7 Drawings.pdf
PDF 13 MB Posted
- Solicitation number
- 36C24825R0116
About this file
These are engineering and architectural drawings for a Sanitary Riser Replacement project at the James A. Haley Veterans Affairs Medical Center in Tampa, Florida. The project involves replacing and upgrading the existing Sanitary Riser #5 in Building One, with detailed site utility plans showing demolition and proposed utility configurations. The drawings, prepared by Christopher A. Gmuer (Florida PE #71599), are dated February 15, 2024, with an issue date of May 24, 2024, and include comprehensive technical specifications for wastewater system construction, including requirements for pipe installation, manhole construction, trench preparation, and final acceptance procedures.
The associated federal contract opportunity is a pre-solicitation notice for a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside contract, with an estimated value between $1,000,000 and $2,000,000. The project uses NAICS code 236220 (Commercial and Institutional Building Construction) and is planned for release as a Request for Proposal (RFP) by the end of June 2025. The contracting team includes Stacy Figlinski as the Contracting Officer and David Hernandez as the Contracting Specialist, with the project specifically targeting SDVOSBs registered in SAM.gov for the sanitary riser upgrade at the Tampa VAMC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 7b Vol2 Specifications.pdf | ||
| 5 SOW 673-21-154.docx | DOCX document | |
| 36C24825R0116.docx | DOCX document | |
| 7a Vol1 Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2024-05-21 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TAMPA VAMC SANITARY RISER
REPLACEMENT
TAMPA, FL
673-21-154
Project Director
02-15-2024 05-24-2024
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CAG ABG
Fi le
: 2 2-
-C -1
S
IT
E.
D W
G
LA
ST
S
AV
ED
: 2
4-
-2
:1 8:
P
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
4-
-2
:1 8:
P
M
U
SE
R : C hr is
G
DESIGN ELEMENTS AND INFORMATION FURNISHED BY
OTHERS
1. THE ENGINEER AND ITS CONSULTANTS PREPARED THESE PLANS AND DESIGN DOCUMENTS THROUGH THE USE OR
RELIANCE UPON DESIGN ELEMENTS AND INFORMATION ORDINARILY OR CUSTOMARILY FURNISHED BY OTHERS, INCLUDING, BUT NOT LIMITED TO, SURVEYORS, GEOTECHNICAL ENGINEERS, ENVIRONMENTAL CONSULTANTS, ARCHITECTS, BUILDING SYSTEMS ENGINEERS, SPECIALTY CONTRACTORS, MANUFACTURERS, SUPPLIERS, AND THE PUBLISHERS OF TECHNICAL STANDARDS. THE ENGINEER SHALL NOT BE HELD RESPONSIBLE FOR DESIGN ERROR
AND OMISSIONS RESULTING FROM THE QUALITY OF THIS INFORMATION.
2. ALL POINTS OF COORDINATION OR INTERFACE BETWEEN THESE PLANS AND DESIGN DOCUMENTS AND THE PLANS
AND DESIGN DOCUMENTS OF OTHERS MUST BE COMPARED BY THE CONTRACTOR.
3. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES BEFORE PROCURING MATERIALS AND
INSTALLATION.
UTILITY LOCATES, RELOCATION, PROTECTION, AND
TERMINATION
1. UTILITY LOCATES SHALL BE COMPLETED BY THE CONTRACTOR PRIOR TO THE INITIATION OF SITE CONSTRUCTION.
2. PROPOSED UTILITY TAPS AND CROSSINGS SHALL BE PHYSICALLY LOCATED AND VERIFIED BY THE CONTRACTOR AS
SOON AS PRACTICABLE AND SHALL CONTACT THE ENGINEER IMMEDIATELY WITH ANY DISCREPANCIES OR
CONFLICTS.
3. UTILITY RELOCATION, SUPPORT, PROTECTION, TERMINATION, CAPPING, AND REMOVAL SHALL BE COORDINATED BY THE CONTRACTOR WITH UTILITY COMPANIES. ADEQUATE TIME SHALL BE PROVIDED FOR PROPER COORDINATION
AND TO MINIMIZE SERVICE INTERRUPTIONS.
4. CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES TO THE UTILITY COMPANY FOR THEIR
SERVICES.
SAFETY AND TEMPORARY TRAFFIC CONTROL
(MAINTENANCE OF TRAFFIC)
1. ALL SAFETY REGULATIONS AND PRACTICES SHALL BE ENFORCED BY THE CONTRACTOR THROUGHOUT THE
DURATION OF THIS PROJECT. THIS ALSO INCLUDES THE TRAVELING PUBLIC. THE FOLLOWING IS A NOTICE TO THE CONTRACTOR AND DOES NOT IMPLY THAT THE OWNER OR ENGINEER WILL INSPECT OR ENFORCE SAFETY
REGULATIONS.
2. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) REGULATIONS.
3. ALL SUBSURFACE CONSTRUCTION SHALL CONFORM TO THE PROVISIONS SET FORTH BY THE "TRENCH SAFETY ACT".
4. TEMPORARY TRAFFIC CONTROL (TTC) IS REQUIRED FOR ALL WORKS ON HIGHWAYS, ROADS, STREETS, BIKE LANES, SIDEWALKS AND SHALL HAVE A TTC PLAN. THE PLAN SHALL BE PREPARED BY A PROFESSIONAL ENGINEER THAT IS FDOT ADVANCED MOT CERTIFIED AT THE COST OF THE CONTRACTOR. ALL WORK SHALL BE EXECUTED UNDER THE ESTABLISHED TTC PLAN AND THE REVIEWING AGENCY'S APPROVED PROCEDURES. THE PLAN AND WORK SHALL BE
AT THE CONTRACTOR'S EXPENSE.
GENERAL AND MISCELLANEOUS NOTES
1. THESE PLANS, DESIGN DOCUMENTS, AND NOTES ARE NOT EXHAUSTIVE. ALL THE APPLICABLE CONSTRUCTION
STANDARDS AND DETAILS THAT ARE LISTED, REFERENCED, OR IMPLIED ARE INCLUDED IN THE CONTRACT
DOCUMENTS BY REFERENCE.
2. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE REVIEWING AGENCY REQUIREMENTS ARE NOT IN
AGREEMENT, THE MOST STRINGENT SHALL GOVERN.
3. THE REPAIR OF DAMAGE EITHER ABOVE OR BELOW GROUND BY THE CONTRACTOR OR SUB-CONTRACTORS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. DAMAGE WILL BE IN THE OPINION OF THE OWNER, APPLICABLE AGENCY, OR ENGINEER. ALL REPAIRS SHALL BE MADE AT CONTRACTOR EXPENSE IN A MANNER SPECIFIED BY THE
PARTICULAR ENTITY.
4. CONTRACTOR IS RESPONSIBLE FOR GRADING ALL PAVEMENT, SIDEWALKS, AND GRADING AROUND BUILDINGS TO DRAIN POSITIVELY. INTERSECTIONS SHALL BE TRANSITIONED TO PROVIDE SMOOTH DRIVING SURFACE WHILE
MAINTAINING POSITIVE DRAINAGE.
5. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY OBSERVED AREAS OF POOR DRAINAGE PRIOR TO PLACEMENT
OF CURBS OR PAVEMENT COURSES.
6. ALL UNDERGROUND UTILITIES MUST BE INSTALLED, INSPECTED, AND TESTED PRIOR TO PAVEMENT BASE OR
SIDEWALK INSTALLATION.
EROSION CONTROL AND STABILIZATION
1. CONTRACTOR IS REQUIRED TO SUBMIT A COMPLETE NOI AND APPROPRIATE FEE TO SECURE A FDEP GENERIC
PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (CGP) AT LEAST TWO DAYS BEFORE CONSTRUCTION BEGINS. A PERMIT IS REQUIRED FOR CONSTRUCTION ACTIVITIES THAT DISTURB ONE OR MORE ACRES OR IF THE PROJECT IS PART OF A LARGER DEVELOPMENT THAT WILL ULTIMATELY DISTURB ONE
OR MORE ACRES.
2. PROJECTS THAT DISCHARGE STORMWATER TO AN MS4, A COPY OF THE NOI MUST ALSO BE SUBMITTED TO THE
OPERATOR OF THE MS4.
3. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR OBTAINING PERMIT COVERAGE AND IMPLEMENTING APPROPRIATE POLLUTION PREVENTION TECHNIQUES TO MINIMIZE EROSION AND SEDIMENTATION FROM STORMWATER DISCHARGES DURING CONSTRUCTION. THE ENGINEER SHOULD NOT BE LISTED AS THE OPERATOR
AS THEY DO NOT HAVE OPERATIONAL CONTROL OVER THE PROJECT.
4. WHEN THE OPERATOR CHANGES, THE NEW OPERATOR SHOULD OBTAIN PERMIT COVERAGE AT LEAST 2 DAYS BEFORE ASSUMING CONTROL OF THE PROJECT, AND THE PREVIOUS OPERATOR SHOULD FILE AN NPDES STORMWATER NOTICE OF TERMINATION WITHIN 14 DAYS OF RELINQUISHING CONTROL OF THE PROJECT TO A NEW
OPERATOR.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL EROSION AND SEDIMENTATION CONTROLS UNTIL
THE CONTRIBUTING DISTURBED AREAS ARE STABILIZED.
6. ALL DISTURBED AND OPEN AREAS OF THE SITE SHALL BE SODDED UNLESS INDICATED OTHERWISE.
PERMITTING, CONSTRUCTION STANDARDS, SUBMITTALS,
REQUESTS FOR INFORMATION, INSPECTIONS, TESTING,
PUNCH LISTS, RECORD DRAWINGS, AND AS-BUILTS
1. SITE CLEARING AND DEMOLITION MAY NOT BE ABLE TO BEGIN UNTIL CERTAIN PERMITS HAVE BEEN ISSUED AND MAY
REQUIRE PRE-CONSTRUCTION MEETINGS, INSPECTIONS, CLEARANCES. THESE PERMITS ARE TYPICALLY ISSUED BY
THE APPLICABLE WATER MANAGEMENT DISTRICT AND THE MUNICIPALITY.
