This is Addendum No. 1 to RFP-0657-TPD, issued by the Gila River Indian Community for design services for District 4 Subdivision Sites 1 and 6, dated September 22, 2026. The addendum clarifies ten critical points raised by prospective bidders regarding project scope, timeline, and deliverables. The correct project completion timeframe is 360 days from the issuance of a Notice to Proceed, not 180 days as initially stated in one section. The project location is confirmed as District Four, correcting previous language referencing District Three. The RFP does not impose page limits on proposals or specific file naming conventions for documents submitted through Bonfire. Archaeological data recovery has been previously completed by the Gila River Indian Community Cultural Resources Management Program in November 2018, eliminating the need for additional archaeological consultant services.
The selected consultant's scope includes comprehensive design services encompassing all offsite utility and roadway improvements necessary to serve the subdivisions, including sewer force mains, waterline extensions, roadway widening, turn lanes, and utility upgrades beyond subdivision boundaries. The consultant must prepare formal Traffic Impact Studies for both sites and conduct full utility capacity analyses and modeling as part of the design effort. Consultant fees must include attendance and presentations to the Community, District Four Executive Committee, and stakeholders beyond standard project management meetings. The selected firm is responsible for leading coordination with the Bureau of Indian Affairs for encroachment permits and preparation and processing of BIA permit applications. No pricing terms, set-aside provisions, or funding sources are specified in this addendum document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB-0657-TPD: Addendum No. 1 Page 1 of 2
Addendum No. 1 for RFP-0657-TPD
DESIGN SERVICES FOR DISTRICT 4 SUBDIVISION SITES 1 AND 6
Dated September 22, 2026
Question & Answers:
1. Section I. E. (Design Timeline) and Section III (Scope of Work) both state services must be completed within 360 days of Notice to Proceed. However, Section IV. D.
(Completion Time) states services shall be completed within 180 days. Can you clarify the timeframe since it will affect our schedule and current workload narrative?
• The correct timeframe is 360 days from the issuance of a Notice to Proceed.
2. The cover page, scope of work, and project title all reference District 4 Subdivision
Sites 1 and 6. However, Section I. C. (Location) states "The project is located within District Three of the Community." This is likely leftover language from a prior RFP, but we just wanted to note the inconsistency and seek clarification that this is indeed District 4.
• Reference to District Three is leftover language from a prior RFP. The project is located in District Four.
3. The RFP does not specify a page limit for the proposal. Can you please confirm whether any such restrictions apply?
• There is no page limit.
4. The RFP does not specify a required file naming convention for documents uploaded to
Bonfire (e.g., Proposal, Exhibits A–G, Licenses/Certifications, W9, Insurance Certificates). Can you please confirm if a specific naming format is preferred to ensure proper identification during evaluation?
• There is no specific naming format.
5. Is archaeological data recovery for Site 6 being completed directly by Gila River Indian
Community Cultural Resources Management Program, or should the selected consultant include archaeological consultant services and associated costs within their scope and fee proposal?
• In November of 2018, GRIC-CRMP provided reports for both subdivision sites. No additional archaeological consultant services are needed.
IFB-0657-TPD: Addendum No. 1 Page 2 of 2
6. Please confirm whether the selected consultant's scope includes design of all offsite utility and roadway improvements necessary to serve the subdivisions, including sewer force mains, waterline extensions, roadway widening, turn lanes, and utility upgrades beyond the subdivision boundaries.
• Scope shall include design of all offsite utilities and roadway improvements, etc.
7. Will Gila River Indian Community DOT and BIA require formal Traffic Impact Studies for Sites 1 and 6, and should preparation of these studies be included in the consultant's scope and fee proposal?
• Yes
8. Has Gila River Indian Community DPW formally confirmed available water and wastewater system capacity for both subdivision sites, or should the selected consultant perform full utility capacity analyses and modeling as part of the design effort?
• Analysis and modeling will need to be a part of the design.
9. Please clarify anticipated Community, District Four Executive Committee, and stakeholder presentation requirements throughout design. Should consultant fees include attendance and presentations beyond project management meetings identified in the RFP?
• Yes
10. Will Gila River Indian Community lead coordination with the Bureau of Indian Affairs for encroachment permits, or is preparation and processing of BIA permit applications expected to be provided by the selected consultant?
• Selected firm to lead coordination with BIA