7_ES7034 (AS Attach.pdf

PDF 84 KB Posted

Attached to
F-15 Initiator Federal contract opportunity
Solicitation number
FA8213-24-Q-3006
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document is an attachment titled "REWORK AND REPAIR OF NONCONFORMING MATERIAL" that provides details on the rework and repair procedures for nonconforming material under a federal contract.

The attachment defines rework as reprocessing nonconforming material to make it fully conform to drawings, specifications, or contract requirements, and repair as reprocessing nonconforming material to reduce but not eliminate the nonconformance in order to make it usable. The contractor must document rework and repair procedures and submit them to the Government Quality Assurance Representative (QAR) or Contracting Officer for review and approval prior to implementation. The submission must include the cause of the nonconformance and actions to prevent recurrence. Rework and repair requirements flow down to the contractor's suppliers, vendors, and subcontractors. This attachment is relevant to the F-15 Initiator contract opportunity (Solicitation # FA8213-24-Q-3006) with the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base.

View the file

Other files for this federal contract opportunity

Other files attached to F-15 Initiator, newest first.
File Type Posted
FA8213-24-Q-3006.pdf PDF
4_CADPAD Item Marking Instruction - Ver 1.6_Mar 2023.pdf PDF
8_GFM Letter_24-51513 PVU-1A Primers.pdf PDF
2_REPSHIP 11 Mar 14.pdf PDF
9_IDs Combined.pdf PDF
1_SOWAppendixA_24-51513.pdf PDF
11_CDRLs_FD2020-24-51513.pdf PDF
5_PHST SOW.pdf PDF
6_SPI_001383770.pdf PDF
3_ADC SOW Jan 2018.pdf PDF
10_CPM Original SPREADSHEET.xls XLS spreadsheet
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)