2. OTHER PERMITS ARE REQUIRED PRIOR TO COMPLETING OTHER SITE COMPONENTS SUCH AS THE UTILITY
CONSTRUCTION PERMITS, DRIVEWAY CONNECTION PERMITS, ROW USE PERMITS, ETC.
3. CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH AND OBTAINING ALL REQUIRED PERMITS, BONDS, TESTING, INSPECTIONS, CERTIFICATIONS, ETC. PRIOR TO AND DURING CONSTRUCTION (E.G. FDEP CGP, DEWATERING, MOT, WATER/SEWER INSPECTIONS).
4. A COMPLETE SET OF PERMITTED DRAWINGS AND SPECIFICATIONS MUST BE MAINTAINED ON SITE AT ALL TIMES
THAT THE CONTRACTOR IS PERFORMING WORK.
5. THE CONTRACTOR IS RESPONSIBILITY TO VERIFY THE CONSTRUCTION STANDARDS APPLICABLE TO EACH PORTION OF THE PROJECT. A SUGGESTED LIST OF APPLICABLE STANDARDS TYPICALLY ACCOMPANY THIS NOTE ON THIS
PLAN SHEET.
6. CONTRACTOR SHALL FURNISH SHOP DRAWINGS TO THE ENGINEER INDICATING MATERIALS AND MANNER OF INSTALLATION FOR ALL COMPONENTS OF THE PROJECT PRIOR TO PROCUREMENT OF MATERIALS AND INSTALLATION (E.G. PRECAST STRUCTURES, MANUFACTURED ITEMS). FAILURE TO OBTAIN APPROVAL BEFORE
INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE
7. ALL REQUESTS FOR INFORMATION SHALL BE SUBMITTED TO THE ENGINEER FOR RESPONSE BEFORE COMMENCING
THE RELATED WORK VIA THE OWNER'S CONSTRUCTION DOCUMENTATION PROCESS.
8. CONTRACTOR IS RESPONSIBLE FOR COMPILING A LIST INSPECTIONS AND FIELD VISITS DESIRED BY THE OWNER
AND THE ENGINEER AND REASONABLY SCHEDULING THOSE INSPECTIONS.
9. CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND COORDINATING ALL INSPECTIONS REQUIRED BY THE REVIEWING AGENCIES AS LISTED IN THE PERMITS, INSPECTOR'S REQUEST, OR IMPLIED BY THE DESIGN STANDARDS.
10. CONTRACTOR SHALL CONTRACT WITH AN INDEPENDENT TESTING LABORATORY TO PERFORM TESTING OF MATERIALS, SOILS, UTILITIES, ETC. THE TESTING SHALL BE IN ACCORDANCE WITH THE APPROVED PERMITS, CONSTRUCTION STANDARDS, INSPECTOR'S REQUEST, DESIGN REPORTS, AND STANDARD PAVING AND GRADING TESTING. THIS SHALL INCLUDE DENSITY TESTING IN ALL PAVEMENT AREAS, UTILITY TRENCH COMPACTION ESPECIALLY UNDER ROADS AND OTHER PAVED AREAS, CONCRETE, AND OTHER MATERIALS TESTING.
11. SHOULD ANY RETESTING BE REQUIRED DUE TO THE FAILURE OF ANY TESTS TO MEET THE REQUIREMENTS, THE CONTRACTOR IS RESPONSIBLE FOR ALL RETESTING COSTS AND ANY RECONSTRUCTION REQUIRED TO MEET THE
TESTING REQUIREMENTS.
12. CONTRACTOR SHALL COORDINATE WITH THE ENGINEER THE SCHEDULE OF PUNCH LIST SITE VISITS WITH THE CONSTRUCTION SCHEDULE TO AVOID REPEAT VISITS. A TIMELINE OF ADDRESSING THE PUNCH LIST ITEMS SHALL BE PROVIDED IN A TIMELY MANNER. ANY DISPUTES SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER AND THE
ENGINEER.
13. RECORD DRAWINGS ARE DEFINED AS NOTES AND OTHER DOCUMENTATION COLLECTED BY THE CONTRACTOR THROUGHOUT CONSTRUCTION AS IT RELATES TO INSTALLATION PROGRESS, FIELD CONDITIONS, MEANS, METHODS, DEVIATIONS, AND OTHER VARIATIONS FROM THE CONTRACT DOCUMENTS. THE DOCUMENTATION MUST BE MADE AVAILABLE TO THE OWNER, ENGINEER, AND REVIEWING AGENCIES UPON REQUEST. RECORD DRAWINGS ARE NOT INTENDED TO BE EXHAUSTIVE, HOWEVER, VERIFICATION OF INSTALLED CONDITIONS CAN BE REQUESTED AT THE
COST OF THE CONTRACTOR UTILIZING STANDARD METHODS.
14. CONTRACTOR SHALL CONFIRM REQUIREMENTS TO PROVIDE COMPLETE AS-BUILT INFORMATION TO THE OWNER, ENGINEER, AND REVIEWING AGENCIES AT THE COST OF THE CONTRACTOR.
15. AS-BUILTS ARE DEFINED AS A DRAWING PRODUCED BY A REGISTERED LAND SURVEYOR BASED ON FIELD MEASUREMENTS OF THE FINISHED SITE IMPROVEMENTS WITH LOCATIONS, ELEVATIONS, AND DESCRIPTION OF IMPROVEMENTS. THEY SHOULD MEET REVIEWING AGENCIES REQUIREMENTS PER PERMIT AND CLOSEOUT REQUIREMENTS. THEY SHOULD ALSO MEET THE OWNER'S NEED FOR LENDING, WARRANTEE, AND OTHER
REQUIREMENTS.
16. AS-BUILTS CONTAIN AT A MINIMUM: BUILDING LOCATION AND FINISHED FLOOR ELEVATIONS, ACCESSIBLE ROUTE AND PARKING GRADES, PAVEMENT GRADE BREAKS, GRAVITY STRUCTURE TOP ELEVATIONS AND PIPE SIZES AND INVERTS, PRESSURE SYSTEM FITTINGS AND VALVES, SAMPLING POINTS, STORMWATER FACILITY TOP AND BOTTOM PERIMETERS AND OTHER FEATURES, OUTFALL STRUCTURE DETAILS, ETC. AND OTHER LOCATIONS WHERE FIELD
CONDITIONS DO NOT MATCH THE CONTRACT DOCUMENTS.
17. ADDITIONAL AS-BUILT INFORMATION MAY BE REQUIRED DURING CONSTRUCTION INSTALLATIONS AT CRITICAL AREAS. THIS INCLUDES BUT IS NOT LIMITED TO PIPE CROSSINGS OF WATER MAINS WITH LESS THAN 18 INCHES OF CLEARANCE OR WHEN PARALLEL UTILITIES WITH WATER MAINS HAVE LESS THAN 10 FEET OF CLEARANCE.
WARRANTIES
1. IF NOT SPECIFICALLY INDICATED IN THE CONTRACT DOCUMENTS, ALL IMPROVEMENTS SHALL BE WARRANTED BY
THE CONTRACTOR TO THE OWNER FOR A PERIOD OF ONE YEAR FROM DATE OF ACCEPTANCE BY THE OWNER. THIS WARRANTEE WILL ALSO EXTEND TO THE MAINTENANCE ENTITY OF ANY OTHER IMPROVEMENTS INCLUDING ROADS, SIDEWALKS, UTILITIES, STORM PIPING, ETC. OR TO THE EXTENT REQUIRED BY THEIR APPLICABLE DESIGN
STANDARDS.
