformance with drawings, specifications, and contract requirements. Repair, by contrast, involves reprocessing material to reduce but not eliminate nonconformance, bringing items into usable condition while they may still deviate from full specifications. Contractors must document rework procedures with associated inspection procedures and submit them to the Government Quality Assurance Representative (QAR) for review prior to implementation, with rework procedures subject to the QAR's disapproval authority. Repair procedures require submission on DD Form 1694 (Request for Deviation/Waiver) to the Contracting Officer for written approval before implementation. Both repair and rework submissions must include a description of the nonconformance cause and preventive actions to avoid recurrence. Rework and repair procedures must include reinspection provisions that supersede Technical Data Package requirements and provide government assurance that reprocessed items meet all reprocessing standards. This requirement applies as a supply chain flow-down obligation to contractors and their suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
Section L CADPAD 26 May 2026.pdf PDF
Section M CADPAD 26 May 2026.pdf PDF
9_CDRLS.pdf PDF
8_Item_Description.pdf PDF
6_SPI.pdf PDF
4_CADPAD_Marking_Instructions.pdf PDF
1_SOW.pdf PDF
FA8213-26-R-3013.pdf PDF
3_SOW Packaging.pdf PDF
3_ADC_SOW.pdf PDF
2_REPSHIP.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)