7_ES7034.pdf
PDF 57 KB Posted
- Attached to
- B-2 Manually Actuated Initators Federal contract opportunity
- Solicitation number
- FA821323R3030
About this file
This document outlines rework and repair procedures for nonconforming materials on federal contracts. It defines rework as reprocessing material to fully conform to requirements, while repair reduces but does not eliminate nonconformance. Contractors must submit documented rework procedures to the Government Quality Assurance Representative for review before using, but submit repair procedures on a Request for Deviation/Waiver to the Contracting Officer for written approval. Submissions must describe the nonconformance cause and corrective actions. Rework and repair procedures must include reinspection taking precedence over technical requirements and provide assurance items meet processing standards. These flow down requirements apply to contractors, suppliers, vendors and subcontractors.
The related federal contract opportunity is a solicitation from the Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base for manually actuated initiators for the B-2 bomber.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 8b_JFQR_01-650-4860.pdf | ||
| Solicitation.pdf | ||
| 11_CDRLS.pdf | ||
| 8a_JFQR_01-521-3457.pdf | ||
| 03_ADC_SOW.pdf | ||
| 02_RepShip.pdf | ||
| 6_SPI.pdf | ||
| 5_PHST_SOW.pdf | ||
| 10b_EDL_4860.pdf | ||
| 9b_ITEM_DESCRIPTION_016504860.pdf | ||
| 01_AIR_SPEC.pdf | ||
| 10a_EDL_3457.pdf | ||
| 9a_ITEM_DESCRIPTION_015213457.pdf | ||
| 4_CADPAD_Item_Marking.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)
(ES7034)
File details come from the government source that posted it. Updated .