GENERAL LEGEND - SEE PLANS FOR ADDITIONAL CALLOUTS
EXISTING CABLE
EXISTING COMMUNICATIONS
EXISTING ELECTRIC OVERHEAD
EXISTING ELECTRIC UNDERGROUND
EXISTING FIBER OPTIC
EXISTING FIRE
EXISTING FORCEMAIN
EXISTING GAS
EXISTING RECLAIMED WATER
EXISTING STORM
EXISTING TELEPHONE
EXISTING WATER
PROPOSED CABLE
PROPOSED COMMUNICATIONS
PROPOSED ELECTRIC OVERHEAD
PROPOSED ELECTRIC UNDERGROUND
PROPOSED FIBER OPTIC
PROPOSED FIRE
PROPOSED FORCEMAIN
PROPOSED GAS
PROPOSED RECLAIMED WATER
PROPOSED STORM
PROPOSED TELEPHONE
PROPOSED WATER
EXISTING ELEVATION CONTOUR
PROPOSED ELEVATION CONTOUR
SWALE CENTERLINE
PROPOSED GRADE SPOT ELEVATION
SILT FENCE
TREE BARRICADE
SETBACK
BUFFER
PROPERTY BOUNDARY
EXISTING FENCE
CABLECABLE
COMCOM
OHEOHE
UGEUGE
FIBERFIBER
FIREFIRE
FMFM
GASGAS
RCWRCW
STORMSTORM
TELTEL
WMWM
CABLECABLE
COMCOM
OHEOHE
UGEUGE
FIBERFIBER
FIREFIRE
FMFM
GASGAS
RCWRCW
STORMSTORM
TELTEL
WWWW
SILTSILT
TREETREE
99.99
STANDARD
ABBREVIATIONS
ADJ ADJACENT
ALUM ALUMINUM
APT APARTMENT
ASPH ASPHALT
B&J BORE & JACK
BLDG BUILDING
BM BENCHMARK
BOC BACK OF CURB
BOW BOTTOM OF WALL
BSL BUILDING SETBACK LINE
C&G CURB & GUTTER
C1 CURVE ONE
CATV CABLE TELEVISION
CEC CLAY ELECTRIC COOPERATIVE
CF CUBIC FEET
Cl CAST IRON
CIP CAST-IN-PLACE
CL CENTER LINE
CLF CHAIN LINK FENCE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
C/O CLEAN OUT
COMM COMMUNICATIONS
CONC CONCRETE
CY CUBIC YARD
DBI DITCH BOTTOM INLET
DDCBP DOUBLE DETECTOR CHECK BACKFLOW
PREVENTER
DEG DEGREES
DHWL DESIGN HIGH WATER LEVEL
DI DUCTILE IRON
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
E EAST
EL ELEVATION
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
ERCP ELLIPTICAL REINFORCED CONCRETE PIPE
ESMT EASEMENT
EX EXISTING
FOC FACE OF CURB
FDC FIRE DEPARTMENT CONNECTION
FFE FINISH FLOOR ELEVATION
FG FINISH GRADE
FH FIRE HYDRANT
FL FIRE LINE
FM FORCE MAIN
FO FIBER OPTIC
FP FLOOD PLAIN
FT FEET
FUT FUTURE
GALV GALVANIZED
GV GATE VALVE
HC HANDICAP
HORIZ HORIZONTAL
HR HOUR
INV INVERT
LF LINEAR FEET
L1 LINE ONE
LAT LATITUDE
LONG LONGITUDE
LT LEFT
MAINT MAINTENANCE
MAX MAXIMUM
MES MITERED END SECTION
MH MANHOLE
MIN MINIMUM
MO MONTH
MUTCD MANUAL ON UNIFORM TRAFFIC DESIGN
N NORTH
N/A NOT APPLICABLE
NE NORTH EAST
NG NATURAL GRADE
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
NW NORTH WEST
OC ON CENTER
PE PROFESSIONAL ENGINEER
POB POINT OF BEGINNING
POE POINT OF ENDING
PL PROPERTY LINE
PRI PRIMARY
PRM PERMANENT REFERENCE MARKER
PSI POUNDS PER SQUARE INCH
PUE PUBLIC UTILITY EASEMENT
PUD PLANNED URBAN DEVELOPMENT
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
RCP REINFORCED CONCRETE PIPE
REF REFERENCE
ROW RIGHT OF WAY
RPZBP REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
RT RIGHT
S SOUTH
S/W SIDEWALK
SE SOUTH EAST
SF SQUARE FEET
SG SWITCH GEAR
SPC SPACE
SS SANITARY SEWER
ST STORM SEWER
STCO STORM CLEANOUT (TYP ROOF DRAINS)
STA STATION
STD STANDARD
STL STEEL
SW SOUTH WEST
SY SQUARE YARD
TBRC TRAFFIC BEARING RING & COVER
TEL TELEPHONE
TX TRANSFORMER
TV TELEVISION
TOW TOP OF WALL
TYP TYPICAL
UTIL UTILITY
VCP VITRIFIED CLAY PIPE
VEH VEHICLE
W WEST
W/ WITIH
W/WW WATER / WASTEWATER
WM WATER MAIN
WS WATER SERVICE
WW WASTEWATER
YR YEAR
SITE UTILITY NOTES, DETAILS, AND LEGEND
C-010
PIPE DEPTH AND SLOPE AS
REQUIRED BY CONSTRUCTION
SPECIFICATIONS AND DRAWINGS
PIPE DEPTH AND SLOPE AS
REQUIRED BY CONSTRUCTION
SPECIFICATIONS AND DRAWINGS
TAPED AT 12:00
2"
2" 2"
WASTEWATER MAIN
(PVC OR D.I., ALL DIA.)
1 CITY MAINTAINED
SERVICE LATERAL
4" OR 6" SDR-35 PER PLAN
3 6
SEE NOTES
2 AND 5
PLAN
3 5
SECTION
ITEM
DESCRIPTION
6" or 8" X 4" OR 6" 4" or 6" 4" or 6" 4" or 6" 4" or 6" 4" or 6"
GRAVITY MAIN WYE
CLEANOUT WYE
SERVICE LATERAL PIPE CONNECTION
PVC CAP, PLUMBING CONNECTION
CLEANOUT ADAPTER W/ THREADED PLUG
PLUMBING CONNECTION
PROHIBITED AT STANDPIPE
ITEM
DESCRIPTION
4"x4" FERNCO COUPLING (OR 6"x6" PER PLAN)
CUSTOMER'S SERVICE LATERAL PIPE
4" OR 6" PVC SERVICE LATERAL PIPE
MANHOLE WALL
WASTEWATER GRAVITY MAIN
FINAL GRADE 1
36" MIN.
12"
PROPER BACKFILL MATERIAL
PIPE OD+12" MIN.
FINAL GRADE
BELL HOLE
BELL HOLE
ITEM
DESCRIPTION
GRAVITY SEWER MAIN PIPE
WASTEWATER GRAVITY MAIN CONSTRUCTION
NOT TO SCALE
NOTES
1. GRAVITY MAIN PIPE SHALL BE INSTALLED AT THE LINE AND GRADE
AS SHOWN ON THE APPROVED CONSTRUCTION DRAWINGS.
2. PIPE MATERIAL SHALL CONFORM TO THE APPROVED
CONSTRUCTION DRAWINGS.
WASTEWATER MAIN PIPE IDENTIFICATION
NOT TO SCALE
NOTES
1. PVC PIPE SHALL BE GREEN AND LABELED "WASTEWATER" OR "SEWER"
2. ALL OTHER PIPE MATERIAL SHALL BE IDENTIFIED WITH GREEN PAINT
OR AN ADHESIVE-BACKED TAPE.
3. THERE SHALL BE A MINIMUM OF THREE COLORED STRIPES OR TAPES
ALONG THE PIPE (LOCATED AT 10:00, 12:00, AND 2:00) EACH A MINIMUM
OF 2 INCHES WIDE.
4. THERE SHALL BE A GREEN, #10 AWG INSULATED COPPER WIRE
INSTALLED WITH PVC PIPES, NO EXCEPTIONS.
TAPED AT 10:00 TAPED AT 2:00
WASTEWATER SERVICE LATERAL
NOT TO SCALE
NOTES
1. PVC (SDR-35) WYES ARE ACCEPTABLE. PVC (SDR-35) T-WYE &
STANDARD TEES ARE UNACCEPTABLE
2. CLEAN-OUTS SHALL BE INSTALLED 3' ABOVE GRADE FOR SINGLE
FAMILY RESIDENCES.
3. WHERE CLEAN-OUT IS WITHIN PARKING LOT AND/OR PAVING OR
SIDEWALK, CLEAN-OUT MUST BE INSTALLED 3"-4" BELOW FINAL
GRADES WITH TRAFFIC BEARING COVER AT FINAL GRADE.
4. WHERE CLEAN-OUT IS WITHIN SIDEWALK, IT MUST BE INSTALLED FLUSH
WITH SURFACE OF SIDEWALK WITH A TRAFFIC LOAD BEARING COVER.
5. PLUMBER SHALL NOT CONNECT TO CLEANOUT STANDPIPE.
FINAL GRADE
PUE OR R/W
(PER PLAN)
45° MAX
35° MIN
45° BEND
WASTEWATER SERVICE LATERAL
CONNECTION BY PLUMBER
NOT TO SCALE
NOTES
1. OPEN TRENCH INSPECTION REQUIRED BY THE
CITY BUILDING INSPECTIONS DEPARTMENT
2. PLUMBER SHALL NOT CONNECT TO STANDPIPE.
PUE OR R/W
(PER PLAN)
WASTEWATER MANHOLE PIPE
CONNECTION CONSTRUCTION
NOT TO SCALE
NOTES
1. PREFABRICATED BOOT SHALL BE INSTALLED BY THE
MANUFACTURER OF THE MANHOLE IN ACCORDANCE WITH THE
PLANS DESIGNATED FOR CONSTRUCTION.
2. INSERT/INSTALL PIPE 3"+/- BEYOND INTERIOR WALL OF SANITARY
SEWER MANHOLE.
3. GROUT AREA INSIDE OF THE BOOT, FLUSH WITH INSIDE OF MANHOLE.
CONNECTIONS TO EXISTING SANITARY SEWER MANHOLES
1. CORE BORE THE EXISTING SANITARY SEWER MANHOLE. ALL SEWER
LATERALS AND SEWER MAINS ENTERING THE WALL OF THE EXISTING
SANITARY SEWER MANHOLE SHALL BE INSTALLED WITH AN ASTM
C-923 COMPLIANT MANHOLE BOOT, DESIGNED FOR SDR-26 PVC PIPE,
KOR-N-SEAL, A-LOK G3, OR APPROVED EQUAL. FILL ANNULAR SPACE
WITH NON-SHRINK GROUT OR HYDRAULIC CEMENT.
MIN 20"
INVERT PATH
RADIUS - TYP
SEWER MANHOLE INVERT CONSTRUCTION
NOT TO SCALE
NOTES
1. INVERTS SHALL BE CONSTRUCTED AT 0.10'
DROP ACROSS THE INSIDE OF MAHOLE
2. INVERTS SHALL BE BRICK WITH GROUT FILLER
GROUT - TYP
DEFLECTION
AS REQ'D
TYPICAL INVERT SECTION
SUMMARY OF CONTRACTOR RESPONSIBILITIES
CALL THE UTILITIES AND PUBLIC WORKS DEPARTMENT AT LEAST 48 HOURS IN ADVANCE TO NOTIFY THEM WHEN WORK WILL BEGIN AT THE SITE. THE CONTRACTOR SHALL SCHEDULE A PRE-CONSTRUCTION MEETING ON-SITE WITH THE UTILITIES AND PUBLIC WORKS DEPARTMENT INSPECTOR.
CONTRACTOR SHALL COORDINATE WITH THE INSPECTOR TO PERFORM WORK IN PROGRESS INSPECTIONS AT VARIOUS TIMES DURING CONSTRUCTION, INCLUDING, BUT NOT LIMITED TO, THE FOLLOWING ITEMS:
1. INSPECTION OF CONNECTIONS TO EXISTING CITY INFRASTRUCTURE AND BACKFILL ON MAIN LINE.
2. VISUAL INSPECTION OF ALL MECHANICAL JOINT RESTRAINTS AND THRUST BLOCKS BEFORE BACKFILLING.
3. CONTRACTOR SHALL COORDINATE WITH THE INSPECTOR PRIOR TO STERILIZATION AND PRESSURE TESTING.
4. COORDINATE WITH INSPECTOR TO TAKE TWO WATER SAMPLES FOR BACTERIOLOGICAL TESTING ON TWO CONSECUTIVE DAYS.
5. COORDINATE WITH INSPECTOR TO ARRANGE A DATE AND TIME FOR A WALKTHROUGH WITH THE UTILITIES AND PUBLIC WORKS DEPARTMENT (NOTE:
BEFORE WALKTHROUGH, ALL MAINS MUST BE FLUSHED, HYDRANT PLUMBING AND VALVE BOXES BROUGHT TO GRADE, AND SERVICES SHALL BE VERTICAL WITH CAPS OFF). A WRITTEN REPORT OF DISCREPANCIES (I.E. PUNCH LIST), IF ANY, SHALL BE PREPARED BY THE UTILITIES AND PUBLIC
WORKS DEPARTMENT AND GIVEN TO THE INSPECTOR AND THE CONTRACTOR.
