MRG Socorro Field Division LED Replacements
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
PRICE SCHEDULES
Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.
Offerors shall complete Price Schedules A, B, and C. Offers for less than the total of Schedules A, B, and C will be considered nonresponsive and will not be evaluated for award.
The Government will award Price Schedule A, Price Schedules A and B, or Price Schedules A, B, and C depending on available funds.
Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
See the contract clause WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for LIN 1.
SCHEDULE A - OFFICE AND MAINTENANCE BUILDINGS
| Line Item No. |
| Supplies or Services |
| Quantity and |
Unit Price Amount
| ). |
| Mobilization and Preparatory Work |
| For the lump sum of |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing office interior ceiling fluorescent lighting fixtures |
| 36 Each |
| $ |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing office exterior flood light fixtures |
| 3 Each |
| $ |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing interior maintenance bay lighting fixtures |
| 18 Each |
| $ |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing interior maintenance task lighting along the northisde of the building |
| 4 Each |
| $ |
| $ |
| ). |
| Removal, Recycle, and Disposal of existing maintenance building office, mezzanine, storage, and water closet |
| 10 Each |
| $ |
| $ |
| ). |
| Removal, Recylcing, and Disposal of existing exterior maintenance building flood lighting |
| 6 Each |
| $ |
| $ |
| ). |
| Furnish and Install new office interior ceiling LED light fixtures |
| 36 Each |
| $ |
| $ |
| ). |
| Furnish and Install new office exterior LED flood lights fixtures with motion sensors |
| 3 Each |
| $ |
| $ |
| ). |
| Furnish and Install new interior maintenance bay LED lighting fixtures |
| 18 Each |
| $ |
| $ |
| ). |
| Furnish and Install new interior maintenance LED task lighting along the northside of the building |
| 4 Each |
| $ |
| $ |
| ). |
| Furnish and Install new exterior maintenance LED lights fixtures in the office, mezzanine, storage, and water closet. |
| 10 Each |
| $ |
| $ |
| ). |
| Furnish and Install new exterior maintenance buidling LED flood lights with either motion or day/nigh sensors. |
| 9 Each |
| $ |
| $ |
| ). |
| Remove, Modify, Replace, and Install electrical switches, boxes, equipment, transformers, and circuits (wiring & conduits) for LED instgallations at the Office and Maintenance buildings |
| For the lump sum of |
| $ |
| Subtotal for Schedule A = |
| $ |
SCHEDULE B - LUBE, MRG EQUIPMENT, AND OIL STORAGE BUILDINGS
| Line Item No. |
| Supplies or Services |
| Quantity and |
Unit Price Amount
| ). |
| Removal, Recycling, and Disposal of existing Lube Building interior fluorescent lighting fixtures and conduits. Include the three exterior flood lights leaving coduits inplace reuse. |
| 11 Each |
| $ |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing MRG Equipment (Open Bay) exterior flood lighting fixtures |
| 4 Each |
| $ |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing interior Oil Storage building lighting fixtures |
| 4 Each |
| $ |
| $ |
| ). |
| Removal, Recycling, and Disposal of existing Oil Storage exterior lighting fixture |
| 1 Each |
| $ |
| $ |
| ). |
| Furnish and Install new interior MRG Equipment (Open Bay) LED lights fixtures |
| 12 Each |
| $ |
| $ |
| ). |
| Furnish and Install new exterior Lube Buidling and MRG Equipment (Open Bay) building LED flood lights with motion sensors. |
| 7 Each |
| $ |
| $ |
| ). |
| Furnish and Install new interior Oil Storage Building LED lights fixtures |
| 12 Each |
| $ |
| $ |
| ). |
| Furnish and Install new exterior Oil Storage Building LED flood lights with motion sensors. |
| 1 Each |
| $ |
| $ |
| ). |
| Remove, Modify, Replace, and Install electrical switches, boxes, equipment, transformers, and circuits (wiring & conduits) for LED instgallations at the MRG Equipment (Open Bay) and Oil Storage buildings |
| For the lump sum of |
| $ |
| Subtotal for Schedule B = |
| $ |
| Total for Schedules A and B = |
| $ |
SCHEDULE C - ENTRANCE GATES
| Line Item No. |
| Supplies or Services |
| Quantity and |
Unit Price Amount
| ). |
| Modify and/or Install electrical circuits (wiring, conduits, and pull boxes) for LED installations at the Main Entrances to the SFD facility in support of the new LED light fixtures |
| 2 Each |
| $ |
| $ |
| ). |
| Furnish and Install new exterior LED flood lights with motion sensors |
| 2 Each |
| $ |
| $ |
| Subtotal for Schedule C = |
| $ |
| Total for Schedules A, B, and C = |
| $ |
WARRANTED CHARACTERISTICS
The Offeror’s warranties in workmanship (installation) work for a minimum of one year.
(1) The manufacture’s warranties shall meet industry standard for LED lighting fixtures a minimum is 5 years.
Price Schedule B - 1