6. CONTRACTOR SHALL NOTIFY INSPECTOR WHEN THE DISCREPANCIES (I.E. PUNCH LIST) ARE REPAIRED SO THAT THE INSPECTOR MAY COORDINATE
WITH THE UTILITIES AND PUBLIC WORKS DEPARTMENT FOR RE-INSPECTION.
7. WHEN THE SYSTEM HAS PASSED INSPECTION, CONTRACTOR SHALL FURNISH RECORD DRAWINGS. INSPECTOR SHALL THEN CLOSE-OUT JOB, AND A COMPLETION LETTER SHALL BE SENT BY THE UTILITIES AND PUBLIC WORKS DEPARTMENT TO THE CONTRACTOR AND THE ENGINEER OF RECORD.
8. ADDITIONAL CONTRACT CLOSE-OUT PROCEDURES MAY BE REQUIRED.
WASTEWATER CONSTRUCTION
STANDARDS
SCOPE
1. THE PURPOSE OF AND INTENT OF THESE STANDARDS AND THE ACCOMPANYING CONSTRUCTION DETAILS IS TO PROVIDE CONSTRUCTION SERVICES
FOR THE INSTALLATION OR MODIFICATION OF A WASTEWATER SYSTEM.
2. ENGINEERS, DEVELOPERS, CONTRACTORS, INSPECTORS, AND OTHERS CONCERNED WITH WASTEWATER CONSTRUCTION SHALL PERFORM ALL WORK
IN ACCORDANCE WITH THESE REQUIREMENTS. ANY MODIFICATIONS TO THESE STANDARDS SHALL REQUIRE THE WASTEWATER ENGINEER'S
APPROVAL.
INSPECTION AND DISPOSITION OF MATERIALS
1. MATERIAL DELIVERED TO THE JOB SITE SHALL BE INSPECTED. MATERIALS FOUND DURING INSPECTION OR DURING THE PROGRESS OF THE WORK TO
HAVE CRACKS, CHIPS, FLAWS, SURFACE ABRASIONS, CRACKED LININGS, OR OTHER DEFECTS SHALL BE REJECTED AND REMOVED FROM THE JOB SITE WITHOUT DELAY. ALL MATERIALS DELIVERED TO THE JOB SITE SHALL BE IN ACCORDANCE WITH THE APPROVED WATER/WASTEWATER MATERIALS
SCHEDULE.
2. PIPE DELIVERED TO THE JOB SITE SHALL BE UNLOADED ADJACENT TO OR NEAR THE PLACE WHERE IT IS TO BE INSTALLED. MATERIALS SHALL BE LOADED AND UNLOADED BY A LOADER, LIFTING HOIST, OR SKIDDING SO AS TO AVOID SHOCK AND PREVENT DAMAGE. MATERIALS UNLOADED BY
SKIDWAYS SHALL NOT BE SKIPPED OR ROLLED AGAINST MATERIALS ALREADY ON THE GROUND.
PROTECTION OF PROPERTY AND OBSTRUCTIONS
1. TEMPORARY SUPPORTS AND/OR ADEQUATE PROTECTION AND MAINTENANCE SHALL BE INSTALLED ON ALL UNDERGROUND AND SURFACE
STRUCTURES ENCOUNTERED IN THE PROGRESS OF THE WORK. STRUCTURES THAT HAVE BEEN DISTURBED SHALL BE RESTORED UPON COMPLETION
OF THE WORK.
2. UNDERGROUND UTILITIES SHALL BE NOTIFIED AND UTILITY LOCATES PERFORMED (CALL 811) PRIOR TO BEGINNING CONSTRUCTION. ANY KNOWN OBSTRUCTIONS SHALL BE SHOWN ON THE DRAWINGS. THE UTMOST CAUTION SHALL BE TAKEN IN ALL OPERATIONS TO AVOID DAMAGE TO EXISTING OBSTRUCTIONS (FOR EXAMPLE, PIPES, CABLES, CONDUIT, UTILITY POLES, STRUCTURES, ETC.) WHETHER OR NOT SHOWN ON THE DRAWINGS.
3. EXISTING UTILITIES SHALL BE KEPT IN OPERATION BY TEMPORARY LINES, TEMPORARY PUMPS, OR OTHER MEANS PROVIDED FOR CONTINUOUS OPERATION OF UTILITIES. ALL OF THIS WORK SHALL BE INSTALLED, MAINTAINED, OPERATED, AND REMOVED UPON COMPLETION OF THE JOB. IN CASES WHERE A BYPASS IS REQUIRED. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE EQUIPMENT, TWO (2) PUMPS WITH AUTO SWITCHOVER SYSTEM AND CALL BOX WITH A MAXIMUM OF THIRTY MINUTE RESPONSE, PIPING, TANKERS, AND OTHER NECESSARY APPURTENANCES IN ORDER TO MAINTAIN CONTINUOUS AND RELIABLE WASTEWATER SERVICE IN ALL WASTEWATER LINES AS REQUIRED FOR CONSTRUCTION. ALL MATERIALS, EQUIPMENT, AND LABOR NECESSARY TO COMPLETE THE REPAIR, REPLACEMENT OR REHABILITATION SHALL BE ON THE JOB SITE PRIOR TO ISOLATING THE GRAVITY MAIN SEGMENT, MANHOLE, OR PUMP STATION. THE CONTRACTOR SHALL DEMONSTRATE THAT THE PUMPING SYSTEM IS IN GOOD WORKING ORDER AND IS SUFFICIENTLY SIZED TO SUCCESSFULLY HANDLE FLOWS BY PERFORMING A TEST RUN FOR A PERIOD OF 24 HOURS PRIOR TO
BEGINNING THE WORK.
TRENCH PREPARATION
1. THE TRENCH SHALL BE OPENED SO THAT THE PIPE CAN BE INSTALLED TO THE ALIGNMENT AND DEPTH REQUIRED. THE TRENCH SHALL BE EXCAVATED
ONLY SO FAR IN ADVANCE OF PIPE INSTALLATION AS TO INSURE PROPER INSTALLATION IN ACCORDANCE WITH THE CONSTRUCTION DETAILS AND
THESE PLANS.
2. THE TRENCH SHALL BE EXCAVATED TO THE DEPTH REQUIRED SO AS TO PROVIDE A UNIFORM AND CONTINUOUS BEARING SUPPORT FOR THE PIPE ON UNDISTURBED GROUND. BELL HOLES SHALL BE PROVIDED AT EACH JOINT TO PERMIT JOINTING TO BE MADE PROPERLY AND INSPECTED.
3. DURING EXCAVATION, IF ASHES, CINDERS, REFUSE, OR OTHER ORGANIC MATERIALS CONSIDERED UNSTABLE ARE UNCOVERED AT THE BOTTOM OF THE TRENCH OR AT SUBGRADE, IT SHALL BE REMOVED AND BACKFILLED WITH APPROVED MATERIAL.
4. APPROVED BACKFILL MATERIAL SHALL BE TAMPED IN LAYERS SO AS TO PROVIDE A UNIFORM AND CONTINUOUS BEARING CHARACTERISTIC OF THAT
AREA'S SOIL CONDITION.
5. EXCAVATED MATERIAL SHALL BE PILED IN SUCH A MANNER THAT IT WILL NOT ENDANGER THE WORK, OR OBSTRUCT NATURAL WATER COURSES, SIDEWALKS, OR DRIVEWAYS. FIRE HYDRANTS UNDER PRESSURE, VALVE PIT COVERS, VALVE BOXES, FIRE AND POLICE CALL BOXES, OR OTHER UTILITY CONTROLS SHALL BE LEFT UNOBSTRUCTED AND ACCESSIBLE AT ALL TIMES. GUTTERS SHALL BE KEPT CLEAR OR OTHER SATISFACTORY PROVISIONS MADE FOR STREET DRAINAGE. ALL MATERIALS WHICH ARE SUITABLE FOR REUSE IN RESTORING THE SURFACE SHALL BE KEPT SEPARATE FROM ANY
UNACCEPTABLE EXCAVATED MATERIAL.
6. OPEN CUT TRENCHES SHALL BE SHEETED AND BRACED AS REQUIRED BY ANY GOVERNING STATE LAW, MUNICIPAL ORDINANCES, OSHA STANDARDS.
7. SHEETING AND BRACING WHICH HAVE BEEN ORDERED LEFT IN PLACE MUST BE REMOVED TO A DEPTH OF FOUR (4) FEET BELOW THE ESTABLISHED
GRADE OR THE EXISTING SURFACE, WHICHEVER IS LOWER. TRENCH BRACING, EXCEPT THAT WHICH MUST BE LEFT IN PLACE, MAY BE REMOVED AFTER THE BACKFILLING HAS BEEN COMPLETED OR HAS BEEN BROUGHT UP TO SUCH AN ELEVATION AS TO PERMIT ITS SAFE REMOVAL. THE USE OF A TRENCH BOX MAY BE ALLOWED UNLESS SHEETING AND BRACING IS REQUIRED BY THE ENGINEER.
8. WATER SHALL NOT BE ALLOWED IN THE TRENCH AT ANY TIME. AN ADEQUATE SUPPLY OF WELL POINTS, HEADERS, AND PUMPS, ALL IN FIRST CLASS OPERATING CONDITION, MAY BE USED TO REMOVE THE WATER. THE USE OF GRAVEL AND PUMPS SHALL ALSO BE AN ACCEPTABLE MEANS OF REMOVING THE WATER. THE TRENCH SHALL BE EXCAVATED NO MORE THAN THE AVAILABLE PUMPING FACILITIES ARE CAPABLE OF HANDLING. THIS DISCHARGE FROM PUMPS SHALL BE ROUTED TO NATURAL DRAINAGE CHANNELS OR EMPTIED INTO DRAINS OR STORM SEWERS, OR AS REQUIRED BY
EPA, FDEP, THE WATER MANAGEMENT DISTRICT, OR OTHER AGENCIES.
HANDLING AND CUTTING PIPE
1. EVERY CARE SHALL BE TAKEN IN HANDLING AND LAYING PIPE AND FITTINGS TO AVOID DAMAGING THE PIPE, SCRATCHING OR MARRING MACHINED
SURFACES, AND ABRASION OF THE PIPE COATING.
2. LINED PIPE OR FITTINGS MUST BE HANDLED ONLY FROM THE OUTSIDE OF THE PIPE AND FITTINGS. NO FORKS, CHAINS, STRAPS, HOOKS, ETC. SHALL BE
PLACED INSIDE THE PIPE AND FITTINGS FOR LIFTING, POSITIONING, OR LAYING. IF DAMAGED, THE MATERIAL SHALL BE REPAIRED IN ACCORDANCE WITH THE LINER MANUFACTURER’S RECOMMENDATIONS AND TO THE CITY'S UTILITY AND PUBLIC WORKS DEPARTMENT'S SATISFACTION.
3. EXCEPT AS OTHERWISE APPROVED, ALL CUTTING SHALL BE DONE WITH A POWER DRIVEN CUT OFF SAW. ALL CUT ENDS SHALL BE EXAMINED FOR POSSIBLE CRACKS CAUSED BY CUTTING. THE COATING ON CUT ENDS MUST BE REPAIRED PER MANUFACTURER’S SPECIFICATIONS.
GRAVITY COLLECTION SYSTEM
1. THE CITY UTILITY AND PUBLIC WORKS DEPARTMENT SHALL BE NOTIFIED FORTY-EIGHT (48) HOURS PRIOR TO BEGINNING CONSTRUCTION. INSPECTORS
MAY REQUIRE A VISUAL INSPECTION ON ALL PIPING SYSTEMS INSTALLED WITHOUT NOTIFICATION OF THE CITY DEPARTMENT.
2. GRAVITY COLLECTION MAINS SHALL BE CONSTRUCTED OF THE TYPE AND SIZE INDICATED ON THE DRAWINGS. ALL FITTINGS SHALL BE MECHANICAL
JOINT. SOLVENT WELD JOINTS ARE NOT ACCEPTABLE. DUCTILE IRON PIPE SHALL BE INSTALLED ONLY IF INDICATED ON THE APPROVED PLANS.
3. ALL MATERIALS INSTALLED SHALL BE IN ACCORDANCE WITH THE MATERIALS INDICATED IN THE MATERIALS SCHEDULE. MATERIAL THAT IS NOT
INCLUDED IN THE SCHEDULE SHALL NOT BE INSTALLED. PRIOR TO INSTALLATION SPECIALTY ITEMS SHALL BE APPROVED BY THE CITY UTILITY AND
PUBLIC WORKS DEPARTMENT.
4. GRAVITY SEWER MAINS SHALL BE INSTALLED AS SPECIFIED ON THE DRAWINGS AND IN ACCORDANCE WITH THE CONSTRUCTION DETAILS AND THESE
PLANS.
5. THE BOTTOM OF THE TRENCH SHALL NOT BE EXCAVATED BELOW THE SPECIFIED GRADE. IF UNDERCUTTING OCCURS, THE BOTTOM OF THE TRENCH SHALL BE BROUGHT UP TO THE ORIGINAL GRADE WITH APPROVED MATERIAL, THOROUGHLY COMPACTED, AS DIRECTED BY THE CITY DEPARTMENT.
6. BEFORE PLACING THE PIPE INTO THE TRENCH, THE OUTSIDE OF THE SPIGOT AND THE INSIDE OF THE BELL SHALL BE WIPED CLEAN AND DRY, FREE FROM OIL AND GREASE. EVERY PRECAUTION SHALL BE TAKEN TO PREVENT FOREIGN MATERIAL FROM ENTERING THE PIPE. DURING LAYING OPERATION, NO DEBRIS, TOOLS, CLOTHING OR OTHER MATERIAL SHALL BE PLACED INTO THE PIPE.
7. GRAVITY SEWER MAINS SHALL BE INSTALLED WITH A PIPE LASER. LATERALS MAY BE INSTALLED WITH MASON’S LINES AND BATTER BOARDS. THE BATTER BOARD SHALL BE ERECTED TO A PREDETERMINED ALIGNMENT AND GRADE. TWO MASON’S LINES WITH A MINIMUM OF 75 FEET IN LENGTH SHALL BE TIGHTLY STRETCHED AND SUPPORTED WITH BATTER BOARDS AND AT INTERVALS NOT EXCEEDING 25 FEET.
8. AFTER PLACING THE LENGTH OF PIPE IN THE TRENCH, THE SPIGOT END SHALL BE CENTERED IN THE BELL, FORCED HOME, AND BROUGHT TO THE CORRECT ALIGNMENT AND GRADE. THE PIPE SHALL BE COVERED WITH AN APPROVED BACKFILL MATERIAL.
9. WHEN PIPE LAYING IS NOT IN PROGRESS, THE OPEN ENDS OF PIPE SHALL BE CLOSED BY A WATERTIGHT PLUG OR OTHER APPROVED MEANS. THIS PROVISION SHALL APPLY DURING THE NOON HOUR AS WELL AS OVERNIGHT. IF WATER IS IN THE TRENCH, THE SEAL SHALL REMAIN IN PLACE UNTIL
THE TRENCH IS PUMPED COMPLETELY DRY.
10. BACKFILLING MATERIAL SHALL BE FREE FROM CINDERS, ASHES, REFUSE, VEGETABLE OR ORGANIC MATERIAL, BOULDERS, ROCKS, STONES, OR OTHER MATERIAL WHICH IS CONSIDERED UNSUITABLE. WHEN BACKFILL MATERIAL IS NOT SPECIFIED ON THE DRAWINGS, BACKFILLING WITH THE EXCAVATED MATERIAL MAY BE ACCEPTABLE PROVIDED THAT SUCH MATERIAL IS SUITABLE FOR BACKFILLING.
11. PLACEMENT OF THE EMBEDMENT MATERIALS IS THE MOST IMPORTANT PART OF PIPE LAYING. THE FIVE GROUPS OF EMBEDMENT MATERIALS PLUS THE SOIL TYPES DEFINED ACCORDING TO THE UNITED SOIL CLASSIFICATION SYSTEM (USCS) IN ASTM D-2487, STANDARD METHOD OF CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES. BEDDING MAY BE REQUIRED IN POOR SOIL CONDITIONS. CLASS IV AND CLASS V MATERIAL SHALL NOT BE
USED FOR BEDDING, HAUNCHING, OR INITIAL BACKFILL.
12. WHEN ROCK AND PUMP METHOD IS USED INSTEAD OF WELL POINTING, CLASS I MATERIAL SHALL BE INSTALLED FOR BEDDING. SUFFICIENT AMOUNTS OF CLASS II OR CLASS III MATERIAL SHALL BE ADDED TO FILL THE VOIDS CREATED BY USING ROCK. PUMPS SHALL BE MOVED IN INTERVALS TO ENSURE THE MIGRATION OF CLASS II OR CLASS III MATERIAL. DISCHARGE FROM THE PUMPS SHALL NOT BE EMPTIED INTO THE PIPE WHICH IS BEING INSTALLED.
13. AFTER PIPE HAS BEEN PLACED INTO THE TRENCH ACCORDING TO THE ALIGNMENT AND GRADE INDICATED ON THE DRAWING, HAUNCHING MATERIAL SHALL BE PLACED TO THE SPRINGLINE OF THE PIPE AND HAND TAMPED. CARE SHALL BE TAKEN TO ENSURE SUFFICIENT AMOUNTS OF MATERIAL HAVE BEEN WORKED UNDER THE HAUNCHES OF THE PIPE TO PROVIDE ADEQUATE SIDE SUPPORT. PRECAUTIONS SHALL BE TAKEN TO PREVENT MOVEMENT
OF THE PIPE.
14. PLACE INITIAL BACKFILL WITHIN 24”-30" ABOVE THE TOP OF THE PIPE AND HAND TAMP IN 6”-12” INCREMENTS. THE MINIMUM COVER ON ALL GRAVITY SEWER MAINS SHALL BE THIRTY-SIX (36) INCHES. AT LEAST FORTY-EIGHT (48) INCHES OF COVER SHALL BE PROVIDED FOR PVC MAINS BEFORE USING
A MOBILE TRENCH COMPACTOR OF THE HYDRO HAMMER TYPE.
15. FINAL BACKFILL MAY BE MACHINE PLACED. MATERIALS THAT COMPLETE FINAL BACKFILL OPERATION NEED NOT BE AS CAREFULLY SELECTED AS THE INITIAL BACKFILL. ALL WORK UNDER PAVEMENT SHALL BE CONDUCTED IN ACCORDANCE WITH ANY STATE, COUNTY OR LOCAL REQUIREMENTS.
COMMUNICATION WITH THEM IS THE CONTRACTOR’S RESPONSIBILITY.
16. THE LOCATION OF ALL LATERALS SHALL BE SHOWN ON THE DRAWINGS. ALL MATERIALS INSTALLED SHALL BE IN ACCORDANCE WITH THE MATERIALS
INDICATED IN THE MATERIALS SCHEDULE.
17. WYES OF PROPER SIZE SHALL BE INSTALLED IN THE WASTEWATER COLLECTION SYSTEM AT THE LOCATIONS SHOWN ON THE DRAWINGS. THE WYES, UNLESS OTHERWISE SPECIFIED, SHALL BE INCLINED UPWARD AT AN ANGLE OF NOT MORE THAN 45 DEGREES FROM THE HORIZONTAL. EACH WYE SHALL BE FITTED WITH A SHORT RADIUS CURVE, CONNECTED WITH A LATERAL AND EXTENDED TO THE PROPERTY LINE. TEE-WYES ARE NOT
ACCEPTABLE. SOLVENT-WELD SADDLES ARE NOT ACCEPTABLE.
18. EACH LATERAL SHALL CONTAIN A CLEAN-OUT. THE CLEAN-OUTS SHALL BE INSTALLED AT THE LOCATION SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH THE THE CONSTRUCTION DETAILS AND THESE PLANS. ALL CLEAN-OUTS SHALL BE INSTALLED INITIALLY A MINIMUM OF FOUR FEET ABOVE FINAL GRADE DURING NEW CONSTRUCTION. PRIOR TO FINAL ACCEPTANCE AND AFTER COMPLETION OF THE SMOKE TEST OF THE WASTEWATER COLLECTION SYSTEM, ALL CLEAN OUTS SHALL BE LOWERED TO FINAL GRADE AND CAPPED, AS SPECIFIED IN THE CONSTRUCTION
DETAILS.
19. NOTE: BEFORE BACKFILLING IS COMPLETE, CONTRACTOR SHALL COORDINATE WITH THE CITY INSPECTOR FOR A VISUAL INSPECTION TO CONFIRM PROPER GRADE PER THE CONSTRUCTION DETAILS AND DRAWINGS ON MAINLINE, WYES, AND LATERALS AND FOR PROPER BACKFILL (SEE
CONTRACTOR RESPONSIBILITIES).
MANHOLES
1. MANHOLES SHALL BE CONSTRUCTED AT THE LOCATION SHOWN ON THE DRAWINGS. THE MANHOLES MAY BE EITHER CONSTRUCTED OF BRICKS AND
MORTAR OR PRECAST CONCRETE SECTIONS. ALL PRECAST MANHOLE SECTIONS SHALL CONFORM TO A.S.T.M. SPECIFICATION C 478-73 OR LATEST
REVISION. MANHOLE SECTIONS SHALL BE JOINED AND SEALED WITH "RAM-NEK" SEALER.
2. DURING INSTALLATION OF THE MANHOLE THE PIT SHALL REMAIN DRY. ALL MATERIALS INSTALLED SHALL BE IN ACCORDANCE WITH THE MATERIALS
INDICATED IN THE MATERIALS SCHEDULE.
3. PRECAST BASE SECTIONS WITHOUT A BOTTOM SHALL BE INSTALLED INTO A MINIMUM OF 2,500 PSI @ 28 DAYS READY MIX CONCRETE. HAND MIXING OF CONCRETE AT THE JOB SITE SHALL NOT BE PERMITTED. FORM BOARDS SHALL BE INSTALLED ON ALL CONCRETE SLAB CONSTRUCTION. THE CONCRETE SLAB SHALL BE A SQUARE TWO FEET WIDER THAN THE OUTSIDE DIAMETER OF THE BASE SECTION WITH A MINIMUM THICKNESS OF TWELVE (12) INCHES. THE CONCRETE SLAB SHALL BE INSTALLED TO THE PROPER GRADE AND AGAINST UNDISTURBED EARTH. UNDERCUTTING AND BACKFILLING TO ESTABLISH PROPER GRADE SHALL NOT BE ACCEPTABLE. SUFFICIENT TIME SHALL ELAPSE AFTER THE CONCRETE HAS BEEN POURED SO THAT THE BASE SECTION MAY BE CENTERED, EMBEDDED INTO THE SLAB AND STAND PLUMB. ALL CONNECTIONS INTO THE BASE SECTION SHALL
FORM A WATERTIGHT SEAL.
4. PRECAST BASE SECTIONS WITH A BOTTOM SHALL BE INSTALLED ON UNDISTURBED EARTH. BEDDING IS REQUIRED WHEN THE SOIL CONDITIONS ARE WET OR WHEN THE SOIL IS CLASS IV OR CLASS V MATERIAL. THE BEDDING SHALL BE 4"-6” (100-150 MM) CLASS I, CLASS II, OR CLASS III MATERIAL. THE BEDDING OF CLASS II AND CLASS III MATERIAL SHALL BE HAND TAMPED, UNIFORM AND NO FINER THAN THE FOUNDATION. WHEN UTILIZING CLASS I MATERIAL, SUFFICIENT AMOUNTS OF CLASS II OR CLASS III MATERIAL SHALL BE ADDED TO FILL THE VOIDS CREATED BY THE USE OF CLASS I MATERIAL.
ALL CONNECTIONS INTO THE MANHOLE BOTTOM SHALL FORM A WATERTIGHT SEAL.
5. MANHOLE BOTTOMS SHALL CONTAIN INVERTS UNIFORMLY FORMED WITH TYPE II LEAN CEMENT HAND MIX WITH BRICK AND SLOPED TO THE CENTERLINE OF THE PIPE. WHERE MORE THAN ONE PIPE ENTERS A MANHOLE, VARIOUS CHANNELS SHALL BE FORMED TO PROVIDE AN INVERT FOR
EACH PIPE.
6. PRECAST TOP SECTIONS SHALL BE ECCENTRIC CONES. THE TOP SECTION SHALL BE INSTALLED SO THAT THE CONE IS EITHER A MINIMUM OF SIX (6) INCHES FROM THE FINAL GRADE OR A MAXIMUM OF TWENTY-FOUR (24) INCHES FROM THE FINAL GRADE.
7. BRICKS AND MORTAR SHALL BE USED TO BRING THE MANHOLE RING AND COVER UP TO THE FINAL GRADE. THE RING AND COVER SHALL BE TWENTY-FOUR (24) INCHES IN DIAMETER, DESIGNED FOR TRAFFIC LOADING AND CONFORMING TO D.O.T. (FLORIDA DEPARTMENT OF
TRANSPORTATION) SPECIFICATIONS.
8. NEW INSTALLATIONS REQUIRING DROP CONSTRUCTION SHALL BE INSTALLED OUTSIDE OF THE MANHOLE. SUBJECT TO APPROVAL OF THE CITY UTILITIES AND PUBLIC WORKS DEPARTMENT INSIDE DROPS MAY BE INSTALLED ON EXISTING MANHOLES. ALL DUCTILE IRON FITTINGS SHALL BE MECHANICAL JOINT. PLAIN END FITTINGS EXTENDING INTO MANHOLE SECTION ARE ACCEPTABLE.
9. ALL CONNECTIONS INTO THE MANHOLE SECTION SHALL FORM A WATERTIGHT SEAL. THE BASE OF THE DROP AND ONE JOINT OF PIPE SHALL BE BACKFILLED AND HAND TAMPED IN LAYERS AND WITHIN ONE FOOT ABOVE THE TOP OF THE PIPE. THE MAXIMUM HEIGHT BETWEEN THE BASE OF THE
DROP AND THE TOP OF THE INVERT SHALL BE TWENTY-FOUR (24) INCHES.
10. MANHOLES FOR AIR RELEASE VALVES SHALL BE CONSTRUCTED AT THE LOCATION SHOWN ON THE DRAWINGS. ALL PRECAST BASE SECTIONS SHALL HAVE AN INSIDE DIAMETER OF FORTY-EIGHT (48) INCHES. FLAT TOP SLABS MAY BE INSTALLED WITH A MANHOLE RING AND COVER CAST INTO THE
SLAB. THE MINIMUM THICKNESS OF THE FLAT TOP SHALL BE SIX (6) INCHES.
11. A 12 FOOT WIDE STABILIZED ACCESS ROAD, STABILIZED TO A MINIMUM LBR 30, SHALL BE PROVIDED TO ALL MANHOLES LOCATED WITHIN EASEMENTS.
THE ACCESS ROAD SHALL BE DESIGNED TO PROVIDE FOR ADEQUATE DRAINAGE AND TO PREVENT EROSION FROM STORMWATER RUNOFF. MAXIMUM GRADE SHALL BE 5% WHERE FEASIBLE, BUT IN NO CASE GREATER THAN 10%. A TEE-SHAPED VEHICLE TURN AROUND AREA SHALL BE PROVIDED AT THE END OF ALL DEAD END ACCESS ROADS TO PROVIDE THE ABILITY TO MANEUVER A LARGE UTILITY TRUCK IN THE ROAD. EACH LEG OF THE TEE SHALL BE MINIMUM 14’ WIDE AND 25’ LONG MEASURED FROM THE NEAR EDGE OF THE ADJACENT PERPENDICULAR ROAD LEG.
PAVING, CURB, GUTTER, AND WALKWAY WORK
1. WHEN OPEN DITCH CONSTRUCTION OF PIPE BENEATH PAVING IS PERMITTED, THE PAVEMENT, CURB AND GUTTER, DRIVEWAY, AND WALKWAY SHALL
BE REMOVED TO NEAT LINES OF A SUFFICIENT WIDTH TO ALLOW PROPER INSTALLATION OF THE PIPE WORK.
2. SIGNAL LIGHTS, WARNING SIGNS, AND BARRICADES SHALL BE INSTALLED AND MAINTAINED AS REQUIRED FOR ADEQUATE SAFETY.
3. NO PAVEMENT BASE SHALL BE REPLACED BEFORE THE DITCH BACKFILL HAS BEEN INSPECTED AND APPROVED. DENSITY AND COMPACTION TESTS
MAY BE REQUIRED BY THE AUTHORITY HAVING JURISDICTION OVER THE STREET, ROAD, OR HIGHWAY INVOLVED.
4. PAVEMENT SHALL BE REPLACED IN ACCORDANCE WITH THE "FLORIDA DEPARTMENT OF TRANSPORTATION, STANDARD SPECIFICATIONS FOR ROAD
AND BRIDGE CONSTRUCTION", OR LATEST EDITION OR AS REQUIRED BY THE CITY UTILITY AND PUBLIC WORKS DEPARTMENT.
5. CURB AND GUTTER SHALL BE REPLACED WITH A NEW CONCRETE UNIT POURED-IN-PLACE AND HAVING THE SAME CROSS SECTION AS THE ORIGINAL
CURB REMOVED. THE CONCRETE SHALL BE THOROUGHLY CURED. BACKFILL UNDER CONCRETE WORK SHALL BE THOROUGHLY COMPACTED AND THE
SUB-GRADE APPROVED BEFORE ANY CONCRETE MAY BE POURED.
6. CONCRETE WALKWAYS AND DRIVEWAYS SHALL BE REPLACED WITH CONCRETE OF THE SAME CROSS SECTION AS THE ORIGINAL WALK OR DRIVEWAY.
THE CONCRETE SHALL BE THOROUGHLY CURED. BACKFILL UNDER CONCRETE WORK SHALL BE THOROUGHLY COMPACTED AND THE SUB-GRADE
APPROVED BEFORE ANY CONCRETE MAY BE POURED.
FINAL ACCEPTANCE
1. UPON COMPLETION OF THE WORK, ALL WASTE MATERIALS OR OTHER DEBRIS CAUSED BY OR ACCUMULATED AS A RESULT OF THE JOB SHALL BE
REMOVED FROM THE JOB SITE. ANY DEPRESSIONS RESULTING FROM SETTLEMENT OF BACKFILLED TRENCHES SHALL BE REFILLED. ANY SEEDING AND MULCHING OR SPRIGGING AND MULCHING REQUIRED OF THE GROUND SURFACE SHALL BE CONDUCTED IN ACCORDANCE WITH THE DRAWINGS OR AS REQUIRED BY FEDERAL GOVERNMENT, STATE, COUNTY, OR THE CITY UTILITIES AND PUBLIC WORKS DEPARTMENT.
2. UPON COMPLETION OF THE GRAVITY COLLECTION SYSTEM, THE LINES SHALL BE FLUSHED AND JET VACUUMED CLEANED. CONTRACTOR TO COMPLETE A SMOKE TEST AND INSPECT THE SYSTEM WITH A TV CAMERA FOR ANY DEFLECTIONS, CLOGGED CLEAN-OUTS, OR BREAKS IN COORDINATION WITH THE CITY UTILITIES AND PUBLIC WORKS DEPARTMENT. ANY CLOGGED CLEANOUTS OR BREAKS SHALL BE REPAIRED ACCORDINGLY. ANY SECTIONS OF PVC PIPE WITH MORE THAN 5% DEFLECTION SHALL NOT BE ACCEPTED.
3. THE FOLLOWING SHALL BE COMPLETED BEFORE THE SYSTEM IS ACCEPTABLE:
3.1. SMOKE TEST AND TV INSPECTION.
3.2. CLEAN-OUTS ADJUSTED.
3.3. MANHOLE TO FINISHED GRADE.
3.4. INVERTS INSTALLED.
3.5. ROAD PRIMED AND READY FOR PAVING.
4. CONTRACTOR SHALL PROVIDE A RECORDING AND WRITTEN REPORT OF THE TV INSPECTION AND LIST ANY DISCREPANCIES FOUND, REPAIRED, AND
RE-INSPECTED.
5. WHEN THE SYSTEM HAS PASSED INSPECTION, CONTRACTOR SHALL FURNISH RECORD DRAWINGS AND CERTIFIED COSTS. INSPECTOR SHALL THEN CLOSE-OUT JOB, AND A COMPLETION LETTER SHALL BE SENT TO THE DEVELOPER, ENGINEER OF RECORD, AND CONTRACTOR. THERE SHALL BE A ONE
(1) YEAR WARRANTY ON THE WASTEWATER SYSTEM. AT THE END OF ONE (1) YEAR THE SYSTEM SHALL BE INSPECTED WITH A TV CAMERA AND ANY DEFECTS DISCOVERED SHALL BE REPAIRED ACCORDINGLY BY THE CONTRACTOR THAT INSTALLED THE WASTEWATER SYSTEM.
6. THE POINT OF CONNECTION TO THE CITY SYSTEM MUST BE PLUGGED WITH A MECHANICAL PLUG UNTIL CONSTRUCTION IS COMPLETE, LINES FLUSHED, AND THE CITY INSPECTOR APPROVES REMOVAL.
7. SEE THE SUMMARY OF CONTRACTOR RESPONSIBILITIES
8. ALL DISTURBED AREAS ARE REQUIRED TO BE RESTORED TO EQUAL OR BETTER CONDITION.
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2024-05-21
STAMP
This item has been digitally signed and sealed by Christopher A. Gmuer, PE, on the date indicated.
Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
Feet 0 50 100
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2024-05-21 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TAMPA VAMC SANITARY RISER
REPLACEMENT
TAMPA, FL
673-21-154
Project Director
02-15-2024 05-24-2024
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CAG ABG
Fi le
: 2 2-
-C -1
S
IT
E.
D W
G
LA
ST
S
AV
ED
: 2
4-
-2
:1 8:
P
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
4-
-2
:1 8:
P
M
U
SE
R : C hr is
G
MASTER PLAN
C-100
C-101
E 131ST AVE
BR
U
C E
B D
O W
N S
BL
VD
RICHARD SILVER WAY
LIMITS OF
WORK
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2024-05-21
STAMPPPPPPPPP
This item has been digitally signed and sealed by Christopher A. Gmuer, PE, on the date indicated.
Printed copies of this document are not
STORM
STO
R
M
STO
R M
W W
W W
W W
W W
W W
W W
W W
W W
W W
WW
WW
W W
W W
WW
WW
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
M W
M W
M W
M W
M
O
O
O
O
O
O
O
O
W M
W M
W M
W M
W M
W M
W M
W M
WMWMWMWMWMWM
WMWMWMWMWMWMWMWMWM
WM WM WM WM WM
W M
WMWM
W M
W M
W M
W M
O2 O2 O2 O2 O2 O2 O2 O2
O2 O2 O2 O2 O2 O2 O2 O2
STORM
STORM
STORM
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E U
G E
UGE
GE
UGE
UGE
UGE
FU
EL
FU
EL
FUEL FUEL
FUELFUELFUELFUEL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FUEL FUEL FUEL FUEL FUEL
FUELFUELFUELFUELFUEL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
EL
FUEL
FU
EL
FU
EL
WM WM WM
W M
W M
W M
W M
W M
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGEU
G
E
UGEUGE
WW
EXISTING 8" SANITARY GRAVITY SEWER MAIN
TO BE REMOVED AND REPLACED FROM THE
BUILDING TO THE MANHOLE (SM#11) - SEE
BASEMENT PLANS FOR CONTINUATION - NO
CHANGE TO THE ELEVATIONS ARE PROPOSED
EXISTING MANHOLE (SM#11) TO BE REMOVED
STORM
STO
R
M
STO
R M
W W
W W
W W
W W
W W
W W
W W
W W
W W
WW
WW
W W
W W
WW
WW
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
STO
R M
STO
R
M
M W
M W
M W
M W
M
O
O
O
O
O
O
O
O
W M
W M
W M
W M
W M
W M
W M
W M
WMWMWMWMWMWM
WMWMWMWMWMWMWMWMWM
WM WM WM WM WM
W M
WMWM
W M
W M
W M
W M
O2 O2 O2 O2 O2 O2 O2 O2
O2 O2 O2 O2 O2 O2 O2 O2
STORM
STORM
STORM
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE
UGE
UGE
UGE
UGE
UGE
U G
E U
G E
U G
E U
G E
UGE
GE
UGE
UGE
UGE
FU
EL
FU
EL
FUEL FUEL
FUELFUELFUELFUEL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FUEL FUEL FUEL FUEL FUEL
FUELFUELFUELFUELFUEL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
FU
EL
EL
FUEL
FU
EL
FU
EL
WM WM WM
W M
W M
W M
W M
W M
UGE
UGE
UGE
UG
E
UGE
UGE
UGE
UGE
UGE
UGE
UGEU
G
E
UGEUGE
WW
8" PVC
NEW PRECAST
MANHOLE - SEE NOTES
& DETAILS ON C-010
SAWCUT & REPAIR EXIST CONCRETE
FOR SEWER INSTALLATION
NEW 8" SEWER TO USE EXISTING SLEEVE IN
FOUNDATION TO ENTER BUILDING - CONTRACTOR
TO FIELD VERIFY EXISTING SLEEVE IS IN GOOD
CONDITION AND REPLACE IF NECESSARY
Feet 0 10 20
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2024-05-21 gmuereng.com
(352) 281-4928
2603 NW 13th ST, Box 314
Gainesville, FL 32609
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
TAMPA VAMC SANITARY RISER
REPLACEMENT
TAMPA, FL
673-21-154
Project Director
02-15-2024 05-24-2024
Revisions: Date:
590 MEANS STREET NW
STE. 200
ATLANTA, GA 30318
CAG ABG
Fi le
: 2 2-
-C -1
S
IT
E.
D W
G
LA
ST
S
AV
ED
: 2
4-
-2
:1 8:
P
M
PL
O
T
SC
AL
E
: 1 :1
P
LO
TT
ED
: 2
4-
-2
:1 9:
P
M
U
SE
R : C hr is
G
SITE UTILITY PLAN
C-101
E
F
KEY PLAN
GRAPHIC SCALE
SITE UTILITY DEMOLITION PLAN
SCALE 1" = 10'
SITE UTILITY PROPOSED PLAN
SCALE 1" = 10'
PROJECT AREA
LIMITS OF WORK
LIMITS OF WORK
ENGINEER OF RECORD
CHRISTOPHER A. GMUER
FL PE # 71599
2024-05-21
STAMPPPPPPPPP
This item has been digitally signed and sealed by Christopher A. Gmuer, PE, on the date indicated.
Printed copies of this document are not
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT Office of Construction and
Facilities Management
Drawn
02/15/2024
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT Office of Construction and
Facilities Management
Drawn
GA‐011
GA‐012
GA‐011a
GA‐012aGA‐013aGA‐027n
GA‐027o
GA‐013
GA‐013a
GA‐009
GA‐011b
GA‐009a
GA‐014
GA‐004a
GA‐007
C0‐05c‐1
GA‐027l
GA‐027m
GA‐027h
GA‐027h
GA‐027
GA‐027t GA‐027w
S0‐09‐1
GE‐002
GE‐001
GE‐003
GE‐004
GE‐005
GA‐027s GA‐027r
GA‐024
GA‐023d
GA‐025
GA‐024a C0‐05a‐1
GA‐023c
GA‐023
BA‐023a
GA‐022 GA‐021
GA‐006a
GA‐016dC0‐05‐1
GA‐015
GA‐005a
GA‐005
GA‐027a
GA‐029a
C 0‐ b‐
GA‐0xx
GA‐008a
CONSTRUCTION
LAYDOWN
CONFERENCE/
TRAINING
POOL SERVICE ROOM
OFFICE
MH INTERN
EDUCATION
OFFICE
MULTI‐PURPOSE
TRAINING
CENTER
CONFERENCE/
TRAINING
MENS RESTROOM
SHOWERS AND LOCKERS
WOMENS RESTROOM
SHOWERS AND LOCKERS
FIRE
CHIEF
NURSE MH
M.A.T. ADMIN
POLICE
CORRIDOR
FIRE
WOMENS RESTROOM
MENS RESTROOM
PATIENT RECORD
FILE ROOM
LOBBY
STORAGE
STAIR #9
ELECTRICAL
MECHANICAL
EMERGENCY ELECTRICAL
TELECOMMUNICATIONS
SIGNAL
DOCTORS
WORKROOM
DOCTORS
WORKROOM
RELEASE OF INFORMATION
ELECTRICAL
RESTROOM
FIRE CORRIDOR
ELECTRICAL
OLD GRAPHIC CONTROL
A/C & REFRIGERATION
/SHEET METAL SHOP
‐‐‐‐ ELECTRICAL
MHBS
IT CLOSETCORRIDOR
EDUCATION
EQUIPMENT
STORAGE
MHBS
MHBS
WAITING
OFFICE
C O
RR
ID
O R
OFFICE
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT Office of Construction and
Facilities Management
Drawn
COUNTER
APPOINTMENTS
WOMENS STAFF
RESTROOM
STAIR #9
EMERGENCY
ROOM #3
LOBBY
EMERGENCY
ISOLATION
ROOM
EMERGENCY
ISOLATION
ROOM
ADPAC
RESTROOM READING ROOM
CONTROL ROOM
ICE MACHINE CORRIDOR
64 SLICE EXAM WAITING
CORRIDOR
ALPHA CHECK IN INTERNAL
MEDICINE
VESTIBULE
PYXIS
SUPPLY
RESPIRATORY
ABG/OFFICE
SUPPLY
EQUIPMENT
EMERGENCY
ROOM #4&5
RESTROOM
DUMB WAITER
E.D. CHECK IN ---- OUTPATIENT X-RAY
OUTPATIENT X-RAY
OFFICE/EXAM
CORRIDOR
OFFICE/EXAM
CORRIDORCORRIDOR
WAITING AREA
WOMENS RESTROOM
WAITING AREA
CORRIDOR
EXAM
CAST ROOM
EXAM
EXAM
EXAM
EXAM
EXAM
FIRE
STORAGEH.A.C.
MENS RESTROOM
RESTROOM
EXAM
EXAM
EXAM
NURSE TRIAGE
EXIT INTERVIEW
NURSE COORDINATOR
NURSE MANAGER
ELECTRICAL
CO
RR
IDO
R
CO
RR
IDO
R
CO
RR
IDO
R
CO
RR
IDO
R CO
RR
IDO
R
CORRIDOR
PATIENT REGISTER
OFFICE/EXAM
OFFICE OFFICE/EXAM OFFICE/EXAM OFFICE/EXAM OFFICE/EXAM OFFICE/EXAM
OFFICE/EXAMEXAM/
EYE LANE
OFFICE/EXAMOFFICE/EXAMOFFICE/TRIAGE
EXAM
EXAM
EXAM
----EXAM
EXAM
TRIAGE
COMMUNICATIONS
OPERATIONS ROOM
HOLDING
GUN LOCKER
122 SF
S1-09-1 1A-138
1A-115d
1A-115c
1A-135
1A-1xx
1A-134
1A-133
1A-130
1A-130a 1A-126
1A-125a
1A-130b C1-06-1
1A-125 1A-106u 1A-106t
C1-53-1
1A-106w 1A-106y V1-03-1
1A-123
1A-123a
1A-127
1A-131
1A-131a
1A-135
1A-137
1A-138
1A-141 1A-118 1A-117
1A-117b
1A-117a
1A-106g
C1-08a-1
1A-114
1A-106f
C1-04-1C1-0-1
1A-115
1A-145
1A-155
C1-10-1
1A-162
1A-160
1A-158
1A-156
1A-154
1A-152
1A-151
1A-151a
1A-1531A-148
1A-146
1A-150a 1A-150
1A-163
1A-169
1A-161
1A-157a
1A-164
1A-164a
C1 -52
-1
C1 -08
-1
C1 -07
-1 C1
-09 -1
C1 -12
-1
C1-53-1
1A-106d
1A-106e
1A-106b 1A-106c
1A-121 1A-106i 1A-106j 1A-106k 1A-106l 1A-106m
1A-106n1A-106p1A-106q1A-106r1A-106s
1A-112a
1A-112b
1A-166
1A-165
1A-167
1A-112c1A-168
1A-170
1A-131b
1A-131c
1A-131d
1A-144
1A-140
1A-115
1A-147
1A-147b 1A-147a hallway7'-6 5/8" wide
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT Office of Construction and
Facilities Management
Drawn
02/15/202402/15/2024
O A
OO
UP
N
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT Office of Construction and
Facilities Management
Drawn
SOUT
UCT
S A T
CENTRA UCT
S A TS
SER ICE
S A T
UCT
O
UP
N
S C-
Q
Q
W
W
SS
Q
W
S
S
S
Q
V
CO
RR
IDO
R
ELEVATOR LOBBY
CLEAN UTILITY
H.A.C.
ELEVATOR LOBBY
NUCLEAR
MEDICINE
ELEVATOR LOBBY
NUCLEAR
MEDICINE
FIRE
BREAK ROOM CLEAN LINEN
NURSE
MANAGER
DIRTY
UTILITY
RESTROOMRESTROOM
CLEAN AND
EQUIPMENT
ROOM
CORRIDOR
CO
RR
IDO
R
CORRIDORCORRIDOR
CO
RR
IDO
R
RECOVERY
RR/CHNG
RR/CHNG
NURSE SUP.
OFFICE
MECHANICAL
STORAGE
DIRTY
FAMILY WAITING
NURSING
STATION
STORAGETELECOMRESTROOM
ANESTHES.
STORAGE H.A.C.
RESTROOM
EXAM ROOM
EXAM ROOMEXAM ROOM
EXAM ROOMEXAM ROOMEXAM ROOMEXAM ROOM
PROCEDURE
ROOM
PROCEDURE
ROOM
PROCEDURE
ROOM
STERILE
STORAGE
PROCEDURE
ROOM
PROCEDURE
ROOM
C3 -09
-1
3A-3xx 3B-301
3B-322
3A-336 3A-334
3A-335
3A-333
3A-302a
3A-302 3A-369
3A-3683A-370
3A-368a3A-301a
3A-301
C3-01-1
C3 -04 a-1
C3-04-1C3-03-1
C3 -02
-1
3A-328a
3A-328d
3A-328e
3A-335
3A-326
3A-328b
3A-325
3A-332
3A-331
3A-300
3A-310a3A-310b3A-315 3A-316
3A-307 3A-305
3A-303
3A-3043A-306
3A-3083A-3093A-3123A-313 3A-317
3A-318
3A-319
3A-321
3A-323
3A-324
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT Office of Construction and
Facilities Management
Drawn
BCS
SN
SOUTH
DUCT
SHAFT
CENTRAL DUCT
SHAFTS
MECH.
CHASE
BOILER
STACK
SERVICE
LOBBY
DUCT
SHAFT
UP
DN
SVC-1
tub
CO
RR
IDO
R
CO
RR
IDO
R
CO
RR
IDO
R
CO
RR
IDO
R
RESTROOM
RESTROOM
SOCIAL WORK
OFFICE
WAITING
ASSIST. CHIEF
NURSE ACUTE CARE
ELEVATOR LOBBY
OFFICE
RESTROOM
CORRIDOR
RESTROOM
1 BED ROOM1 BED ROOMCHIEF ACUTE
CARE NURSING
SOILED
UTILITY
RESTROOMRESTROOMRESTROOMRESTROOMRESTROOM
ICE MACHINE
DRUG STORAGE
NURSE STATION
PYXIS SOCIAL
WORKER
CORRIDOR
BREAK ROOM DECEDANT
AFFAIRS
FIRECORRIDOR
ELEVATOR LOBBY
RESTROOM
RESTROOM
RESTROOM
RESTROOM
1 BED ROOM
RESTROOM
RESTROOM RESTROOM RESTROOM
ELECTRICAL
1 BED ROOM
RESTROOM
1 BED ROOM
1 BED ROOM
RESTROOM
1 BED ROOM1 BED ROOM1 BED ROOM
2 BED ROOM
CLEAN
NURSE MANAGER
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM
4 BED ROOM 2 BED ROOM
ACUTE CARE
MED SURG
CASE WORKER
PHYSICIAN
OFFICE
SURGICAL
CARE
NUTRITIONAL
SUPPORT
CLEAN SUPPLY
DECEDANT
AFFAIRS
C4 -17
-1
C4 -04
-1
C4 -02
-1
C4 -09
-1
4A-437
4A-438
4A-440a
4A-439
4A-442a
4A-469
4A-435
4A-402
4A-468a
C4-07-1
4A-466a
4A-4674A-4684A-4704A-401
4A-401a4A-404a4A-406a4A-4114A-413a
4A-415
4A-408a
4A-408
4A-430 4A-432
C4-03-1
4A-407 4A-402b
4A-402aC4-01-1
4A-436
4A-419a
4A-420a
4A-422a
4A-423a
4A-424
4A-424a
4A-426a 4A-427 4A-428a
4A-426b
4A-425
4A-418a
4A-418 4A-417
4A-417a
4A-4034A-4044A-405
4A-406
4A-410b
4A-410 4A-413
4A-419
4A-420
4A-422
4A-423
4A-426 4A-428 4A-431
4A-434
4A-434a
4A-429
4A-433
48x30
VA FORM 08-6231
Date:
Drawing Title:
Approved Project Director
Project Title:
590 MEANS ST NW
Phase Project Number
Building Number
Drawing NumberLocation
Issue Date CheckedFULLY SPRINKLERED
STAMP
STE. 200
ATLANTA, GA 30318
ARCHITECT/ENGINEER OF RECORDCONSULTANT…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .